• 제목/요약/키워드: Public Construction

검색결과 2,512건 처리시간 0.033초

공공발주용역 실적 및 평가 관리 프로세스 개선에 대한 연구 (A Research on Improvement Scheme for Management Technique of Public Ordering Service Results and Estimation)

  • 이규성;이한규;김남곤
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2013년도 춘계 학술논문 발표대회
    • /
    • pp.238-239
    • /
    • 2013
  • A system to efficiently utilize construction information has been in demand as a result of the changing society where information and knowledge leads to added value. Consequently, the government established a comprehensive information network system for construction industries to manage and utilize construction information which is the currently in use. However, this system is oriented toward management and business performance estimation for engineering and does not integrate a management system for design, construction technology, and construction engineering services. Therefore, this study proposes to develop object technology and management system of construction services and its evaluation to provide such information in real time.

  • PDF

유동성 악화에 따른 건설산업 위기극복 방안 모색을 위한 기초연구 (A Basic Study for Finding Methods to solve the Crisis of Construction Industry caused by Deterioration of Liquidity)

  • 김은성;이상효;김재준
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2009년도 춘계 학술논문 발표대회 학계
    • /
    • pp.131-135
    • /
    • 2009
  • Domestic construction industry is facing big difficulties by a worldwide financial crisis. Especially the deterioration of liquidity by the reject of banks for project financing and unsold housing project made a big problem on financing for the ongoing and new projects. To solve this, it is critical for construction companies. banking facilities and public organizations to cooperate and support each other. In this study, the methods which each part can do are investigated. Construction companies can do a price reduction, finance condition improvement for deposit and down payment, asset sale and cost reduction. And Public organizations can buy the assets of construction companies with proper price and ease the regulation to activate transactions of real estate. In the case of Banking facilities, they can support arrangement and liquidation of insolvent projects and so on.

  • PDF

Analyzing Characteristics of Construction Complaints with Construction Project Type

  • Lee, Ju-Hui;Lee, Changjun;Yun, Sungmin
    • 한국건설관리학회논문집
    • /
    • 제24권3호
    • /
    • pp.52-61
    • /
    • 2023
  • Conflicts in a construction project not only make negative impacts on project performance such as schedule delay or cost overrun but also require social cost to resolve the conflicts. Although the conflict needs a preemptive management because a conflict usually begins with a complaint, existing studies have focused on conflict resolution after it occurs. This study identifies and categorizes complaints which mainly appear in the construction projects. Those complaints were evaluated and quantified in terms of occurrence frequency and potential to conflict through a questionnaire survey with industry experts. Using the survey results, this study examines the characteristic of complaints in linear project and clustered project, and analyzes what kind of complaints occur by project type. As the results, this study derives the complaints with high potential to the conflicts that should be managed first during managing a construction project in each project type.

Analysis of the Effect of Construction of Public Cremation Facilities in Jeongeup City on Cremators Number Using E-Haneul Funeral Information System in Jeollabukdo and on Cremation Rate

  • Choi, Jae-sil;Kim, Jeong-lae
    • International journal of advanced smart convergence
    • /
    • 제10권1호
    • /
    • pp.117-124
    • /
    • 2021
  • Based on a result of we research and analysis of this study, it was analyzed that the average annual cremators number using E-Haneul Funeral Information System among the five public cremation facilities in Jeollabukdo was 9,713 in total before the opening of public creation facilities in Jeongeup City (2013-2015), while the number was 12,159 after the opening of public cremation facilities in Jeongeup City (2016-2019); the number was increased by 2,446, compared to the opening period (2013-2015), with a large increase rate of 25.2%. In addition, the average annual cremation rate before the opening of public cremation facilities in Jeongeup City (from 2013 to 2015) was 71.6%, but the average annual cremation rate during the period after the opening (from 2016 to 2019) was 81.5%, which was a large increase rate of 9.9% compared to period before the opening of the facilities. Based on research results above, we have presented policy suggestions in order to increase the efficiency of operation and management of public cremation facilities by local governments as follows. First, in order to prepare for the increase in demand for cremation due to the increase in cremators number, a policy promotion for the expansion of "public cremation facilities" should be carried out as soon as possible, focusing on local governments whose supply has reached the limit. Second, in order to support the expansion and construction of public cremation facilities, the government subsidy rate and government subsidy at the level of current 70%, provided by the central government, should be further expanded. Third, overcoming theNIMBY conflict overlocation for public cremation facilities, theutilization rate should be enhanced, through the joint construction and facility operation of the public cremation facilities between local governments, and the ef iciency of the project implementation should be improved through the jointsharing of the facility operation cost.

