An Estimation Model of Historical Cost Using BIM Library for Road Project (도로분야 BIM 라이브러리를 활용한 실적공사비 산정모델 구축)

  • Moon, HyounSeok;Ju, KiBeom
    • Korean Journal of Computational Design and Engineering
    • /
    • v.20 no.4
    • /
    • pp.431-442
    • /
    • 2015
  • Currently, a BIM-based quantity takeoff (QTO) system is mainly focused on architectural projects. To perform this, diverse quantity takeoff methods such as an object-based automatic quantity takeoff, manual quantity and base functions of calculation have widely been utilizing. However, since BIM library for road projects includes structural elements associated with alignment, it is necessary to establish cost estimation system interlocked with historical cost using 3D library by each unit length. Accordingly, the aim of this study is to develop cost estimation model with using a historical cost approach so that it can be utilized in construction planning based on the BIM library for road projects. For this, based on the BIM library for road, the standardized quantity is estimated, and a process for calculating historical cost and a verification model with a 5D simulation was developed by mapping a WBS code with each BIM library object. This can be applied during the approximate cost estimation process in a project planning and an initial design phase for road projects. Besides, it is expected that these results will be utilized in constructing an optimal historical cost estimation process for project libraries.

AN AUTOMATED FORMWORK MODELING SYSTEM DEVELOPMENT FOR QUANTITY TAKE-OFF BASED ON BIM

  • Seong-Ah Kim;Sangyoon Chin;Su-Won Yoon;Tae-Hong Shin;Yea-Sang Kim;Cheolho Choi
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.1113-1116
    • /
    • 2009
  • The attempt to use a 3D model each field such as design, structure, construction, facilities, and estimation in the construction project has recently increased more and more while BIM (Building Information Modeling) that manages the process of generating and managing building data has risen during life cycle of a construction project. While the 2D Drawing based work of each field is achieved in the already existing construction project, the BIM based construction project aims at accomplishing 3D model based work of each field efficiently. Accordingly, the solution that fits 3D model based work of each field and supports plans in order to efficiently accomplish the relevant work is demanded. The estimation, one of the fields of the construction project, has applied BIM to calculate quantity and cost of the building materials used to construction works after taking off building quantity information from the 3D model by a item for a Quantity Take-off grouping the materials relevant to a 3D object. A 3D based estimation program has been commonly used in abroad advanced countries using BIM. The program can only calculate quantity related to one 3D object. In other words, it doesn't support the take-off process considering quantity of a contiguous object. In case of temporary materials used in the frame construction, there are instances where quantity is different by the contiguous object. For example, the formwork of the temporary materials quantity is changed by dimensions of the contiguous object because formwork of temporary materials goes through the quantity take-off process that deduces quantity of the connected object when different objects are connected. A worker can compulsorily adjust quantity so as to recognize the different object connected to the contiguous object and deduces quantity, but it mainly causes the confusion of work because it must complexly consider quantity of other materials related to the object besides. Therefore, this study is to propose the solution that automates the formwork 3D modeling to efficiently accomplish the quantity take-off of formwork by preventing the confusion of the work which is caused by the quantity deduction process between the contiguous object and the connected object.

  • PDF

A Study on the Estimation Process of Material handling Equipment for Offshore Plant Using System Engineering Approach (시스템엔지니어링 기반 해양플랜트 Material handling 장비 수량산출 프로세스에 관한 연구)

  • Han, Seong-Jong;Seo, Young-Kyun;Cho, Mang-Ik;Kim, Hyung-Woo;Park, Chang-soo
    • Journal of the Korean Society of Industry Convergence
    • /
    • v.22 no.6
    • /
    • pp.785-795
    • /
    • 2019
  • This paper is a study on the modeling of the quantity estimation model for offshore plant Material handling equipment in FEED(Front End Engineering Design) verification stage using system engineering approach which is an engineering design methods. The relevant engineering execution procedure is not systemized although the operation method and Material handling equipment selection with weight and space constraints is a key part of the FEED. Using the system engineering process, the stakeholder requirements analysis process, the system requirements analysis, and the final system architecture design were sequentially performed, and the process developed through the functional development diagram and Requirement traceability matrix (RTM) was verified. In addition, based on the established process, we propose a Material handling quantity estimation model and Quantity calculation verification Table that can be applied at the FEED verification stage and we verify the applicability through case studies.

