Cheongnamdae is public building which was built in 1983. Cheongnamda had been used for the exclusive villa for Presidents of Korea from then until 2003 when it opened to the public. Because of public building, public records would have been produced during the construction process. The records of public institutions are generally managed and destroyed according to retention schedule. Considering the retention schedule of those days, it is more likely that most of records which would show the accountability about building Cheongnamdae do not remain. But regardless of retention period, those records may be left, so we need to confirm existence of the records. The purpose of this study is to examine whether the records related to the construction remain or not. For the examination, I make a list of the records which are supposed to be created during the construction process. Then I identify whether those records are preserved in records-creating institutions or national archives or not. And I suggest the selection strategy of the records of existing public buildings and show the direction for managing the records of public buildings to be built.
Purpose: The construction of New Han-ok style public buildings is a construction that can not be seen in traditional Han-ok, and it is a construction that combines traditional wooden structure, RC structure, and steel structure. Therefore, construction different from general construction is complicated and complex. It is necessary to accurately understand the construction method of each field rather than the general construction management method and study the method suitable for New Han-ok style public buildings. Also, since the New Han-ok style public building business is the first business to be introduced in Korea, new process management is needed rather than general process management. Method: The research method is as follows. Analyze process management through theoretical considerations and analyze the differences from general construction projects. Next, we want to identify the characteristics and problems of the process control method applied to real cases. Finally, the results of this analysis suggest ways to improve process management. Result: Therefore, it is necessary to establish a precise plan from the basic design to the construction of the public building construction management. In addition, careful planning should be made so that the supply and demand of materials and the supply and demand of personnel can be achieved smoothly.
Korean Journal of Construction Engineering and Management
/
v.10
no.3
/
pp.130-138
/
2009
Bromilow's time-cost (BTC) relationship was examined for building projects in Vietnam using actual construction time and total construction cost. Data set was collected from 77 historical building construction projects completed between 1999 and 2005 which were adjusted by consumer price index (CPI) to 2000 price. Time-cost equations were specified respected to two sectors, public and private, in Vietnamese construction industry and all cases. It is shown that a public funded building project has the longer construction duration than a similar budget private funded project. The resulting models are statistically significant. The adjusted R-square coefficients of all cases, public and private projects models are respectively 0.403, 0.436 and 0.377 mean that the BTC regression lines moderately fit the data set.
Proceedings of the Korean Institute of Building Construction Conference
/
2009.05b
/
pp.203-207
/
2009
These days Construction Industry is one of the major industry in public project and it has many problems. And Construction Industry highly respond to a chage of IT, politics, economy, domestic and international situation. And it causes an uncertainty in Korea economy. The goal of this paper is showing the efficiency application of BIM in Public Project. And this paper follow three steps. First, these day's trend of BIM and delivery method are researched. Second, major factors are thrived to appreciating BIM Third, delivery method based on BIM is proposed. Major factors of delivery method are researched to make guide line of delivery method in public project in the future.
Journal of the Korea Institute of Building Construction
/
v.15
no.3
/
pp.307-316
/
2015
As there are a lot of differences in the public building construction cost depending on the construction scale of actual construction cost system, a lot of problems occur in the estimation of the cost. So, the development of a predictive model depending on the construction scale shall be used in a way that it is applied to the case selectively and differently. This study drew a cost estimating model through a regression analysis. For this, 42 construction sites which were ordered during 2011 to 2012 by Public Procurement Service data were selected as a historical data. Based on the application of the model to new construction and the verification of its effect, the reasonable model for estimating the construction cost has been suggested.
In the case of public buildings, fast communication and transparency in the administration and the public, as well as ensuring visibility and lighting performance using a glass curtain wall is symbolically expressed through the transparent glass skin. This study is a simulation in order to derive the basic data for the establishment of the improvement of the heating and cooling load analysis according to the window area ratio changes with respect to the high effectiveness of the government's large public building energy consumption analysis and green building certification system of guidelines was analyzed by a change in the energy load. Glass curtain wall is light and visibility, the symbolic meaning of communication, etc., but is widely used in a variety of characteristics, in terms of energy consumption being disadvantaged sheath plan should have been. Design, including the Atrium, is much less energy than energy consumption by the window area ratio. Thus, while compliance with design guide lines, the atrium and I like the burden of a large space ratio and energy load consists of only glass suggest that require more research on that given in the guidelines.
