지중 유류오염량 추정을 위한 분배추적자 시험 및 해석방법 (Partitioning Interwell Tracer Test and Analysis Method for Estimating Oil Pollutants in the Underground)

  • 정찬덕;김용철;명우호;방성수;이규상;송성호
    • 한국지하수토양환경학회지:지하수토양환경
    • /
    • 제27권spc호
    • /
    • pp.99-112
    • /
    • 2022
  • From early 2000, many researchers in the groundwater and soil environment remediation project tried to calculate the pollution level and pollution remediation cost and reflect it in the design. In addition, by identifying the movement characteristics of oil pollutants in the underground environment, many researchers tried to derive design factors necessary for pollution purification. However, although the test should be conducted in an area contaminated with oil, the toxicity and risk are too great for testing by deliberately leaking pollutants that are harmful to the human body. And as oil-contaminated areas are promoted by military units such as returned US military bases, there is a limit to access by the general public. In addition, since the indoor simulation test and the field application test have been carried out separately from each other, it was difficult to compare and review various simulation tests Therefore, in this study, PITT (Partitioning Interwell Tracer Test) and analysis methods were specifically presented through actual tests so that field workers could easily use them with the help of the military base and the Korea Rural Community Corporation Soil Environment Restoration Team. However, in order to directly reflect the distribution tracer test results in the pollution remediation design, it is necessary to reduce the analysis errors by comparing the analysis results of the existing soil pollution survey, physical exploration, and numerical modeling. In addition, it is judged to be cautious in the analysis because errors can easily occur due to various factors such as the type of oil at the polluted site, the hydraulic conductivity of the aquifer, and the skill of the researcher.

LNG발전소 입지선정에 관한 주민 수용성 제고연구 (On the Social Acceptance of Site Selection for a LNG Power Plant)

  • 박동규;이재헌
    • 플랜트 저널
    • /
    • 제18권3호
    • /
    • pp.41-51
    • /
    • 2022
  • 최근 LNG발전소 건설이 늘어나고 주민들의 삶의 질 향상 욕구가 증가함에 따라 건설 추진과정에서 주민과의 갈등으로 인한 건설사업 지연으로 전력수급 안정화를 저해하거나 사회적 비용이 증가하는 실정이다. 이에 주민 수용성 강화방안을 연구하여 추후 발전소 건설추진에 도움이 되었으면 하는 바람에서 이 연구를 하였다. 여기서는 주민들의 반대가 가장 심한 단계이며 사업 지연으로 인한 경제적·사회적 손실발생은 물론 극단적일 경우 사업취소까지 연결될 수 있는 입지선정 단계에 한해서 연구를 하였다. 이를 위해 최근 10년 이내 준공한 LNG발전소 준공지연사례를 통해 수많은 발전소가 당초 계획보다 짧게는 수개월에서 길게는 몇 년씩 준공이 지연된 사례를 살펴보았으며, 특히 음성천연가스발전소와 대구LNG발전소 건설 준비중 갈등사례를 분석하여 주민 수용성 제고를 위해서는 첫째 발전소 입지 선정 시 주민의견 수렴이 필요함을 알 수 있었고 둘째 발전소 주변지역 지원에 관한 법률 정비 등 법규 개정이 수반되어야 하며 셋째 발전설비 최신기종 선정 등 환경 친화적 설비구성에 최선을 다해야 함을 알 수 있었다.

