• Title/Summary/Keyword: Project for Urban Regeneration

Search Result 197, Processing Time 0.027 seconds

SUCCESS FACTORS FOR URBAN REGENERATION PROJECT

  • Hae-Rim Kwon;Seul-Ki Lee;Jung-Ho Yu
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.1515-1520
    • /
    • 2009
  • Objective of Urban regeneration project is a recovery of urban utilities through a physical, environmental, cultural, industrial and economic regeneration. The current paradigm of urban regeneration is not a simple redevelopment as physical redevelopment or improvement. Urban regeneration project is an overall development including a central commercial capacity and business capacity for administration and management, cultural facilities, sightseeing, a residential area. So Urban regeneration project include a various project. Project management of Urban Regeneration project is widely different with general project management. For that purpose, this research would offer to contribute the success factors of urban regeneration project for successful project. For offering these, this research analyzed the properties of urban regeneration project and success factors of construction project by reviewing a literature. The principal characteristics are variety objectives of each district of urban regeneration project, a diversity of stakeholder's objectives and complex structure of stakeholders, an unstructured decision-making system, a lack of plan for business cooperation. We abstracted factors for urban regeneration from brainstorming and verification by experienced experts. We suggest 2 factors related to achieving a goal effectively and 10 factors related to progress of urban regeneration project efficiently.

  • PDF

A Study on Policy Alternatives to the Development of Urban Regeneration Project Using AHP Analysis (AHP분석을 이용한 도시재생사업의 발전에 대한 정책적 대안에 관한 연구)

  • Chung, Sam-Seok
    • Journal of the Korean Society of Industry Convergence
    • /
    • v.25 no.6_3
    • /
    • pp.1303-1313
    • /
    • 2022
  • Modern cities need to revitalize the downtown area, which is declining due to population decline, economic recession, and deterioration of the residential environment, economically, socially, and physically by introducing and creating new functions. In addition, the hollowing out of the existing city center is getting worse due to the development of the outskirts of the city. Therefore, the discussion for the development of urban regeneration is the core task of modern cities. This study analyzed based on a basic understanding of urban regeneration projects, and through this, the problems of domestic urban regeneration projects were derived. In addition, the problem factors and major improvement plans of the urban regeneration project were analyzed from the expert's point of view using the AHP analysis technique. Based on this, the purpose is to present policy alternatives for the future development of urban regeneration projects. The problems derived to present the policy alternatives and improvement directions of the urban regeneration project were classified into problems related to goal achievement, problems related to the business itself, and problems related to project results. It was subdivided into sub-categories. This study analyzed the problem factors and major improvements from the expert's point of view by using the AHP analysis technique for the problems of the urban regeneration project. Based on the AHP analysis results and experts' opinions, five policy alternatives for the development of urban regeneration projects were presented.

Analysis of Factors Influencing the Satisfaction of Urban Regeneration New Deal Projects - Focusing on the Namhae-gun Urban Regeneration New Deal Project - (도시재생 뉴딜사업 만족도에 영향을 미치는 요인 분석 - 남해군 도시재생 뉴딜사업을 중심으로 -)

  • Jeong, Chi-Hun;Lee, So-Yeong;Joo, Hee-Sun
    • Journal of the Korean Institute of Rural Architecture
    • /
    • v.23 no.4
    • /
    • pp.30-37
    • /
    • 2021
  • The way to check whether the urban regeneration project is going in the right direction is fundamental for understanding the satisfaction of local residents relevant to the project. This study aims to analyze the satisfaction of residents by selecting factors that affect the satisfaction of Namhae-gun residents with urban regeneration projects. Through this, after examining whether the project is being implemented well in accordance with the purpose of the urban regeneration new deal project, this study presents the direction of the Namhae-gun urban regeneration new deal project. In result, in the case of the resident group, satisfaction with security and landscape influenced satisfaction with the entire project. In addition, publicity for urban regeneration projects had the greatest impact on satisfaction, and other neighborhood reliability, urban regeneration-related education, and meetings had the greatest impact on satisfaction with the project. In the case of the merchant group, it was found that the satisfaction with the entire project increased when the satisfaction with the public relations. However, it was found that physical factors, that is, factors for improving the living environment, did not affect satisfaction with urban regeneration projects. The findings of this study, as local parts of Namhae-gun urban regeneration project progresses, can be further expanded to the holistic county level.