A Study on 3D Data Model Development by Normalizing and Method of its Effective Use - Focused on Building Interior Construction - (정규화를 통한 3차원 데이터 모델 구축 및 활용성 향상 방안 연구 -건축 마감 공사 중심으로 -)

  • Lee, Myoung-Hoon;Ham, Nam-Hyuk;Kim, Ju-Hyung;Kim, Jae-Jun
    • Journal of The Korean Digital Architecture Interior Association
    • /
    • v.10 no.3
    • /
    • pp.11-18
    • /
    • 2010
  • Cost estimation through fast and correct quantity take offs are crucial in the process of construction project. The existing methods for cost estimation are mainly based on 2D-based drawings and the estimation result tends to be different according to the estimator's experience, the quality and quantity of used information and estimation time. To solve these problems, the domestic construction industry have recently tried to use the data extracted from 3D data modeling based on BIM(Building Information Modeling) in order to achieve more accurate and objective cost estimation. However it tends to increase dramatically the quantity of information that can be used in cost estimation by estimators. Therefore in order to achieve quality information data from 3D data modeling, the characteristics of the project should be reflected on the 3D model and it is most important to extract information only for cost estimation from the whole 3D model fast and accurately. Thus this study aims to propose the 3D modeling method through Data Normalization which maximizes the usability of 3D Data modeling in cost estimation process.

Improvement of BoQ Documents for the BIM based Quantity Takeoff (BIM기반 물량 및 내역정보 생성을 위한 내역서 개선방안)

  • An, Ji-Won;Yun, Seok-heon
    • Journal of KIBIM
    • /
    • v.7 no.2
    • /
    • pp.16-24
    • /
    • 2017
  • It is very important to estimate accurate construction total cost needed early in the project. In the initial phase of the design, the project cost estimates are determined by total quantity from design documents and the variables that affect the calculation of the total cost of the project. In order to determine accurate total construction cost, the contractor has to produce detailed quantity information based on the drawings and specifications. The process of preparing quantification and cost estimation documents is still being worked out manually, and a lot of errors have been occurred in many cases. Recent advances in information technology have led to the BIM based quantity takeoff and cost estimation. However, there are some limits to the extent to which the current specifications for BoQ documents are computed from BIM model. This research analyze the current BoQ cases and analyze how to make quantity takeoff possible through BIM. The study defined five levels of quantity category that could be produced by BIM. Only about 40% or indirectly usable items can be used when information is extracted to BIM modelling. This is very insufficient to fill out the BoQ. The BoQ document structure quantity takeoff specifications should be simplified in order to BIM based cost estimation more efficiently.

Open BIM-based quantity take-off system for schematic estimation of building frame in early design stage

  • Choi, Jungsik;Kim, Hansaem;Kim, Inhan
    • Journal of Computational Design and Engineering
    • /
    • v.2 no.1
    • /
    • pp.16-25
    • /
    • 2015
  • Since construction projects are large and complex, it is especially important to provide concurrent construction process to BIM models with construction automation. In particular, the schematic Quantity Take-Off (QTO) estimation on the BIM models is a strategy, which can be used to assist decision making in just minutes, because 70-80% of construction costs are determined by designers' decisions in the early design stage. This paper suggests a QTO process and a QTO prototype system within the building frame of Open BIM to improve the low reliability of estimation in the early design stage. The research consists of the following four steps: (1) analyzing Level of Detail (LOD) at the early design stage to apply to the QTO process and system, (2) BIM modeling for Open BIM based QTO, (3) checking the quality of the BIM model based on the checklist for applying to QTO and improving constructability, and (4) developing and verifying a QTO prototype system. The proposed QTO system is useful for improving the reliability of schematic estimation through decreasing risk factors and shortening time required.

A System Development of Quantity Data Type Analysis for BIM based Automation of Estimation Framework (BIM기반 견적자동화 체계구축을 위한 물량 데이터 유형 분석 체계 개발)

  • Lee, Jae-Joon;Shin, Tae-Hong;Kim, Seong-Ah;Kang, Myung-ku;Chin, Sang-Yoon
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.744-747
    • /
    • 2008
  • Quantity information focused on a design drawing plays a critical role in a decision making related to cost for project participants during project life cycles. Related participants absolutely depend on quantity take-off working which produces the quantity information by hand, and then a worker's mistake often causes many errors. The difference of quantity by the know-how of the person in charge of the estimation also occurs. In addition, the worker passes through the whole quantity take-off processes again in case of re-working for quantity take-off produced by a change order. The requirements about the automated estimation increase because of the needs for the accurate quantity take-off and dealing with the change order and recently, the studies about the automated estimation working process based on 34 cad model from 3d cad modeler are attempted in various viewpoints. However, the existing studies reach the limits such as common quantity data type framework for getting Quantity information. Focused on a certain 34 cad modeler and BIM based automation of estimation using it Therefore, the objective of this study is to develop the a series of system which can extract, analyze, and verify Quantity Data Type in modeler to automate quantity take-off originated from various 3d cad modelers as a foundation study for BIM based automation of estimation framework.

