• 제목/요약/키워드: Public Building Projects

검색결과 257건 처리시간 0.028초

공공건축물의 합리적인 운영평가기준 설정 방향에 관한 연구 (The Study on Evaluation Basis of Management Strategy in Public Buildings)

  • 이상범;노병옥
    • 한국건축시공학회지
    • /
    • 제9권2호
    • /
    • pp.69-76
    • /
    • 2009
  • Recently, the twenty-first century is called "the age of localization and regionalization" in Korea. So, local government should need to keep balance between the existing administrative management and new management strategies based on CEO's mind in order to deal with the situation of such that(the age of localization and regionalization) and improve efficiency of public service. In addition, they build public buildings after that they should operate and maintain them regularly. However, Korea local governments have tried to run many projects to expand insufficient local finance that was only for profit oriented public projects without considering management. Therefore, this paper is a basic study to establish and suggest the reasonable operation plan for local government by examining and reviewing actual operation condition in the public buildings. With the evaluation method which is demanded from public construction management to introduce a civil management technique manages an investment mind standard and management basis of assessment, proposes 8 sides of financial affairs, real estate maintenance and facility management, achievement evaluation, environmental safe crisis management, judiciary and explanation responsibility with base.

공동주택 거푸집 공사의 생산성 분석을 위한 시뮬레이션 모델 개발 (Development of a Simulation Model for the Productivity Analysis of Form Work in Multi-Family Housing Construction projects)

  • 강동완;문현석;현창택
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2009년도 추계 학술논문 발표대회
    • /
    • pp.193-198
    • /
    • 2009
  • It is an important issue in cost management to contract with the standard of cost estimate by the reasonable way in public construction projects. For the standard of cost estimate based on the Standard Estimating System, there is a difference of labor inputs between Standard Estimating System and actual quantities in construction projects. The duration of form work in multi-family housing depends on the manpower compared with other work, which is the critical path on the schedule management to be decided quality, and is the important to the cost management of construction projects. This study presented a simulation model of the productivity analysis for selecting the standard work type of form work in Multi-family housing construction projects.

  • PDF

공공사업 예정공사비에 대한 실증적 접근 (An Empirical Approach Study on Construction Cost Estimation in Public Work Projects)

  • 유창규;송정규;이윤선;김재준
    • 한국건축시공학회지
    • /
    • 제9권1호
    • /
    • pp.65-73
    • /
    • 2009
  • Looking at current construction costs estimations of publicly declared public works, there are many instances where estimation criteria are ambiguous and doesn't imply the reality. Up to date, estimation criteria for calculating construction cost estimations are simply by unit area multiplication and stochastic construction cost estimation. However, possibility of making errors are high due to using uniform data that excludes each public work's specifications and environmental conditions. Further, on the aspect of cost management, there is certain limitation in the efficiency of cost management in order-placing stage and commencing-work stage; while efficient cost management and reduction of expenses are highly possible during initial stages of the project. In this respect, the paper adopts positive approach with regards to construction cost estimations of public works and draws common elements from calculation tables of the construction cost estimations from 3 completed domestic construction works; after which, the paper analyzes whether business exposition, construction guide and publicly-declared estimated construction costs that the orderer issued are calculated economically and properly; deducing problems in the process, the paper seeks to recommend rational calculation method on this.

산업유산 재생 설계공모에서 시민참여방안 연구 - 서울시 마포석유비축기지와 서울역 고가 사례를 중심으로 - (A Study on Public Participation to the Design Competition for Reuse of Industrial Heritage - Case Studies on Mapo Oil Depot and Seoul Station 7017 Projects -)

  • 신은기
    • 한국BIM학회 논문집
    • /
    • 제6권4호
    • /
    • pp.1-8
    • /
    • 2016
  • This study is to examine the public participation activities in the progress of the design competition, purposed to provide urban public spaces by the reuse of industrial heritages. Through the case studies of Berlin Tempelhof Parkland, Mapo Depot and Seoul Station 7017, following activities are common: citizen idea competition, forum, field trip, survey and winners exhibition. However, those activities are more closely organized to the competition process in Tempelhof Parkland, than other tow projects of Seoul Metropolitan Government. Also, it enables to clear and develop the public ideas more that those programs such as survey, citizen idea competition and field trip, are linked to each other in the case of Tempelhof Parkland. It could be achieved by the unified organization between competition preparation and public participation operation.

공공프로젝트 친환경 설계지침의 변화에 따른 건축설계프로세스 연구 (Architectural Design Process by the Changes of Sustainable Design Guidelines of Public Project)

  • 태영란
    • 한국태양에너지학회 논문집
    • /
    • 제30권4호
    • /
    • pp.63-70
    • /
    • 2010
  • This study introduce a architectural design process by the changes of sustainable design guidelines in public project. First of all, this study examines existing integrated design process studies performed by Rhee & U.B.C. Also, this study examines sustainable guidelines which demanded by public building projects. Then, this study introduces sustainable design process using existing sustainable design process, and shows that how to operate and proceed integrated design to satisfy the sustainable guidelines in practice. The results of this study are as follows. (1) Since 2007, sustainable design guidelines of bidding projects have been highlighted. (2) In public buildings, energy saving is very important issue. Especially energy certification demands 1st degree(under $300kWh/m^2{\cdot}yr$). (3) Inp ractice, integrated design team performed sustainable design using the sustainable design process to improve sustainable in public buildings.

