• Title/Summary/Keyword: Proposal

Search Result 4,125, Processing Time 0.037 seconds

Effective Proposal Communication Framework Based on Credibility (신뢰성에 기반한 효과적 제안 Communication Framework)

  • Jung, Sung-Hwa;Kim, Up
    • 한국IT서비스학회:학술대회논문집
    • /
    • 2008.11a
    • /
    • pp.47-52
    • /
    • 2008
  • The purpose of this research is to develop a communication framework based on credibility for information technology (IT) proposal. It is necessary to develop a communication framework for IT proposal since it has become more important how effective IT service providers can deliver an IT proposal to customers. In this paper, we develop a communication framework for IT proposal through dividing customer's recognition steps and analyzing key factors based on the credibility. Key factors affecting communication framework have been identified and analyzed by focus group interview and questionnaires with experienced staffs. The results of this study can be used for enhancement of IT proposal's quality through the introduction of communication framework.

  • PDF

BIM-Based VE Proposal Management Using Parametric Modeling (파라메트릭 모델링을 활용한 BIM기반 VE제안 관리 방안)

  • Kim, Dain;Choi, Jaehyun;Lee, Jin Gang
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2023.05a
    • /
    • pp.163-164
    • /
    • 2023
  • The technical proposal bidding system emphasizes the evaluation of the construction company's technical capabilities, with the aim of improving the quality and cost-effectiveness of the construction. However, in the VE analysis and proposal process for technical proposal bidding, the ideas are often reused from similar past construction projects, and the application of new construction technologies/methods is often lacking. Therefore, this study proposes a methodology for managing VE proposal information by integrating it into a BIM model using parametric modeling. This research developed database based on the existing VE proposals and new construction technology/method information from the Korea Institute of Civil Engineering and Building Technology. And by using parametric modeling, the proposed method integrate the VE database with BIM model. The methodology proposed in this study is expected to improve the reliability and effectiveness of VE-related idea proposals in technical proposal bidding.

  • PDF

A Method of Conclusion of Traffic Control Signal Proposal using Fuzzy Analytic Hierachy Process (퍼지AHP를 이용한 교통신호제어기의 교통대안확정방법)

  • Jin, Hyun-Soo
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.9 no.6
    • /
    • pp.1592-1598
    • /
    • 2008
  • Fixed cycle traffic signal controller is pattern type controller. This method is that one concluding traffic proposal affect fixed cycle controller to deciding cycle time during 24 hours. Traffic intersection jam is caused traffic controller supervisor input wrong traffic proposal. The available to traffic controller is traffic proposal is not selected by an outward look but propriety traffic proposal is compared with each other. This paper presents that property traffic proposal adopted to fixed cycle controller by fuzzy analytic hierachy process and new proposal adopted fixed cycle controller is compared with others.

A study on evaluation element of technical proposal tendering for apartment remodeling business

  • Park, Min-Young;Lim, Sooyoung
    • KIEAE Journal
    • /
    • v.15 no.1
    • /
    • pp.61-68
    • /
    • 2015
  • Method of remodeling builder selection for remodeling is competitive bidding. also metropolitan city, megalopolis city, city more than 50million have to do basic plan for remodeling before establishment of a housing cooperative. Purpose of basic plan is improvement of living conditions & the Quality of Life for resident. Technical Proposal Tendering in spite of being the a reasonable bidding system, institutional part, appraisal standard and the item part, consider procedure pard is performed in a similar way to the existing bidding system. so, technical proposal tendering is appropriate for future Method of builder selection of remodeling. therefore, the study purpose is a evaluation element of technical proposal tendering for apartment remodeling business The methods of study is understanding concept through review of precedent literature. Next, case investigation through Analysis of focal points. Lastly, evaluation element deduction of technical proposal tendering for apartment remodeling business through specialist conversation. As a result, Alteration of a right & move management is added to evaluation element's professional field. And detail item is alteration of a right & move management.

Design Proposal of Ttukseom-Sup in Seoul (뚝섬 숲 조성 계획)

  • 김도경;최원만
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.32 no.1
    • /
    • pp.80-91
    • /
    • 2004
  • This landscape design proposal was presented to a design competition for the master plan of Ttukseom Sup, which was held by the City of Seoul in March, 2003. The site is located at 1-685, Sungsu-dong, Sung-dong-gu and has an area of 1,156,498$m^2$. The judging criteria for landscape design set by the City of Seoul could be articulated as follows: first, the proposal should be nature-oriented with groves that can be accessed easily by citizens; second, the proposal should not be facilities-oriented but plants-oriented groves that utilize existing plants; third, the proposal should present its own identity reflecting its historical aspects and geographical location. This proposal has been approached first by redefining the meanings of the old Korean village groves and second, by proposing new cultural infrastructures with the groves corresponding to recent cultural trends.

Development of a Lesson Proposal about the Aging for Middle School Students (중학생을 대상으로 하는 노인교육 수업안의 개발)

  • 김향은
    • Journal of Korean Home Economics Education Association
    • /
    • v.15 no.1
    • /
    • pp.33-42
    • /
    • 2003
  • The Purpose of this study was to develop a lesson proposal about the aging for 7th glade middle school students in the class of home economics. According to this Purpose a lesson Proposal about the aging which contains 1) the nature of generation gap and generational conflicts and problem solving strategies. 2) knowledges about physical. emotional. and social changes of older adults and the process of aging. 3) informations of various order adult-related Professions was devised This proposal will be helpful for younger people to understand older adult much more and to Prepare the adolescents' future life as an older people. It is expected to have effects on decrease the generation gap and conflicts between older and younger people based upon mutual understanding. And it is anticipated that this Proposal will be valuable for many adolescents to have provision about future senior citizen's society and various older adults-related professions .

