Cost Normalization Procedure for Phase-Based Performance Measurement

  • Choi, Jiyong;Yun, Sungmin;Oliveira, Daniel;Mulva, Stephen;Kang, Youngcheol
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.72-76
    • /
    • 2015
  • Capital project benchmarking requires an effective cost normalization process to compare cost performance of projects accomplished in different time and location. Existing cost normalization approaches have been established based on the assumption that all required information for cost normalization is fully identified once a project is completed. Cost normalization, however, is sometimes required to evaluate phase-level outcomes of an ongoing project where the required information is not fully available. This paper aims to provide a cost normalization procedure for phase-based performance assessment. The procedure consists of three normalization steps: currency conversion, location adjustment, and time adjustment considering various scenarios where the required information is not fully identified. This paper also presents how the cost normalization procedure has been applied to the 10-10 Performance Assessment Program, which is a phase-based performance assessment system developed by the Construction Industry Institute (CII). Both researchers and industrial professionals can apply the cost normalization procedure to studies and practices regarding to cost estimation, feasibility analysis, and performance assessment.

  • PDF

An Estimation of the Standard Cost of Project Management of Empowerment Sector in Comprehensive Rural Village Development Project (일반농산어촌개발 지역역량강화사업비의 적정요율 산정)

  • Choi, Young-Wan;Park, Hyun-Yong;Kim, Young-Joo
    • Journal of Korean Society of Rural Planning
    • /
    • v.19 no.3
    • /
    • pp.131-144
    • /
    • 2013
  • The existing standard cost of project management of empowerment sector in general rural development project has problems with standard cost system without considering characteristics of empowerment project and unclear division of works. These problems are a lot of trouble to fulfill the project. Thus, it needs an arrangement of standard cost considering detailed characteristics of project management in the empowerment sector. The contents and results of this study can be summarized as follows. 1) To set accurate standard cost, we carried out three-step processes, such as elicitation of standard works, calculation of workload and determination of standard cost. (1) In an investigation of 30 rural area dividing 8 parts about an workload of empowerment project, an average workload is 1,499 hours. (2) Based on this results, the standard cost is calculated at 15% of project cost in over 600 million won, at 28.75% of project cost in under 500 million won, by standards of empowerment project cost. 2) It set the responsibility management cost to 15% of empowerment project cost considering existing awareness, workload and work professionalism of project management. Based on the results, It suggested the practical use as basis for efficient management of the future empowerment projects. To achieve this, It needs to promote maximizing results on the whole project through the legalization processes including amendment of existing regulations.

The Effect of Project-Based Learning on Science Concepts and Science Learning Motivation (프로젝트 기반 수업이 과학개념 및 과학학습 동기에 미치는 효과)

  • Lee, Yong-seob
    • Journal of the Korean Society of Earth Science Education
    • /
    • v.11 no.3
    • /
    • pp.203-211
    • /
    • 2018
  • The purpose of this study is to investigate the effects of Project-Based Learning on Science Concepts and Science Learning Motivation. This particular study was proceeded to 4th grader at S elementary school, there was a mutual agreement with a homeroom teacher about assigning a research group and comparison group and it was agreed to students by explaining the reason and purpose of the study. There searcher visited in person to pick 22 students for research group and another 20 students for comparison group. For a research group, an experimental group, homeroom teacher, proceeded a science class with the application of Project-Based Learning. The experimental period was set up as a 40 minutes class unit for 12 weeks. After an experimental group, Science Concepts and Science Learning Motivation were examined, data collection and data analysis were proceeded by order. The following experimental results are as below. First, the application of Project-Based Learning method in a class was effective in improvement of Science Concepts acquisition. Second, the application of Project-Based Learning method in a class was effective in cultivation of Science Learning Motivation. Third, the application of Project-Based Learning method in a class had a positive cognition from the learners in the experimental group. Based on the discussions and implications of the results of this study, some suggestions in the follow - up study are as follows. First, applying Project-Base Learning to various science lessons and learning effects can be suggested as one of the new teaching methods. Second, the use of the Project-Based Learning to test the effects of elementary school students' different grades may be regarded as another teaching method for science class.

