• Title/Summary/Keyword: Public Construction

Search Result 2,512, Processing Time 0.028 seconds

A Study on the Construction Plan of Machinery Public Platform through the Survey of the Construction Machinery Rental Market

  • Chang Wook Kim;Myeong Jin Jeong;Hyo Bae Lee;Jong Kwan Ho;Myeong Gu Lee
    • International Journal of Internet, Broadcasting and Communication
    • /
    • v.15 no.4
    • /
    • pp.311-325
    • /
    • 2023
  • In the construction machinery rental market, there are frequent cases of sublease through large-scale rental companies or rental through mediation organizations without legal grounds. In addition, institutional improvement of the construction machine safety management system has been required due to concerns over the internalization of legal inspections due to the lack of type approval data and construction machine history management during the construction machine inspection process. The government is responsible for securing safety of construction machinery and promoting mechanization of construction machinery by efficiently managing the construction machinery market by setting safety management such as type approval, registration, and inspection of construction machinery. In order to efficiently implement this, it is required to establish a platform for renting construction machinery and collecting safety management information. We presented a plan to build a public platform for construction machinery to secure the soundness of the construction machinery rental market and to improve safety management.

A Comparative Study on the Usage Level of Construction Management Services during Pre-Construction Stages - Focused on Public and Private Building Projects - (시공이전단계 CM서비스 활용수준 비교에 관한 연구 - 공공 및 민간 건축CM사업을 중심으로-)

  • Cho, Hong-Keun;Kim, Han-Soo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.12 no.3
    • /
    • pp.112-120
    • /
    • 2011
  • Since early 2000s, the use of construction management(CM) in the public and private building sectors has rapidly grown in Korea. In addition, the use of CM services during pre-construction stages has been increasingly recognized as a critical factor to succeed in construction projects. Understanding clients' needs of pre-construction CM services is important for CM firms to strategically prepare and cope with market needs. The objective of the paper is to investigate and compare the usage level of CM services in public and private building projects during pre-construction stages, and to identify key characteristics and implications for CM firms. The paper identified that although there are some differences in CM service needs between public and private sectors, time management and cost management commonly showed the higher usage level.

A development of indicators for public construction technology policy evaluation (공공건설기술 정책평가를 위한 지표 개발에 관한 연구)

  • Lee, Du-Heon;Lee, Kyo-Sun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2011.11a
    • /
    • pp.191-193
    • /
    • 2011
  • The government has performed various countermeasures and policies for the efficiency of Construction Industry. However the analysis of the policy performance is not satisfied. In the study we benchmarked the construction performance evaluation system and indicators which was performed by advanced countries like the United States and the United Kingdom. So we suggested indicators for measuring performance of public construction cost saving strategy performed in 2008 by the Ministry of Land, Transport and Maritime Affairs. This paper will provide the basis for establishing future construction policies or plans.

  • PDF

A Strategy of Construction through Rationally Adapting JV(Joint Venture) in Large Public Constructions (대형공공공사에 J/V(Joint Venture)시스템의 합리적 도입을 통한 건설사업 효율화 전략)

  • 이태식;김용천;박동찬;선우강;김열규
    • Proceedings of the KSR Conference
    • /
    • 2001.05a
    • /
    • pp.24-29
    • /
    • 2001
  • Despite of the introduction some sorts of the contract and the bid method like CM(Construction management) that will be efficient to manage the construction project. Korean agencies limit to control project management to do large public constructions. In the case of Taiwan, THSRC is apply J/V system in the public construction project, they are accomplishing that expend optimal the cost and save the construction time. To success J/V it has two factors, one is risk management and another is sharing information of construction project. Therefore, we will study to introduce J/V system to our construction project.

  • PDF

A Study of Complaint and Conflict Factors in Construction Projects (건설사업의 민원 및 갈등 요인 도출에 관한 연구)

  • Lee, Ju-Hui;Mun, Jun-bu;Lee, Chang-jun;Yun, Sung-min
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2021.05a
    • /
    • pp.279-280
    • /
    • 2021
  • The conflict is gradually increasing and becoming more serious in Korea. Especially, there are many conflict among stakeholders in public construction projects and its economic, social effects are enormous. This negatively affects the performance of construction projects, such as schedule delay and increasing construction costs. Complaints are often extended to public conflicts so that complaints have to be considered for conflict management. However, complaints and conflicts were distinguished and have been studied differently in previous studies. In this research, the literature that analyzed complaints and conflict factors was reviewed, and the complaint that included the conflict factors were categorized and derived.

  • PDF

Developing noise prediction software for Improvement of the construction noise management (공사장 소음 관리 효율화를 위한 소음예측프로그램 개발)

  • An, Jang-Ho;Lee, Jun-Seo
    • Proceedings of the Korean Society for Noise and Vibration Engineering Conference
    • /
    • 2009.04a
    • /
    • pp.155-156
    • /
    • 2009
  • Construction companies can easily understand present noise condition of their construction site via C-Noise. C-Noise is noise simulation software that simple to use. Construction companies spend time and cost for public complaints about construction noise. Construction site noise management using noise simulation software like C-Noise can reduce public complaint. achieve cost reduction to treat it.