  • PDF

Active VM Consolidation for Cloud Data Centers under Energy Saving Approach

  • Saxena, Shailesh;Khan, Mohammad Zubair;Singh, Ravendra;Noorwali, Abdulfattah
    • International Journal of Computer Science & Network Security
    • /
    • 제21권11호
    • /
    • pp.345-353
    • /
    • 2021
  • Cloud computing represent a new era of computing that's forms through the combination of service-oriented architecture (SOA), Internet and grid computing with virtualization technology. Virtualization is a concept through which every cloud is enable to provide on-demand services to the users. Most IT service provider adopt cloud based services for their users to meet the high demand of computation, as it is most flexible, reliable and scalable technology. Energy based performance tradeoff become the main challenge in cloud computing, as its acceptance and popularity increases day by day. Cloud data centers required a huge amount of power supply to the virtualization of servers for maintain on- demand high computing. High power demand increase the energy cost of service providers as well as it also harm the environment through the emission of CO2. An optimization of cloud computing based on energy-performance tradeoff is required to obtain the balance between energy saving and QoS (quality of services) policies of cloud. A study about power usage of resources in cloud data centers based on workload assign to them, says that an idle server consume near about 50% of its peak utilization power [1]. Therefore, more number of underutilized servers in any cloud data center is responsible to reduce the energy performance tradeoff. To handle this issue, a lots of research proposed as energy efficient algorithms for minimize the consumption of energy and also maintain the SLA (service level agreement) at a satisfactory level. VM (virtual machine) consolidation is one such technique that ensured about the balance of energy based SLA. In the scope of this paper, we explore reinforcement with fuzzy logic (RFL) for VM consolidation to achieve energy based SLA. In this proposed RFL based active VM consolidation, the primary objective is to manage physical server (PS) nodes in order to avoid over-utilized and under-utilized, and to optimize the placement of VMs. A dynamic threshold (based on RFL) is proposed for over-utilized PS detection. For over-utilized PS, a VM selection policy based on fuzzy logic is proposed, which selects VM for migration to maintain the balance of SLA. Additionally, it incorporate VM placement policy through categorization of non-overutilized servers as- balanced, under-utilized and critical. CloudSim toolkit is used to simulate the proposed work on real-world work load traces of CoMon Project define by PlanetLab. Simulation results shows that the proposed policies is most energy efficient compared to others in terms of reduction in both electricity usage and SLA violation.

공공스포츠시설 건립의 경제성 평가 및 파급효과 분석 (An Analysis of Economic Evaluation and Spread Effects on the Establishment of Public Sports Facilities)

  • 김진국;장원용;최경호
    • 한국엔터테인먼트산업학회논문지
    • /
    • 제13권1호
    • /
    • pp.111-119
    • /
    • 2019
  • 본 연구는 춘천컬링경기장 건립에 대한 경제성을 평가하고자 하는 목적이 있다. 연구수행을 위해 통계자료 및 선행연구를 검토하는 문헌조사방법이 사용하였으며, 경제적 타당성의 분석과정에서 재무적 타당성 확보를 위해 편익비용비율법(B/C), 순현재가치법(NPV)과 내부수익율법(IRR)을 활용하였으며, 정책적 타당성의 분석은 국가 정책 및 상위 관련 계획과의 문헌 검토를 통해 이루어졌다. 마지막으로 사회 경제적 파급효과를 분석하기 위해서는 산업연관 분석을 활용하였다. 본 연구 결과는 다음과 같다. 첫째, 춘천 컬링경기장 수요분석 결과로 경기장 건립을 통해 춘천권 내의 선수 및 동호인들 외에 서울, 인천, 경기 및 충북권 내의 선수들까지 유입할 수 있을 것으로 판단된다. 둘째, 경제적 타당성 분석 결과, 초기 투자금액으로 인하여 타당성이 부족한 것으로 나타났지만, 선수들의 훈련 및 대회, 그리고 춘천을 비롯한 인근 지역의 시민들의 컬링 종목의 경험 가능성에 대한 장점으로 인해 건립 및 운영이 타당하다고 나타났다. 셋째, 컬링경기장의 정책적 타당성 검토 결과, 춘천 컬링경기장 건립사업은 전문체육인과 생활체육인 모두에게 필요한 공공체육시설로서 정책적으로 타당성이 확보되었다. 마지막으로 컬링경기장의 사회경제적 파급효과 분석결과, 일반 국민들의 만족도는 물론 엘리트 선수의 발굴에도 긍정적인 영향을 미치는 효과를 거둘 수 있을 것이라는 결과를 얻었다.