XML-based Information Model for Interactive Electronic Technical Manual for Urban Regeneration Project

  • Sunghoon Kang;Hyun-Soo Lee;Moonseo Park;Jin-Wook Jung
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.841-846
    • /
    • 2009
  • Recently, the construction industry is getting more complex and sophisticated having the characteristics of a mega project. Mega project pursues a value that can't be gained with an approach of seeing a project as just a simple sum of different parts but a mutual combination. However, the current manuals can't fulfill the needs for supporting, therefore, need a tool to support the decision making and an IETM is expected to take this role. Despite the a lot of expected advantages of IETM, it is still difficult to apply because of the frequent changes of information of detailed process and its complexity. In this research, as part of developing an IETM, we aim to propose a system frame which is based on the analysis of processes of a project. It is basic part of IETM to give information to users and IETM consists of normal mode that offers general information about the urban regeneration project and user-specified mode that gives classified and reorganized information to user. For supporting these functions, IETM should be stored in a form that can classify the information about urban regeneration project and be tagged with meaningful tags. Moreover IETM developers have to consider the interoperability of IETM because it ultimately should be coordinated with overall Project Management System like an iPMIS. We used XML for solution of interoperability because it stores information as just text-file that doesn't need a special form.

  • PDF

A REAL-TIME PMIS BASED INDUSTRIAL CONSTRUCTION PROJECT MANAGEMENT SYSTEM

  • Kyusung Lee;Hojeong Song;Jaehyun Choi
    • International conference on construction engineering and project management
    • /
    • 2013.01a
    • /
    • pp.352-358
    • /
    • 2013
  • As amount of information in construction industry is growing, the role of information system in project management is becoming increasingly important. With the emerging IT application to the advancing construction industry, construction project management system with advanced technology has been progressed vigorously to improve construction productivity and management efficiency. Recently, a web-based Project Management Information System (PMIS) is developed to support decision-making process by efficiently managing project related information generated from various discipline. Many firms are in the process of developing the PMIS system or already have been applied the system to various projects. However, PMIS is still in its early stage of development to be applied at industrial plant construction projects that process management is significantly emphasized for the successful execution of the project. With the complexity of the industrial plant projects, the industry practitioners need to be able to visualize the construction schedule information to manage the project efficiently. This study suggests methodologies for improving PMIS specialized for industrial plant piping construction projects to estimate the baseline schedule and performance measurement more accurately by developing a framework for the piping construction projects. By using this developed system, the researchers expect that piping construction projects will be more efficiently managed on a real-time basis through measuring progress of piping at each and every state of progress milestone and provide management with opportunities to forecast the level of efforts required to execute the remaining work scope in a timely manner

  • PDF

A STUDY ON ANALYSIS OF DELIVERY & CONTRACT SYSTEM FOR INTRODUCTION OF THE INTEGRATED PROJECT DELIVERY (IPD) TO KOREA - Focusing on Delivery and Contract of Public Works -

  • Sulmin Song;Seong-Ah Kim;Yea-Sang Kim;Sangyoon Chin
    • International conference on construction engineering and project management
    • /
    • 2011.02a
    • /
    • pp.142-148
    • /
    • 2011
  • Recently, much attention has been increasingly paid to the efficiency of the delivery system in order to manage construction project in a smooth and effective way. The integrated plan in consideration of the life cycle of building is required for the effective and integrated management of information in a huge amount. To this end, collaboration between each field is indispensable from the beginning of project. But there is a limitation that the designer and the constructor sign the contract separately in the conventional delivery system. In the US, the recent trend is that the Integrated Project Delivery (IPD) has been introduced to improve the effectiveness of project management in an increasing number of the cases where project is implemented by utilizing the IPD. In Korea, there is also an increasing need to introduce the IPD for the integrated project management. Consequently, the purpose of this study is to examine and analyze the laws and the contracts that are applied to domestic cases of placing order and signing contract based on the concept and principle of the IPD before the actual introduction of the IPD. Based on such examination and analysis, this study intends to figure out the constraints to the introduction of the IPD. It is expected that the results of this study will be used as basic data for IPD-related study in the future.