A Study on the Identifying Core Strategies for Urban Regeneration in Old Planned City - Focusing on Wolpi-dong, Ansan - (노후화된 계획도시 도시재생사업의 핵심전략 도출에 관한 연구 - 안산시 월피동을 중심으로 -)

  • Jo, Byung-Sun;Lee, Kang-jun
    • Journal of Urban Science
    • /
    • v.12 no.1
    • /
    • pp.11-20
    • /
    • 2023
  • In the 1960s, planned cities were developed to solve urban issues aroused from rapid urbanization and industrialization. But as time goes by, planned cities are not playing their existed role. As the paradigm of the city has changed over the years from quantitative expansion to qualitative growth, it is resulted to focus more on urban regeneration rather than development. However, most urban regeneration took place mainly in the self-generated old cities. The purpose of this study is to reveal the validity of a project for urban regeneration in old planned city by examining its necessity and possibility. Focusing on the case of Ansan as representative planned city and Wolpi-dong as area of new deal project for urban regeneration, this study examines the historical background and analyzes the current state of Ansan to identify core strategies of project for urban regeneration.

A Study on the Construction of Urban Regeneration Database for Urban Regeneration Project (도시재생사업을 위한 도시재생 DB 구축에 관한 연구)

  • Cho, Byung Ho;Lim, Young Teak;Choi, Bong Moon
    • Proceedings of the Korea Contents Association Conference
    • /
    • 2008.05a
    • /
    • pp.453-457
    • /
    • 2008
  • In this study, we suggested the specifical DB construction that was classified by Urban Regeneration Project through reviewing act related the Urban Regeneration. The DB of Urban Regeneration will be helpful for assisting and managing of Urban Regeneration Project. For this, we examined act & plan for the urban regeneration and deduced the demanded index of the project, in the result, we suggested DB build method. We expect that support and management for urban regeneration through presented index in this study.

  • PDF

A Study on the Linkage Strategy for Urban Regeneration Considering Local Characteristics (지역특성을 고려한 기성시가지의 연계적 재생전략 연구)

  • Kim, Cheol-Su;Jung, Byung-Doo;Kang, Seung-Kyu
    • Journal of the Korean housing association
    • /
    • v.23 no.5
    • /
    • pp.87-94
    • /
    • 2012
  • The primary purposes of this study are to suggest a medium-sized regeneration project which includes the excluded small sites near existing regeneration site, to identify urban improvement type which fits local conditions, and to suggest proper regeneration strategies for the improvement type. Main findings of this study are follows. First, the size of the living environment improvement project in urban area should be larger than 3ha and government's incentives are required for parcel merges to make the medium-size project site. Second, independent type of urban regeneration project should consider local characteristics while center-spread type of urban regeneration project should build a center by providing neighborhood facilities and proper housings. Third, urban regeneration project should be able to utilize local assets, such as cultural heritages, natural landscapes, transportation facilities. Fourth, standards for public support should be prepared to improve local competitiveness. Last, further studies are required for urban regeneration system improvement.

The Role of Public Developer in Urban Regeneration Projects

  • Lee, Sam-Su;Jeong, Kwang-Jin
    • Land and Housing Review
    • /
    • v.8 no.2
    • /
    • pp.59-71
    • /
    • 2017
  • With the passing of Special Act on Promotion and Support for Urban Regeneration (will be hereafter referred to as the Urban Regeneration Special Act) in December 2013, urban regeneration projects have begun in full scale. 13 regions including Jongno District, Seoul were selected as the urban regeneration leading area in 2014 and 33 regions as urban regeneration general regions in 2015 to push ahead a nationwide urban regeneration front supported by government funds. However, it is not clear if these urban regeneration projects will be revitalized by the sole means of government's financial support. Above all, cooperation among all interested parties including the central government that is propelling urban regeneration, local governments, state corporations, private entities, and citizens is urgent. In an urban regeneration project, delegation between state and private entities is absolutely crucial. The central government and the pertinent local government must provide their support by forming new policies and repairing old institutions that are right for urban regeneration, securing the necessary subsidy, and outsourcing government-owned land development. A state corporation must play its part in every aspect that requires public character such as an overall project management of an urban regeneration project, cooperation with the local government, and infrastructure installation. The private stakeholder must share his private capital and know-hows as a construction investor and a development businessman to make possible a successful urban regeneration project. In order for these public and private entities to cooperate with one another, it is necessary to reestablish the role of a public developer and contemplate running an urban regeneration project that permeates public character through a public developer.