Optimal Implementation Strategies of Building Information Modeling for Construction Projects of LH

  • Lee, Ji-Eun
    • 국제학술발표논문집
    • /
    • The 6th International Conference on Construction Engineering and Project Management
    • /
    • pp.60-62
    • /
    • 2015
  • The BIM-based architectural design can be the optimal method to improve all sectors of construction industry and reduce environmental impact through digital technologies. The goals and effects of BIM needs in LH to be newly planned based on the experience of public sectors, which will ultimately contribute to maximization of effectiveness. Referring the excellent case in the UK, the current BIM standards according to maturity level 2 handle the contents related to modeling, collaborative data production, data management and assure BIM data have to be used from building construction to operation and maintenance of buildings. Therefore the strategy for the utilization of BIM for construction projects in LH consisted of three steps; first, the minimization of defects via BIM: second, strengthening the competitiveness of construction and asset management: third, upgrading the system of building production and maintenance control. After this trial, LH can accumulate know-how for building construction to be more costeffective and competitive.

  • PDF

A CBR-BASED COST PREDICTION MODEL FOR THE DESIGN PHASE OF PUBLIC MULTI-FAMILY HOUSING CONSTRUCTION PROJECTS

  • TaeHoon Hong;ChangTaek Hyun;HyunSeok Moon
    • 국제학술발표논문집
    • /
    • The 3th International Conference on Construction Engineering and Project Management
    • /
    • pp.203-211
    • /
    • 2009
  • Korean public owners who order public multi-family housing construction projects have yet to gain access to a model for predicting construction cost. For this reason, their construction cost prediction is mainly dependent upon historic data and experience. In this paper, a cost-prediction model based on Case-Based Reasoning (CBR) in the design phase of public multi-family housing construction projects was developed. The developed model can determine the total construction cost by estimating the different Building, Civil, Mechanical, Electronic and Telecommunication, and Landscaping work costs. Model validation showed an accuracy of 97.56%, confirming the model's excellent viability. The developed model can thus be used to predict the construction cost to be shouldered by public owners before the design is completed. Moreover, any change orders during the design phase can be immediately applied to the model, and various construction costs by design alternative can be verified using this model. Therefore, it is expected that public owners can exercise effective design management by using the developed cost prediction model. The use of such an effective cost prediction model can enable the owners to accurately determine in advance the construction cost and prevent increase or decrease in cost arising from the design changes in the design phase, such as change order. The model can also prevent the untoward increase in the duration of the design phase as it can effectively control unnecessary change orders.

  • PDF

공공공사 발주방식 선정에 영향을 미치는 요인 연구 (A Study of Factors Influencing Delivery Methods Selection on Public Construction Projects)

  • 김대길;이웅균;이학주
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2014년도 추계 학술논문 발표대회
    • /
    • pp.218-219
    • /
    • 2014
  • The selection of an appropriate contract method is vital for the successful operation of the project. However, there has been a lack of studies on objective decision making support models for use in the planning stage of a project contract. The present study had the goal of analyzing the factors that influence contract method selection, as an initial study for developing a project contract method selection model. The existing related studies were analyzed, and the factors considered in the literature were selected. Then, based on the findings, the opinions of an expert group on the important factors for contract method selection were collected through a survey. The collected opinions were analyzed using factor analysis, a statistical analysis method. The results will be utilized in the future as preliminary data for developing a decision making model for selecting a contract method.

  • PDF

유동성 악화에 따른 건설산업 위기극복 방안 모색을 위한 기초연구 (A Basic Study for Finding Methods to solve the Crisis of Construction Industry caused by Deterioration of Liquidity)

  • 김은성;이상효;김재준
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2009년도 춘계 학술논문 발표대회 학계
    • /
    • pp.131-135
    • /
    • 2009
  • Domestic construction industry is facing big difficulties by a worldwide financial crisis. Especially the deterioration of liquidity by the reject of banks for project financing and unsold housing project made a big problem on financing for the ongoing and new projects. To solve this, it is critical for construction companies. banking facilities and public organizations to cooperate and support each other. In this study, the methods which each part can do are investigated. Construction companies can do a price reduction, finance condition improvement for deposit and down payment, asset sale and cost reduction. And Public organizations can buy the assets of construction companies with proper price and ease the regulation to activate transactions of real estate. In the case of Banking facilities, they can support arrangement and liquidation of insolvent projects and so on.

  • PDF

Use of Output Specifications in PFI Housing Projects - How They Differ from Prescriptive Specifications

  • Lam, Patrick T.I.;Chan, Albert P.C.;Akintoye, Akintola;Javed, Arshad Ali
    • Journal of Construction Engineering and Project Management
    • /
    • 제1권2호
    • /
    • pp.43-48
    • /
    • 2011
  • In many parts of the world, low cost housing used to be built and maintained by the governments, based on designs and detail specifications prepared by the public sector with construction carried out by contractors. Results vary due to differences in design standards, workmanship and property management, depending also on the neighbourhood's care of the estates and their pattern of usage. In the UK, where Private Finance Initiative (PFI) has been used for infrastructure projects, there have been successful cases of city estate being transformed by PFI. These PFI housing schemes involve new-build, refurbishment as well as facility management. Unlike traditional construction, which is based on prescriptive specifications, PFI housing is based on output specifications. A study has been undertaken to compare the two specification approaches as they are applied to housing estate. Results are enlightening and serve as good reference to cities such as Hong Kong SAR and Singapore, where public housing provisions have been a major concern of their citizens as the building stock gets older.