  • PDF

A Study on Improvement Measures for the Design Documents Delivery System in Public Road Construction Projects (공공 도로건설사업에서의 설계도서 납품체계 개선방안에 관한 연구)

  • Ok, Hyun;Kim, Seong-Jin;Kim, Tae-Hak;Ju, Ki-Bum
    • International Journal of Highway Engineering
    • /
    • v.20 no.2
    • /
    • pp.45-55
    • /
    • 2018
  • PURPOSES : This study aims to survey and analyze the status of the design and completion documents output delivery system in public construction projects in order to assess the problems of the Ministry of Land, Infrastructure and Transport (MOLIT)'s electronic delivery system, with a focus on roads and rivers, and to offer improvement measures. METHODS : This study first surveys and analyzes laws and existing study trends with regard to the design and completion documents output delivery system in public construction projects. It further analyzes the status of the output delivery system in public construction projects, including roads, rivers, expressways, water resources, and railroads. In addition, a comparative analysis of the current electronic delivery system of MOLIT and Korea Expressway Corporation in the road field is conducted, and the problems and improvement measures for MOLIT's electronic output delivery system are presented. This study seeks to analyze problems and prepare improvement measures with regard to road and river public construction projects, as ordered by MOLIT's five regional offices. RESULTS : This study sought to prepare the electronic output delivery system with regard to public construction projects and present the analysis of its major problems and improvement measures in four categories: "the preparation of electronic design documents output delivery system improvement measures including inspection and delivery," "preparation of guidelines, systems, etc., concerning electronic design documents," "preparation of improvement measures for the construction project management system and electronic design document support tools", and "linking of MOLIT's electronic output delivery system with relevant agencies and the expansion thereof to local governments." CONCLUSIONS : This study analyzed the current status and problems of the MOLIT's electronic output delivery system in the field of road and river construction projects, and presented corresponding improvement measures. This study is expected to address the problems of the MOLIT's electronic output delivery system, and to provide the foundation for the preparation of an efficient electronic output delivery system for design and completion documents. In addition, this study is expected to boost the quality and utilization of the electronic design documents output, and to exchange, share, and link construction information among relevant agencies so as to prepare the foundation for sharing construction information.

A Study on the Presumption of Construction Cost of Public Apartment by Analyzing Actual Construction Cost (실적공사비 분석을 통한 공공주택 공사비 추정에 관한 연구)

  • Yoon, Woo-Sung;Lee, Hyun-Chul;Lee, Han-Min;Go, Seong-Seok
    • Korean Journal of Construction Engineering and Management
    • /
    • v.10 no.2
    • /
    • pp.132-144
    • /
    • 2009
  • In this study, the basic data for calculating the proper construction cost as minimizing the uncertainty at the stage of forecasting construction cost with the basis of the analysis on the actual construction cost within completed domestic public apartment house. In this regard, 23 public apartment houses by each region which were ordered by the Korea National Housing Corporation and completed from 2004 to 2007 were selected as the objects of study. Four works such as common temporary installation, construction work, civil work and machine/equipment work which are the important direct cost items based on the actually inputted and settled construction costs were classified by completion year, region, architectural area, and the distribution type considering inflation rate. The sequent actual construction costs per 3.3m2 were compared and analyzed by each work, the proper construction costs were analogized and the calculating formula were presumed with the basis of average actual construction costs to be analyzed and presented.

Innovation and Achievements in Public Construction Clients - Lessons Learned from GSA Construction Excellence Program - (공공 발주자 혁신프로그램 전략 및 성과 분석 - 미국 GSA Construction Excellence 프로그램을 중심으로 -)

  • Kim Han-Soo;Jung Hui-Ok
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.394-397
    • /
    • 2003
  • The Korea construction industry is now in a state where radical innovation is seriously considered. Among a variety of innovation topics, this paper focuses on innovation in public construction clients. The objective of this paper is to analyze GSA's Construction Excellence Program as a case study and to present key characteristics of the program from the perspectives of implications and lessons learned.

  • PDF

A Study on Improvement through a Survey on the Condition of Construction Waste Treatment of Public Institutions (공공발주기관의 건설폐기물처리 실태조사를 통한 개선에 관한 연구)

  • Park, Jeong-Gwon;Lee, Myeong-Eun;Kim, Chang-Hak
    • Land and Housing Review
    • /
    • v.13 no.2
    • /
    • pp.141-150
    • /
    • 2022
  • The government introduced a waste disposal share system to reduce the annual increase in construction waste and to increase the recycling rate. As a result, the cost of waste treatment by public institutions is growing inevitably, causing disagreements and disputes between the public owner and the construction waste treatment company. They are also arguing for an increase in construction waste disposal costs. Therefore, in this study, an on-site survey was conducted to identify the current construction waste management problems and to find improvements. The survey was conducted for supervisors of public institutions, construction companies, and those related to waste treatment companies. The survey results were analyzed by dividing the construction waste management, regulations, treatment cost, and treatment method. The results of this study were used as primary data for changes in the construction waste guidelines and waste treatment costs of public institutions.