• Title/Summary/Keyword: Rail Inspection

Search Result 90, Processing Time 0.032 seconds

A Research for the Opinion of Railway Users with the Introduction of Security Inspection System (철도 보안검색시스템 도입에 관한 이용자의 인식 연구)

  • Lee, Jangho;Kim, Hun
    • Journal of the Society of Disaster Information
    • /
    • v.9 no.1
    • /
    • pp.113-122
    • /
    • 2013
  • As the patronage of railroad increased, the government tried to introduce several the railroad safety program. The introduction of security inspection system in railroad is also considered with this background. In this paper, we examined the foreign cases in U.S., Spain, and China. Also, we surveyed the railroad users' opinion with the security inspection system and analyzed the results of survey for the sufficient preparation for it. Consequently, we suggested the introduction of high-speed rail station by way of showing an example.

Urban Rail Power Facilities on-site Implementation of an Integrated System Diagnosis (도시철도 전력설비 상태진단 통합시스템 현장구현)

  • Im, Hyeong-Gil;Lee, Byung-Du;Kim, Yong-Duk;Jang, Soon-Ho
    • Proceedings of the KSR Conference
    • /
    • 2011.10a
    • /
    • pp.2015-2020
    • /
    • 2011
  • Key set the current non-urban rail power failure of equipment to operate the railway will generate a lot of problems. I know in advance the ideal of power equipment to prevent the failure to derive an efficient replacement cycle for the power equipment monitoring and diagnosis of the condition can become necessary to develop a system. In order to determine the status of the power plant during operation and behavior of the partial discharge current state data, regular monitoring and inspection requirements also stamp the basic current, voltage, temperature and humidity should be identified.

  • PDF

Fracture Mechanical Study on the Charpy V-notch and Fatigue Crack Propagation 8ehavior of Rail Steels (레일강의 샬피거동 및 피로균열 성장거동에 관한 파괴역학적 고찰)

  • Kim, Sung Hoon
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.14 no.6
    • /
    • pp.1319-1327
    • /
    • 1994
  • Since fatigue cracks in rail can be the source of fractures and subsequent derailments, quantitative evaluation of the fatigue behavior and fracture properities due to the analysis results of laboratory test are drawn on the basis for predicting fatigue life and making a decision of safe inspection interval. Charpy V-notch and fracture toughness behavior were evaluated from the results of Charpy impact test. Fatigue test was performed by using CT type specimen under constant amplitude loading, and finally the effects of the following parameters; crack orientation, temperature, and stress ratio, on the fatigue crack growth behavior were studied.

  • PDF

A Study on the management of state-run railroads (국유철도 재산관리 기반체계 구축방안 연구)

  • Kang, Yu--Shin;Choo, Jun-Sup;Kim, Jong-Tae
    • Proceedings of the KSR Conference
    • /
    • 2008.06a
    • /
    • pp.2250-2257
    • /
    • 2008
  • This study examined the existing issues and current status of how to best approach the establishment of railroad asset of the corporation in the long run. It also explored some preventative measures for further problems. Based on the law of state property and related railroad statutes, the research referred to basic plans for railroad management of Korea Rail Network Authority, the outcome of file research, handbook of asset management, guidelines and policy of Ministry of Finance and Economy for state property management, recommendations of the Board of Audit and Inspection and fact-finding research of state property (miscellaneous properties). The findings are making a few suggestions on the service of the Korea Rail Network Authority and Korail.

  • PDF

Safety Margin Evaluation of Railway wheel Based on Fracture Scenarios

  • Kwon, Seok Jin;Lee, Dong Hyung;Seo, Jung Won;Kwon, Sung Tae
    • International Journal of Railway
    • /
    • v.5 no.2
    • /
    • pp.84-88
    • /
    • 2012
  • Derailment due to wheel failure would cause a tremendous social and economical cost in service operation. It is necessary to evaluate quantitatively the safety with respect to high-speed train. Although the safety of railway wheel has been ensured by an regular inspection, all critical defects cannot be detected in inspection cycles and the wheel has been replaced because a defect quickly become critical for safety. Therefore, it is important to calculate quantitatively the fracture limit and remnant life of damaged railway wheel in wheel-rail system. In present paper, the critical crack size of wheel for high-speed train is simulated based on fracture scenario and the safety of wheel is evaluated.

A Study on Efficient Activities in Railway Safety Guidance (효율적인 철도안전지도 활동에 관한 연구 한국철도공사 중심으로 -)

  • Kim, Tae-gil;Kim, Ki-Young;Kang, Kyung-sik
    • Journal of the Korea Safety Management & Science
    • /
    • v.17 no.3
    • /
    • pp.81-88
    • /
    • 2015
  • Infrastructure such as tracks, catenary, rolling stock and signaling systems, and close interface with the human factors of train drivers, shunting staff and maintenance staff are required for train operations. Safety management is the most essential part for the functioning of a train. In line with the safety management, each rail operator has a safety guidance system and the Ministry of Land, Infrastructure and Transport operates Railway Safety Inspector system. Safety Inspector System is to train employees working in the field to be aware of rules and regulations, and to improve identified risk factors. Hence, it is necessary to establish systematic training and inspection methods for safety guidance staff and make clear the roles and responsibilities of safety inspectors according to the Occupational Safety and Health Act, and safety instructors for several inspections according to the Railroad Safety Act.