MAGIC: GALILEO and SBAS Services in a Nutshell

  • Zarraoa, N.;Tajdine, A.;Caro, J.;Alcantarilla, I.;Porras, D.
    • 한국항해항만학회:학술대회논문집
    • /
    • 한국항해항만학회 2006년도 International Symposium on GPS/GNSS Vol.1
    • /
    • pp.27-31
    • /
    • 2006
  • GNSS Services and Applications are today in permanent evolution in all the market sectors. This evolution comprises: ${\bullet}$ New constellations and systems, being GALILEO probably the most relevant example, but not the only one, as other regions of the world also dwell into developing their own elements (e.g. the Chinese Beidou system). ${\bullet}$ Modernisation of existing systems, as is the case of GPS and GLONASS ${\bullet}$ New Augmentation services, WAAS, EGNOS, MSAS, GRAS, GAGAN, and many initiatives from other regions of the world ${\bullet}$ Safety of Life services based on the provision of integrity and reliability of the navigation solutions through SBAS and GBAS systems, for aeronautical or maritime applications ${\bullet}$ New Professional applications, based on the unprecedented accuracies and integrity of the positioning and timing solutions of the new navigation systems with examples in science (geodesy, geophysics), Civil engineering (surveying, construction works), Transportation (fleet management, road tolling) and many others. ${\bullet}$ New Mass-market applications based on cheap and simple GNSS receivers providing accurate (meterlevel) solutions for daily personal navigation and information needs. Being on top of this evolving market requires an active participation on the key elements that drive the GNSS development. Early access to the new GNSS signals and services and appropriate testing facilities are critical to be able to reach a good market position in time before the next evolution, and this is usually accessible only to the large system developers as the US, Europe or Japan. Jumping into this league of GNSS developers requires a large investment and a significant development of technology, which may not be at range for all regions of the world. Bearing in mind this situation, MAGIC appears as a concept initiated by a small region within Europe with the purpose of fostering and supporting the development of advanced applications for the new services that can be enabled by the advent of SBAS systems and GALILEO. MAGIC is a low cost platform based on the application of technology developed within the EGNOS project (the SBAS system in Europe), which encompasses the capacity of providing real time EGNOS and, in the near future, GALILEO-like integrity services. MAGIC is designed to be a testing platform for safety of life and liability critical applications, as well as a provider of operational services for the transport or professional sectors in its region of application. This paper will present in detail the MAGIC concept, the status of development of the system within the Madrid region in Spain, the results of the first on-field demonstrations and the immediate plans for deployment and expansion into a complete SBAS+GALILEO regional augmentation system.

  • PDF

도심지 대규모 지하공사의 리스크 분석 체계 개발 (Development of Risk Analysis Structure for Large-scale Underground Construction in Urban Areas)

  • 서종원;윤지혁;김정환;지성현
    • 한국지반공학회논문집
    • /
    • 제26권3호
    • /
    • pp.59-68
    • /
    • 2010
  • 대규모 공간을 대상으로 하는 도심지 공사는 복잡, 다양한 위험요소가 존재하여 체계적인 리스크 관리가 필요하다. 일반적인 토공사와는 달리 제한된 도시공간이라는 특수한 환경에서 공사가 진행되므로 지반 공학적 특성 외에도 사회, 문화적 불확실성을 통합적으로 관리할 수 있는 특화된 리스크 관리체계의 구축이 필요하다. 본 연구는 먼저 대표적인 리스크 관리 기법의 현황 파악을 통해 기술 분석을 하였다. 설문조사를 실시하여 리스크 인자 파악 및 중요도틀 평가하고 공법별, 카테고리별 체계적으로 분류된 DB를 구축하였으며 이를 기반으로 리스크 추출 모듈과 매트릭스, 스코어 기능을 개발하였다. 확률 및 영향 분석 데이터를 몬테카를로 분석을 통해 예상되는 총 공사비 및 공사기간 분포를 산출할 수 있으며 대응 전, 후 공사비 및 공사기간 분포의 비율 분석이 가능하여 프로젝트의 전 기간에 걸쳐 리스크 관리가 가능한 분석 체계를 구축하였다. 구축된 리스크 관리 체계는 관리 기술 표준화 및 통합 시스템 구축의 토대가 될 것이며 통합적 리스크 관리기법의 개발 및 실용화를 통해 사업의 예산확보 및 운영상 효율성 증대, 효과적인 공정 및 자원관리가 가능하여 결과적으로 지하공사 사업관리의 체제화 및 효율성 증대를 가져와 전체 공사비, 공사기간 저감의 효과를 기대할 수 있다.

