Most of electric distribution utilities have their reliability performance measured by reliability indices such as SAIFI and SAIDI to evaluate customer satisfaction. Adding protective devices in electrical distribution system can increase the system reliability by protecting public customers from local faults. In large-scale distribution system, it is difficult to determine the positions of these protective devices, which can efficiently protect customers within utilities' investment. In this paper, we propose an optimization technique to identify types and positions of protective devices to minimize SAIFI and SAIDI indices according to system requirement constraints.
The Transactions of the Korean Institute of Electrical Engineers P
/
v.61
no.4
/
pp.214-219
/
2012
In this paper, the method of protective coordination is studied to install Superconducting Fault Current Limiter (SFCL) to power distribution system. If SFCL is installed, the protective coordination is not operated well because of the decreased fault current. Thus, the resetting method of protective devices is presented to coordinate protection system in power distribution system with resistor-type SFCL. The presented methods are divided into three parts; OCR, OCR-Recloser, OCR-Recloser-Recloser. The presented methods are proved through case studies using PSCAD/EMTDC simulation.
Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
/
v.16
no.2
/
pp.90-97
/
2002
In this paper we study the performance test items and improvement plans of surge protective devices for low-voltage power circuits used in railway system. Above of all, the sources of electromagnetic interference in railway system are researched. And then we compared domestic railway standard with IEC and IEEE standards far the test items and methodologies of surge protective devices. Through the investigations, we found that the domestic standard is behind in the number of test items and methods on surge protective devices. As the countermeasures, we suggest removing component tests of surge protective devices, separating standards for power and signal standards, and using international surge waveform. In applying to domestic railway surge protective devices, surge limiting voltage measuring and surge endurance tests by international standard methods are good result.
The Transactions of the Korean Institute of Electrical Engineers A
/
v.54
no.9
/
pp.427-433
/
2005
In DC tracking power supply system, ground faults are currently detected by the potential relay, 64P. Though 64P relay detects ground fault, it cannot Identify the faulted region which causes long traffic delays and safety problem to passengers. Two new ground fault protective relay schemes that can identify the faulted region are presented in this paper. One is bus differential protective relay and the other is ground overcurrent protective relay. Both type of relays is similar in principle to the ordinary bus differential protective relay and the ground overcurrent relay used in other power system. In DC traction power supply system, since it is ungrounded, ground fault current is not big enough to operate those relays. To solve the problem, a current control device, called device 'X', is newly introduced in both system, which enables large amount of ground fault current flow upon the positive line to ground fault. Algorithms for these relays are developed and their validity are verified by EMTP simulation.
Journal of the Korea Academia-Industrial cooperation Society
/
v.9
no.3
/
pp.658-663
/
2008
In this study, we estimated the influence of electrical pole by FEM(Finite Element Method) and developed protective system by designing and interpreting protective system for electrical pole and overhead optical communication line when abnormal strength worked on messenger wire. Protective system did not shed messenger wire under wind pressure and discontent load but did assign a part to preventing rupture of electrical pole and disconnection of optical communication line through automatically shed messenger wire over fixed strength. Structure of protective system analysis by FEM and prove property by measuring tensile strength for practical product.
Journal of the Korea Institute of Construction Safety
/
v.2
no.1
/
pp.16-20
/
2019
About 50% of disasters occurring at domestic construction sites are caused by the accidents not wearing personal protective equipment. Under the current statutes, employers are required to provide personal protective equipment and workers are required to wear personal protective equipment. However, there is insufficient compliance with wearing personal protective equipment on site. This study is about the measure of improving the system to the way of purchasing, wearing and managing personal protective equipment by individual workers, and refunding the cost of personal protective equipment to workers. It is expected that this thesis will improve the system of personal protective equipment effectively, and contribute to the prevention of disasters by settling the culture of wearing personal protective equipment.
Journal of the Korean Society of Clothing and Textiles
/
v.37
no.8
/
pp.1117-1129
/
2013
The sizing system for Korean Standard of Disposable Protective Coveralls (DPC) uses the ISO sizing system without modification even though the user suitability for Koreans is unverified. This study provides useful information to improve the size standard of Korean DPC by analyzing measurement DPC data from Korean men and women. The distribution of Korean measurements shows that the size sections were unsuitable for Korean men and women for a protective clothing size standard. Body types were categorized into five types based on a cluster analysis of representative men's and women's measurement factors. Two clusters mostly consisted of men, two other clusters mostly consisted of women, and the other cluster relatively evenly consisted of men and women. Therefore, characteristic body measurements and measurement distribution differences were identifiable for men and women. In conclusion, an unmodified ISO protective clothing size standard is unsuitable for Korean men and women and may cause fit problems. This study shows that a Korean Standard of protective clothing is beneficial for protective clothing manufacturers and wearers if smaller size intervals are added for women and the difference in the distribution of men and women is reflected in the current sizing system. ISO is appropriate to use a Korean Standard in this global era, however, it should be reviewed to provide improved Korean data.
The Transactions of the Korean Institute of Electrical Engineers A
/
v.48
no.6
/
pp.712-718
/
1999
When a fault occurs in power transmission systems, protective relays play a roles of protecting the power system according to there setting values. Therefor, it is important that protective relays have high selectivity and sensitivity by correct setting the involves a large volume of data and is a complicated and very tedious, therefore vulnerable to the human errors. Also, it is very difficult to verify that the relays have correct operating parameters before the fault occurs. This paper porposed a method to testify the reliability of realys by showing the operation response to faults in the simulation of the real power system operation environment.
In this study, we analyzed the influence of electrical pole by FEM(Finite Element Method) and developed protective system by designing and interpreting protective system for electrical pole when abnormal strength worked on messenger wire. Protective system did not shed messenger wire under wind pressure and discontent load but did assign a part to preventing rupture of electrical pole through automatically shed messenger wire over fixed strength. Structure of protective system analysis by FEM and prove property by measuring tensile strength for practical product.
The Transactions of the Korean Institute of Electrical Engineers A
/
v.52
no.1
/
pp.50-57
/
2003
In this paper, the protective relay setting rules of Korean electric power system are studied by analysis of errors to be considered. An accurate operation of protective relays with accurate settings are important in power system reliability. The setting rules are used from the first establishment in 1982 and revision in 1990 Therefore, it needs revise and analysis of the setting rules because of environmental changes such as voltage raise or applied new technology of power system. Two major setting rules are studied. One is the rule for Zones of distance relay for transmission lines. The other is the one of differential current in a differential relay for power transformers. The range of errors in the setting rules accepted in the field experience is studied in simulation of case study. Also some guide lines for the range of errors in the setting rules are presented from the case study using Matlab simulation.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.