This study is intended to know what is the legal problems to settlement and public announcement of property right for construction of marine architectural building in Korea. Firstly, the situation and the prospect around marine architectural building are examined Secondly, the legal concepts of marine architectural building and the application of related laws are analyzed. Thirdly, the problems related to public announcement of property right of marine architectural building are suggested. Fourthly, some improvement schemes to solve the legal problems in relation with property right of buildings on the water at sea and ocean are proposed. As the conclusion, the marine architectural building can be divided into fixed-type and floating-type in order to find the proper way to handle the public announcement of property right for that sort of building. The fixed-typecan be registered as real estate according to the Building Law through the amendment of the existing related laws. But for the registration of floating-type building a new law should be made. In the near future, improvements on the legal system related with the settlement of property right of marine architectural building should be made, so that private sectors can join construction and operation of the building. Especially a new law for the floating-type marine architectural building should be made as soon as possible.
Proceeding of Spring/Autumn Annual Conference of KHA
/
2009.04a
/
pp.284-287
/
2009
In order to plan and manage public facilities effectively and efficiently, it is necessary to diagnose the current status of facilities and decide the objective features. Performance measurement is to provide managers with the information they need to measure competitive advantages. This paper discusses public facility performance in order to establish the conceptual framework for performance measurement for public facilities. In order to develop the measurement of public facility performance, a pilot study was conducted with facilities managers of facilities management corporation of public districts in Seoul. We investigated how public facilities management teams have assessed their performance and collected data regarding financial aspects, service aspects, community aspects, and building aspects. There is no standard format to measure facility performance since building sizes, programs, community needs widely differ. However, it is necessary to have a more consistent system to measure facility performance. In addition, each public municipal district needs to empower each district facilities management corporation to participate in managerial decisions and budget control.
Since public rental housings (social housings) in Korea are extremely standardized and uniformed, a variety of needs of residents for their housing are hardly satisfied. Public rental housing conditions, its low quality and size limitations regardless of residents type and needs resulted into negative images of social housing and social discriminations. Therefore there is a growing demand for alternative housing options in terms of diversification of social housing design with consideration for changing households and housing requirements. The purpose of this study to investigate some housing design guidelines, to analyze layout of building complex, community designs, household units and characteristics, overall design characteristics (sustainable design features, facade design, window and balcony composition, color and materials) and to provide some design suggestions for social housing. Design guidelines are classified into site planning and building layouts, residential building and household units, and performance of housing. Community facilities and their design features provide uniqueness of the public residence. Overall housing size of foreign cases is bigger than the domestic cases. Narrow shape of household units are more dominant in Korean public rental housing. More various shape and forms are found in facade and window design in foreign cases. Some design suggestion are provided for more diverse housing units and design for public rental housing in Korea.
In the field of architecture, the sustainable architectural concept, "green buildings," has been suggested as an alternative to solve the environmental problems; however, the concept has not yet been converted to awareness and development of related technology. The leading role of public sector has been socially and economically influential in the nation, hence green public buildings are significant to stimulate the spread of green buildings in the nation. This study is to draw an appropriate method of implementing the green building concept to the two main government office buildings of Jeju Special Self-Governing Province based on the plan to improve the work environment; it is also to provide long-term directions of implementing policies and reference for the public and private sector to utilize the green building concept. Its research methodology was the survey method. A total of 142 questionnaires were returned by government employees of the two buildings. It accounts for 20% of the total number of 711 workers of the buildings. According to the analysis of the returned questionnaire, the majority of the surveyed have a positive evaluurned toward the introduction of green buildings due to their expecturned for the possible i the buildingstheir work environment. In addition, they showed more interest in space planning with natural ventilation than automatic systems regarding applied methods for green buildings.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.