스케치업을 활용한 3D 건축모델링 및 물량산출 (3D Architecture Modeling and Quantity Estimation using SketchUp)

  • 김민규;엄대용
    • 예술인문사회 융합 멀티미디어 논문지
    • /
    • 제7권6호
    • /
    • pp.701-708
    • /
    • 2017
  • 건축공사는 설계단계에서 도면을 바탕으로 예상되는 비용이 산정되며, 소요예산의 책정과 예산에 합당한 효율적 공사 방안을 찾게 된다. 정확한 물량산출과 예산책정은 공사의 수익성 여부를 판단하는 척도 중 하나로 매우 중요하다. 하지만 이러한 과정이 대부분 인력이나 2D 도면에 의존하여 수행되기 때문에 오차가 발생하기 쉬웠고, 자동화가 가능한 BIM(Build Information Modeling) 프로그램은 매우 고가이기 때문에 현장에서 적용하기 어려운 시점이다. 이에 본 연구에서는 3차원 모델링 소프트웨어인 스케치업을 이용하여 3D 건축모델링을 수행하고, 물량산출을 할 수 있는 방법론을 제시하고자 하였다. 연구 결과, 건축물의 2D 도면을 이용하여 효과적으로 3D 모델링을 수행하였으며, 모델링 결과를 기반으로 2D 도면과 3D 모델링을 통한 물량산출의 차이를 산출할 수 있었다. 연구를 통해 스케치업을 활용한 3D 모델링과 물량산출이 기존의 2D 산출식의 오류를 방지할 수 있다는 가능성을 제시하였다. 지속적인 연구를 통해 연구방법의 활용성이 검증된다면 건축 모델링과 물량산출 업무 효율성 증가에 크게 기여할 것이다.

Data Refactor 기법의 개선을 통한 건설원자재 가격 예측 적용성 연구 (A Study on the Application of the Price Prediction of Construction Materials through the Improvement of Data Refactor Techniques)

  • 리우양;이동은;김병수
    • 한국건설관리학회논문집
    • /
    • 제24권6호
    • /
    • pp.66-73
    • /
    • 2023
  • 건설 프로젝트는 기획부터 완공까지 공사비 예측, 확인, 그리고 정산 단계로 이루어진다. 건설원자재 평균 가격은 변동성을 지닌다. 하지만 건설 프로젝트의 자재비 산정은 계획단계 시점의 시세를 반영하여 결정되기 때문에, 시공단계에서 자재가 투입될 시점의 시세 변동에 따라 예상한 가격과 차이가 날 수 있다. 건설 산업은 건설원자재 가격 변동으로 인한 수요예측 실패, 프로젝트 비용변경으로 인한 사용자 비용 증가, 예측 체계성 부족으로 인한 손실이 발생한다. 이에 따라 건설원자재 가격 예측의 정확도 개선이 필요하다. 본 연구는 Data Refactor 기법의 개선을 통해 건설원자재 가격 예측 및 적용성 검증을 목적으로 한다. 건설원자재의 가격 예측의 정확도를 높이기 위하여 기존의 데이터 리팩토 간의 저·고빈도의 분류 및 ARIMAX 활용법을 빈도 위주 및 ARIMA 기법 활용으로 개선하여 건설원자재 목재, 시멘트 등 6개 품목의 단기(미래 3개월), 중기(미래 6개월), 장기(미래 12개월) 가격을 예측하였다. 분석한 결과 개선된 Data Refactor 기법을 기반으로 한 예측값이 오차는 줄었고 변동성은 확장되었다. 따라서, 본 연구에서 제안된 Data Refactor 기법을 통해 건설원자재 가격을 더 정확하게 예측하여 예산을 효과적으로 관리할 수 있을 것으로 기대된다.