Diagnosis of the Policy Tasks for the Execution of an Urban Regeneration Project Plan in Gangwon-do (강원도 도시재생사업계획 수립을 위한 정책 과제 진단)

  • Ham, Kwang-Min
    • Journal of Environmental Science International
    • /
    • v.30 no.5
    • /
    • pp.391-397
    • /
    • 2021
  • This study aims to establish the measures required for strengthening the internal stability of and executing the systematic plan for Gangwon-do in relation to the "urban regeneration preliminary project" launched by the Ministry of Land, Infrastructure, and Transport. The results of this study are as follows. The unit project carried out via the Gangwon-do urban regeneration preliminary project presented the tendency for the standardization of the H/W and S/W projects such as the establishment of the community anchor space and the resident competency reinforcement project. Further, rather than focusing on the contents that could objectively measure the effects of the project, it concentrated more on the performance indicators that are required for verifying the execution of unit projects like the establishment of buildings and operating programs. It was found to be insufficient with regard to the practicality of the project, the correlation with the New Deal Project, and the validity of the project contents. To improve these aspects, Gangwon-do would be required to highlight its distinguishability from the other regions and increase its practicality by operating the field-centered urban regeneration educational program, inducing the participation of experts in each of the areas in case there is a need to execute a project plan and discover a project with placeness. It also needs to focus on strengthening its connection with the urban regeneration new deal project by discovering the resident leaders and professional manpower, and establishing the performance indicators needed for systematically monitoring the regional changes in accordance to the urban regeneration preliminary project.

ANALYZING EFFECTIVE FACTOR OF THE CHANGE MANAGEMENT BASED ON URBAN REGENERATION PROJECT IN REPUBLIC OF KOREA

  • Jae-Pil Seo;Yoon-Ki Choi;Bo-Sik Son;Han-Guk Ryu
    • International conference on construction engineering and project management
    • /
    • 2011.02a
    • /
    • pp.591-596
    • /
    • 2011
  • There are quite a number of business processes in the urban regeneration project. Managers and participants who involved in the project make and use information for the best way to perform in the particular business process. The information can be also reused and produced for data at the next stage. Accordingly, the information sometimes goes out of existence and work data up into new information when the urban regeneration project has been accomplished. But in that case some of changes happen occasionally, the business for urban regeneration has suffered a loss of profit and time as result of confusions about decisions and inappropriate action. For that reason, the information should be analyzed to achieve its aim at the business process under the influence of changes. Then, even though detail processes and management method change, the Core Information, which are important factors for accomplishing the project, help that the project can be operated to solve the problem about confusion and loss of the business. In conclusion, the Core Information is main effective factors for successful urban regeneration projects on the change management. The purpose of this study is to research the information according to the Information-flow and changes, and to find out the influence factors and the Core Information to manage efficiently at the process of urban regeneration projects.

  • PDF

An Analysis of the Urban Regeneration Priority Regions Project Using Quantitative Evaluation Indicators - In Case study of Cheonan Priority Regions - (정량적 평가지표를 활용한 도시재생 선도지역 사업효과 분석 - 천안시 선도지역을 사례로 -)

  • Lyu, Shin-Hyun;Lim, Nam-Gi
    • Journal of the Architectural Institute of Korea Planning & Design
    • /
    • v.35 no.10
    • /
    • pp.83-90
    • /
    • 2019
  • The purpose of the present study is to confirm, through quantitative indices, changes arising with the implementation of urban regeneration projects, with a specific focus on the case of Dongnam-gu, Cheonan, one of the 13 priority rgions in urban regeneration. By utilizing quantitative data including resident population, floating population, revenue, number of small business persons, number of startup companies, and number of licensed buildings, the study confirmed changes in Dongnam-gu and other urban regeneration areas. The study compared monitoring results and implemented project policies to confirm changes within the area as a result of project implementation. Additionally, resident perception toward business districts was surveyed to confirm changes in perception and opinion, and monitoring indices were used to confirm changes as a result of project implementation. Accordingly, the study presented a plan to carry out the assessment of urban regeneration projects, which can be employed as data for conducting future urban regeneration projects. Urban regeneration projects are carried out for the long-term. Therefore, based on monitoring and investigative data, they require constant policy suggestions and periodic monitoring in accordance with changes resulting from project implementation. With regards to the effective range of urban regeneration projects, the study confirmed the possibility of an effect not only in the area of project implementation but also in surrounding areas. However, because the study merely confirms changes in Dongnam-gu, Cheonan, additional research is necessary to ascertain assessment plans suitable to the different types and regional characteristics of urban regeneration projects.