공공 도로건설사업에서의 원격 현장모니터링 체계 구축에 관한 연구 (A Study on Development of Remote Site Monitoring System in Public Road Construction Projects)

  • 옥현
    • 한국도로학회논문집
    • /
    • 제14권6호
    • /
    • pp.57-65
    • /
    • 2012
  • PURPOSES : Efficiency Improvement of a public road construction project management work using the development of a real-time remote site monitoring system METHODS : In this study, we developed the remote site monitoring system using a web camera for road construction projects in the RCMA(Regional Construction Management Administration). We can be monitored a construction progress and a weak point of the situation in real time using this. To achieve this, we tested about 10 road construction projects ordered by RCMA. Then, we verified a applicability for the site monitoring system in future. RESULTS : Take advantage of the remote site monitoring system consists of the Construction CALS System, one of the business systems used in the part of the MLTM(Ministry of Land, Transport and Maritime Affairs) institution-agencies. Was configured to be served through the "Construction CALS System" of "Construction Management System(Contractors)" and the "Construction CALS Portal System". Through this, Benefit analysis through a pilot application of the 10 road construction sites and developing considerations and "Guide for visual information processing equipment installation-operating in construction sites"are presented. CONCLUSIONS : Through the establishment of remote site monitoring system can improve the efficiency of construction management services. In addition, Various disasters and calamities, accidents and illegal construction will be prevented in advance is expected. This is expected to further improve the quality of the facilities.

공공건설사업에서의 건설공사 사후평가시스템 구축에 관한 연구 (Development of the Construction Post-evaluation System in Public Construction Projects)

  • 옥현;양성훈
    • 한국산학기술학회논문지
    • /
    • 제15권12호
    • /
    • pp.7364-7371
    • /
    • 2014
  • 건설공사 사후평가는 공공건설사업 수행성과를 평가하고 차후 유사사업 추진 시 이를 활용하여 공공건설사업 효율화에 기여하기 위한 제도이다. 건설공사를 계획하는 과정과 공사완료 후의 공사비, 공사기간, 수요, 효과 등에 대한 예측치와 실제치를 종합적으로 분석, 평가하여 시행의 효율성을 도모하는데 목적이 있다. 이를 통해 방만한 사업추진을 방지하고, 유사 건설공사의 품질 및 효율성 향상을 위한 자료로 활용하고 있다. 하지만, 건설공사 사후평가 자료를 유사 건설사업에 참조 및 활용하기 위해서는 건설공사 사후평가 결과정보에 대한 체계적인 관리가 필요하다. 따라서 본 연구는 발주청별로 실시하고 있는 건설공사 사후평가의 결과정보를 체계적으로 통합 관리하고, 활용할 수 있도록 국토교통부에서 고시한 건설공사 사후평가 시행지침을 기초로 하여 건설공사 사후평가시스템을 구축하였다. 이를 통해 공공 건설사업의 수행 시 유사 건설사업의 수요 증감, B/C 비율 등 결과정보의 참조 활용을 통해 품질 향상 및 효율적인 사업 추진이 가능한 기반을 마련하였으며, 향후 사후평가 결과정보의 체계적인 관리를 통해 종합적인 분석 및 평가 등 유용한 도구로 활용될 수 있으리라 기대된다.