  • PDF

Analysis of Cost Estimate Method Based on Engineering 3D Model for Nuclear Power Plant Construction Project (엔지니어링 3D모델 기반 원전 건설사업비 산정방안 분석)

  • Lee, Sang-Hyun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2018.05a
    • /
    • pp.294-295
    • /
    • 2018
  • Nowadays, the construction industry utilizes 3D models in the designing process, on which research is being conducted to establish an automated system for project cost estimation in connection with information related to construction such as material unit costs and wages, beyond the level of design interference review and construction quantity estimation. In this process, the project cost is estimated in connection with unit price data after takeoff the quantity based on the 3D model attributes and data types. A way to reduce cost and risk would be first developing prototypes of some of essential buildings and works, comparing and validating the outcomes, and then extending to the whole scope, because estimates differ on the basis of the scope and level of 3D design models as well as the data accuracy. This study analyzes case studies of project cost estimation by computing the quantity on the basis of 3D model in the construction industry and explores methodologies and management measures applicable for estimating nuclear power plant construction project costs.

  • PDF

Computer나 Calculator를 이용한 계산에서 오류 교정을 위한 어림셈 지도에 관한 연구

  • Gang Si Jung
    • The Mathematical Education
    • /
    • v.29 no.1
    • /
    • pp.21-34
    • /
    • 1990
  • This is a study on an instruction of estimation for error correction in the calculation with a computer or a calculator. The aim of this study is to survey a new aspect of calaulation teaching and the teaching strategy of estimation and finally to frame a new curriculum model of estimation instruction. This research required a year and the outcomes of the research can be listed as follows: 1. Social utilities of estimation were made clear, and a new trend of calculation teaching related to estimation instruction was shown. 2. The definition of estimation was given and actual examples of conducting an estimation among pupils in lower grades were given for them to have abundant experiences. 3. The ways of finding estimating values in fraction and decimal fraction were presented for the pupils to be able to conduct an estimation. 4. The following contents were given as a basic strategy for estimation. 1) Front-end strategy 2) Clustering strategy 3) Rounding strategy 4) Compatible numbers strategy 5) Special numbers strategy 5. In an instuction of estimation the meaning, method. and process of calculation and calculating algorithm were reviewed for the cultivation of children's creativity through promoting their basic skill, mathematical thinking and problem-solving ability. 6. The following contents were also covered as an estimation strategy for measurement 1) Calculating the sense of quantity on the size of unit. 2) Estimating the total quantity by frequent repetition of unit quantity. 3) Estimating the length and the volume by weighing. 4) Estimating unknown quantity based on the quatity already known. 5) Estimating the area by means of equivalent area transformation. 7. The ways of instructing mental computation were presented. 8. Reviews were made on the curricular and the textbook contents concerning estimation instructions both in Korea and Japan. and a new model of curriculum was devised with reference to estimation instruction data of the United States.

  • PDF

A Development Strategy for Construction method based Estimation System (공법 기반 견적 시스템 개발 전략)

  • Kim, Seong-Ah;Kang, Myung-Ku;Yoon, Su-Won;Park, Young-Jin;Chin, Sang-Yoon;Choi, Cheol-Ho
    • Proceedings of the Computational Structural Engineering Institute Conference
    • /
    • 2007.04a
    • /
    • pp.341-345
    • /
    • 2007
  • The objective of this paper is to introduce a project on developing construction method based estimation system. It means a 3D product model based estimation system to effectively and efficiently manage estimation process during the project life-cycle. This paper describes a outline and method for 3D based estimation system. Normally, it is not easy to take-off the quantity from 3D CAD model, because of all different depths of the quantity take off in each design development stage and nation. This study shows how to keep the balance of its depths in each design development stage such as schematic design, detail design, shop drawing, and so forth.