Urban Rail Power Facilities on-site Implementation of an Integrated System Diagnosis

도시철도 전력설비 상태진단 통합시스템 현장구현

  • Published : 2011.10.20

Abstract

Key set the current non-urban rail power failure of equipment to operate the railway will generate a lot of problems. I know in advance the ideal of power equipment to prevent the failure to derive an efficient replacement cycle for the power equipment monitoring and diagnosis of the condition can become necessary to develop a system. In order to determine the status of the power plant during operation and behavior of the partial discharge current state data, regular monitoring and inspection requirements also stamp the basic current, voltage, temperature and humidity should be identified.

Keywords