  • PDF

AI-Based Project Similarity Evaluation Model Using Project Scope Statements

  • Ko, Taewoo;Jeong, H. David;Lee, JeeHee
    • International conference on construction engineering and project management
    • /
    • 2022.06a
    • /
    • pp.284-291
    • /
    • 2022
  • Historical data from comparable projects can serve as benchmarking data for an ongoing project's planning during the project scoping phase. As project owners typically store substantial amounts of data generated throughout project life cycles in digitized databases, they can capture appropriate data to support various project planning activities by accessing digital databases. One of the most important work tasks in this process is identifying one or more past projects comparable to a new project. The uniqueness and complexity of construction projects along with unorganized data, impede the reliable identification of comparable past projects. A project scope document provides the preliminary overview of a project in terms of the extent of the project and project requirements. However, narratives and free-formatted descriptions of project scopes are a significant and time-consuming barrier if a human needs to review them and determine similar projects. This study proposes an Artificial Intelligence-driven model for analyzing project scope descriptions and evaluating project similarity using natural language processing (NLP) techniques. The proposed algorithm can intelligently a) extract major work activities from unstructured descriptions held in a database and b) quantify similarities by considering the semantic features of texts representing work activities. The proposed model enhances historical comparable project identification by systematically analyzing project scopes.

  • PDF

A Study on the Current Status and Improvement of BIM in the Government Owner Perspective - Focus on the KEPCO Na-Ju Head Office Project - (공공시설 발주자 관점에서의 BIM 적용 현황 및 개선방안 연구 - 한국전력공사 나주 신사옥 건립공사 사례를 중심으로 -)

  • Sim, Gu-Sik;Kim, Sung-Man;Ahn, Jae-Hong
    • Journal of KIBIM
    • /
    • v.3 no.2
    • /
    • pp.19-27
    • /
    • 2013
  • The application of the BIM for the KEPCO' new headquarters in Naju involved alternative approaches and accompanied many trials-and-errors as the project adopted new targets and purposes that were not used in Korea before. In particular, for a large BIM-based project, clearly defining the BIM-including the objective, scope and the outcome-is critical for a project owner. For a successful implementation, project owners should improve the utilization of the BIM. Against this background, this research examines the case of the BIM application for the KEPCO' new headquarters in Naju, identifies its effects and problems, and proposes how to improve application of the BIM for public projects. The improvement in the BIM application can be divided into several stages: project order, design development, construction, and post-construction maintenance. In the initial stage, it is important to fully discuss the project planning among participants, and clarify the goal, scope, expected outcomes and role of the BIM. In the design stage, the level of detail (LOD) for the 3D model should be defined in consideration of information use in the stages of estimation and construction. In the construction stage, the scope of project that is managed based on the processing and use of the BIM data should be clearly given and understood. After construction is complete, measures should be sought to use the BIM for maintenance, and corresponding requirements and outcomes should be provided. The analysis is expected to provide basic data for successful implementation of BIM-based public projects, by assisting project owners and involved parties in enhancing work in different stages of a project.

Application of Project Management on Pyro Project (파이로 프로젝트에 프로젝트 관리 적용 방안)

  • Kim, Jeong-Guk;Kim, Hyuck-Jong;Ko, Won-Il;Ku, Jeong-Hoe;Nam, Hyo-On
    • Journal of the Korean Society of Systems Engineering
    • /
    • v.13 no.2
    • /
    • pp.26-33
    • /
    • 2017
  • Pyro project, one of complex project, is now under research and development. To manage this kind project successfully, it is essential to apply the processes of technical management (TM) based on systems engineering (SE) and project management (PM). In this paper, the project management processes from ISO-21500 standard, PMBOK guide, and PRINCE2 guide were reviewed, and then some common PM for the large national R&D project were selected. An integrated technical management and project management frame work was finally established and suggested for Pyro project.

A View from the Bottom: Project-Oriented Risk Mining Approach for Overseas Construction Projects

  • Lee, JeeHee;Son, JeongWook;Yi, June-Seong
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.97-100
    • /
    • 2015
  • Analysis of construction tender documents in overseas projects is a very important issue from a risk management point of view. Unfortunately, majority of construction firms are biased by winning contracts without in-depth analysis of tender documents. As a result, many contractors have incurred loss in overseas projects. Although a lot of risk analysis techniques have been introduced, most of them focus project's external unexpected risks such as country conditions and owner's financial standing. However, because those external risks are difficult to control and take preemptive action, we need to concentrate on project inherent risks. Based on this premise, this paper proposes a project-oriented risk mining approach which could detect and extract project risk factors automatically before they are materialized and assess them. This study presents a methodology regarding how to extract potential risks which exist in owner's project requirements and project tender documents using state of the art data analysis method such as text mining, data mining, and information visualization. The project-oriented risk mining approach is expected to effectively reflect project characteristics to the project risk management and could provide construction firms with valuable business intelligence.

  • PDF