Understanding Facility Management on Tunnel through Text Mining of Precision Safety Diagnosis Data (터널시설물 점검진단 데이터의 텍스트마이닝 분석을 통한 유형별·지역별 중점 유지관리요소의 이해)

  • Seo, Jeong-eun;Oh, Jintak
    • Journal of Korean Association for Spatial Structures
    • /
    • v.21 no.3
    • /
    • pp.85-92
    • /
    • 2021
  • The purpose of this paper is to understand the key factors for efficient maintenance of rapidly aging facilities. Therefore, the safety inspection/diagnosis reports accumulated in the unstructured data were collected and preprocessed. Then, the analysis was performed using a text mining analysis method. The derived vulnerabilities of tunnel facilities can be used as elements of inspections that take into account the characteristics of individual facilities during regular inspections and daily inspections in the short term. In addition, if detailed specification information and other inspection results(safety, durability, and ease of use) are used for analysis, it provides a stepping stone for supporting preemptive maintenance decision-making in the long term.

Research on Vibration and Noise Characteristics of Steel Plate Girder Bridge with Embedded Rail Track System (레일매립궤도 시스템이 적용된 판형교의 진동 및 소음특성에 대한 연구)

  • Park, Jeung-Geun;Koh, Hyo-In;Kang, Yun-Suk;Jeong, Young-Do;Yi, Seong-Tae
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.23 no.1
    • /
    • pp.94-101
    • /
    • 2019
  • Most of the existing rail structures have undergone a lot of aging since a considerable period of time has passed from completion. In particular, among existing railway bridges, many of the plate girder bridges are older bridges that have lived 40 to 60 years or more. Since the treadmill is directly connected to the girder without the ballast, the running load of the vehicle is directly transmitted to the bridge. Therefore, the shock and noise applied to the bridge are larger than those of the ballast bridge, and the dynamic shock and vibration are also relatively large. Therefore, it is very urgent to develop appropriate maintenance, repair and reinforcement technology for existing steel plate bridge. In this study, the authors introduced the characteristics of embedded rail (ERS) developed for improving the performance of the existing plate girder bridge and the techniques solving the vibration and noise problems. In order to evaluate the vibration and noise reduction performance of ERS, a non-ballast plate girder bridge with 5m length of sleepers installed and a plate girder bridge with ERS were fabricated. And, then, the vibration response generated under the same excitation condition was measured and analyzed. Also, the radiated noise analysis was performed using the vibration response data obtained from the experiment as the input data of the acoustic analysis model. As a result of experiments and analyses, it was confirmed that the plate girder bridge's vibration using ERS was reduced by 15.0~18.8dB and the average noise was reduced by 7.7dB(A) more than the non-ballast bridge.

Prediction of Surface Crack Growth Considering the Wheel Load Increment Due to Rail Defect (레일손상에 의한 윤중증가를 고려한 표면균열 성장예측)

  • Jun, Hyun-Kyu;Choi, Jin-Yu;Na, Sung-Hoon;You, Won-Hee
    • Journal of the Korean Society for Precision Engineering
    • /
    • v.28 no.9
    • /
    • pp.1078-1085
    • /
    • 2011
  • Prediction of a minimum crack size for growth, which is defined as a crack size that grows fast enough to keep ahead of its removal by contact wear and periodic grinding, is the most demanding work to prevent rail from fatigue failure and develop cost effective railway maintenance strategy In this study, we investigated the wheel load increment due to a rail defect during a train ran over it, and its effect on the minimum crack size for growth. For this purpose, we developed simulation software based on the Fletcher and Kapoor's "2.5D" model and measured wheel load increment during a train passed over a defect. A maximum contact pressure and contact patch size were calculated by 3D FEM and crack growth analyses were performed by varying two of dominant contact contributors; surface friction coefficient(0.1, 0.2, 0.3 and 0.4) and crack aspect ratio. The minimum crack sizes for growth were calculated from 0.29 to 1.44mm depending on the contact conditions. They were decreasing with increasing surface friction coefficient and decreasing with crack aspect ratio(a/b).

A Novel Third-Order Cascaded Sigma-Delta Modulator using Switched-Capacitor (스위치형 커패시터를 이용한 새로운 형태의 3차 직렬 접속형 시그마-델타 변조기)

  • Ryu, Jee-Youl;Noh, Seok-Ho
    • Journal of the Korea Institute of Information and Communication Engineering
    • /
    • v.14 no.1
    • /
    • pp.197-204
    • /
    • 2010
  • This paper proposes a new body-effect compensated switch configuration for low voltage and low distortion switched-capacitor (SC) applications. The proposed circuit allows rail-to-rail switching operation for low voltage SC circuits and has better total harmonic distortion than the conventional bootstrapped circuit by 19 dB. A 2-1 cascaded sigma-delta modulator is provided for performing the high-resolution analog-to-digital conversion on audio codec in a communication transceiver. An experimental prototype for a single-stage folded-cascode operational amplifier (opamp) and a 2-1 cascaded sigma-delta modulator has been implemented m a 0.25 micron double-poly, triple-metal standard CMOS process with 2.7 V of supply voltage. The 1% settling time of the opamp is measured to be 560 ns with load capacitance of 16 pF. The experimental testing of the sigma-delta modulator with bit-stream inspection and analog spectrum analyzing plot is performed. The die size is $1.9{\times}1.5\;mm$.