  • PDF

Development and Evaluation of Injury Prevention Education Proposal for Elementary School Children (학령기 아동의 사고예방 교육안 개발 및 평가)

  • Lee Jung-Eun;Kim Ji-Hyun;Kim Shin-Jeong
    • Child Health Nursing Research
    • /
    • v.8 no.4
    • /
    • pp.365-380
    • /
    • 2002
  • This study was to develop and evaluate injury prevention education proposal which will helpful and can be utilized directly on the first line spot for elementary school children. Education proposal development and evaluation process was 1) Construction of 10-times education proposal contents proper to schooler 2) Testify validity through 3 pediatric nursing professor and 4 elementary school nurse 3) Pretest was done from March, 2002 to July on 3-6th grade 313 elementary school students 4) Through correction and revision after pretest evaluation meeting, final injury prevention education proposal was developed 5) After 10-times injury education, evaluation was carried out about the degree of help in education contents and general constitution of injury education to total subjects of educated children. Injury prevention education proposal consists of 10 times and each subjects are followings. 1st is 「introduction of injury prevention education and the importance of injury prevention」 2nd is「safety in and around home」, 3rd is 「injury prevention in school」, 4th is 「prevention of violence」, 5th is 「motor vehicle safety」, 6th is 「water safety」, 7th is 「prevention of fire and burns」, 8th is 「toy and product safety」, 9th is 「sports and recretional activities safety」and the final 10th is 「injury prevention caused by animals」. In the evaluation, the degree of help in education contents showed it helped to children averaged 1.66 and general constitution showed averaged 2.17 that children satisfied about developed injury prevention proposal. This study expected to provide systematic and concrete guidance in injury prevention education for elementary school children.

  • PDF

Improved Route Search Method Through the Operation Process of the Genetic Algorithm (유전 알고리즘의 연산처리를 통한 개선된 경로 탐색 기법)

  • Ji, Hong-il;Seo, Chang-jin
    • The Transactions of the Korean Institute of Electrical Engineers P
    • /
    • v.64 no.4
    • /
    • pp.315-320
    • /
    • 2015
  • Proposal algorithm in this paper introduced cells, units of router group, for distributed processing of previous genetic algorithm. This paper presented ways to reduce search delay time of overall network through cell-based genetic algorithm. As a result of performance analysis comparing with existing genetic algorithm through experiments, the proposal algorithm was verified superior in terms of costs and delay time. Furthermore, time for routing an alternative path was reduced in proposal algorithm, in case that a network was damaged in existing optimal path algorithm, Dijkstra algorithm, and the proposal algorithm was designed to route an alternative path faster than Dijkstra algorithm, as it has a 2nd shortest path in cells of the damaged network. The study showed that the proposal algorithm can support routing of alternative path, if Dijkstra algorithm is damaged in a network.

A Basic Study for Establishing of Numerical Range Criteria for Classification of Value Improvement Types (VE 가치향상 유형별 수치적 범위기준 설정을 위한 기초연구)

  • Nam, Keong Woo;Jang, Myunghoun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2018.05a
    • /
    • pp.74-75
    • /
    • 2018
  • VE, rather than just cost reduction tool, have established as a value enhancement tool of the construction industry. Value improvement types of VE proposal can show the effect of VE activities, also acts as an important element in which the owner adopts a proposal and confirms the results of the VE activities. However, problems in the process of quantification for VE proposal and ambiguous standards in classification of value improvement types is need to be supplemented. Accordingly, This study suggests the plan for establishing of numerical range criteria for classification of value improvement types of VE proposal. Implementing this plan will be able to improve the reliability and availability for VE activities.

  • PDF

A Quantitative Evaluation on Developmental Organization of Technical Proposals (기술제안서의 개발조직 부문에 관한 정량적 평가)

  • Choo, Kyung-Kyun;Kwon, Young-Kap;Rhew, Sung-Yul
    • Journal of Information Technology Services
    • /
    • v.3 no.1
    • /
    • pp.21-41
    • /
    • 2004
  • The technical proposal suggested and published by MIC(Ministry of Information and Communication, henceforth MIC) contains too general assessment elements, which causes qualitative and subjective assessment of technical proposals. Thus, in terms of the technical proposal assessment. It lacks In fairness, validity and accuracy. Furthermore, it has a great deal of difficulty in assessment caused by the inconsistency between proposal planning and assessment methods. Also, each company has different writing format, so it is impossible to make use of its maneuvering data for the assessment. To overcome these weaknesses, our research focused on a quantitative evaluation on development organization, which is a part of organizational and administrative part of the technical proposal suggested and published by MIC. In this research, we divided development organization for the technical proposal into organization, teams, and team members, and then studied addition, deletion and merging for the assessment criteria. For the related study, we chose especially CMM(Capability Maturity Model) from a lot of international and national references, which is a model measuring the maturity of organization, and then we focused on Small-CMM which is available in the small-sized organization. We also suggested input form, description method, assessment elements for the quantitative assessment in the chosen developmental organization, and finally we proposed standard referencing criteria for the assessment. Our study concludes that our assessment method are valid and available in comparison with the previous Delphi method through a validity evaluation test.