Application of the Public Buildings for the Korean-style houses in the availability of R&D technologies - Focused on Drawings of Agricultural Education and Experience Center in Na-Ju, Korea

  • Kim, Young-Hoon;Peck, Yoo-Jung;Park, Joon-Young;Chun, Kuk-Chun
    • KIEAE Journal
    • /
    • 제16권3호
    • /
    • pp.13-23
    • /
    • 2016
  • Purpose: In this paper, based on the design drawings of Naju Agricultural Technology Learning Center by focusing on features of New-Hanok applied technology in the design and construction process of New-Hanok Type Public buildings by looking at the characteristics of the whole building is planned to be presented in the future development direction and value of public architecture applied to public buildings. Method: we first review the Phase 1 study results of technology development and application technology to look at the type and characteristics of the technologies applied in Naju Hanok Experience Agriculture Learning Center. As construction designs through the consultation suggestions reflect changes were seven times. By analyzing the changes in the basic design and conduct design in the process were organized for the new technologies applied and whether the application of existing technology hanok. Result: (1) Complements the shortcomings of technology and R & D to offer an alternative to the reinforcement was omitted modify the construction method or irrational process. (2) Implementation of a technique aiming to apply new-hanok workability and economic efficiency is based on a combination of the modern construction techniques and materials. (3) The use of modern materials to the extent that can assist in the purpose and function of the building are to be accommodated. (4) There is sufficient historical study and design plan for establishing identity is necessary in order to reflect the history and tradition of new-hanok public buildings.

토지·주택 건설부문 공공기관의 온실가스 배출량 관리방안 고찰 (Management of GHG Emissions from the Public Organizaions in Land and Housing Construction Sector)

  • 이기홍;유정현;임주호;전선정
    • 토지주택연구
    • /
    • 제2권3호
    • /
    • pp.307-313
    • /
    • 2011
  • 본 연구에서는 토지 주택 건설부문의 공공기관들에 적합한 온실가스 관리방안을 제시하였다. 토지 주택 건설부문 공공기관들에서 시행하는 사업들은 공공성과 복합성이라는 특징을 갖게 된다. 이러한 사업특성을 반영하여 온실가스 관리영역 및 감축목표를 설정하고 온실가스 관리시스템을 구축하는 방안이 필요하다. 토지 주택 건설부문 공공기관들의 사업들은 대부분 사회기간시설들을 건설하는 것이므로 온실가스 저감노력을 모두 계량화하기가 어렵다. 따라서 온실가스를 계량부문과 비계량부문으로 구분하여 체계적으로 관리하는 방안이 적합함을 제시하였다. 온실가스 배출량 관리방안의 구체적 모델로서 한국토지주택공사의 사업 분야를 대상으로 종합적인 온실가스 배출량 관리방안을 예시하였다.

토공 현장관리 중심의 시공관리시스템 개발에 관한 연구 (Development of Construction Project Management System Applicable to Earth-Work Field)

  • 권오용;조재익;김도근
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2008년도 정기학술발표대회 논문집
    • /
    • pp.301-304
    • /
    • 2008
  • 본 연구는 토공현장의 토사관리를 중심으로 토공사에 대한 시공관리시스템 구현을 목적으로 한다. 본 연구 결과는 토공사 시공관리에 대한 DB 설계 및 시스템 구현으로 구분한다. 첫째, 토공사 시공관리에 대한 DB설계는 토공사 장비에 대한 작업계획 대비 실적의 분석을 통한 시공관리와 노무관리 등 자원관리 DB를 구성하여 작업과 자원 분류체계를 연계하여 구성하였으며, 둘째 토공사 시공관리 시스템은 토공사 작업계획을 평면도에 구획단위로 구분하여 실적을 그래픽으로 표시하며, 이를 기반으로 공정 현황, 진도보고 등폭 시각적으로 표시하여 현장의 실무자간에 의사소통 및 업무 수행에 원활히 사용하도록 개발하였다. 본 연구는 토공전문회사의 토공사 업무에 특화한 시스템으로 시험적용 단계를 거쳐서 현장에 사용 가능한 시스템이다.

  • PDF

CONSTRUCTION OF SEX CHROMOSOMAL STR LOCI TYPING SYSTEM

  • Woo, Kwang-Man;Kim, Jong-Yeol;Park, Su-Jeong;Oh, Hye-Hyun;Lee, Seung-Hwan
    • 한국동물학회:학술대회논문집
    • /
    • 한국동물학회 1998년도 한국생물과학협회 학술발표대회
    • /
    • pp.356.2-356
    • /
    • 1998
  • No Abstract, See Full Text

  • PDF