기상조절용 하이브리드 로켓의 실험 설계 및 활용연구 (Study on Weather Modification Hybrid Rocket Experimental Design and Application)

  • 차주완;김부요;;노용훈;고아름;김선희;박동오;박지만;구해정;장기호;이용희;김수종
    • 대기
    • /
    • 제34권2호
    • /
    • pp.203-216
    • /
    • 2024
  • The National Institute of Meteorological Sciences in Korea has developed the Weather Modification Hybrid Rocket (WMHR), an advanced system that offers enhanced stability and cost-effectiveness over conventional solid-fuel rockets. Designed for precise operation, the WMHR enables accurate control over the ejection altitude of pyrotechnics by modulating the quantity of oxidizer, facilitating specific cloud seeding at various atmospheric layers. Furthermore, the rate of descent for pyrotechnic devices can be adjusted by modifying parachute sizes, allowing for controlled dispersion time and concentration of seeding agents. The rocket's configuration also supports adjustments in the pyrotechnic device's capacity, permitting tailored seeding agent deployment. This innovation reflects significant technical progression and collaborations with local manufacturers, in addition to efforts to secure testing sites and address hybrid rocket production challenges. Notable outcomes of this project include the creation of a national framework for weather modification technology utilizing hybrid rockets, enhanced cloud seeding methods, and the potential for broader meteorological application of hybrid rockets beyond precipitation augmentation. An illustrative case study confirmed the WMHR's operational effectiveness, although the impact on cloud seeding was limited by unfavorable weather conditions. This experience has provided valuable insights and affirmed the system's potential for varied uses, such as weather modification and deploying high-altitude meteorological sensors. Nevertheless, the expansion of civilian weather rocket experiments in Korea faces challenges due to inadequate infrastructure and regulatory limitations, underscoring the urgent need for advancements in these areas.

역동적 환경 하에 구매사/주공급사 간의 기술협력은 신제품 개발 프로젝트 성과를 향상시키는가? (A Study on the Technology Collaboration between the Main Supplier and Buyer under the Dynamic Environment: The Focus on the Performance of New Product Development)

  • 이윤숙;함민주;문성욱
    • 기술혁신연구
    • /
    • 제23권3호
    • /
    • pp.397-432
    • /
    • 2015
  • 본 논문에서는 한국 제조기업들을 대상으로 역동적인 환경 하에 공급사와 구매사의 신제품 개발 기술협력이 구매기업의 신제품 개발 프로젝트의 운영성과에 미치는 영향에 관하여 고찰하였다. 한국생산성본부와 지식경제부가 공동으로 조사한 2012년도 한국 600개 제조기업 조사 자료를 기반으로 회귀분석 방법을 사용하여 분석하였다. 독립 변수로 구매사와 구매사의 주요공급사와의 신제품 개발에서의 기술협력을 사용하였고 종속변수로 구매사의 신제품 개발 프로젝트의 품질달성률(quality), 비용절감(cost), 개발일정준수률(time)의 세 가지 운영 성과를 사용하였다. 환경의 역동성을 조절 변수로 사용하였다. 실증분석 결과 공급사와 구매사간의 기술협력이 신제품 개발 프로젝트 품질 달성율 제고에 긍정적인 영향을 주는 것으로 나타났다. 그러나 예상과 달리 환경의 역동성은 오히려 공급사 구매사의 기술협력의 신제품개발 프로젝트 성과에 모두 부정적으로 작용하는 것으로 나타났다. 이에 환경의 역동성이 높은 산업(통신기기산업)과 낮은 산업(조선산업)으로 분리하여 사후분석을 실시하였다. 사후분석결과, 역동성이 낮은 산업에서는 구매사-공급사의 기술협력이 신제품 개발 프로젝트 운영성과에 긍정적인 작용을 하지만 역동성이 높은 산업에서는 구매사-공급사의 기술협력이 구매사의 신제품 개발 프로젝트의 운영성과에 부정적인 영향을 주고 있음을 발견하였다. 역동성이 높은 산업은 새로운 기술이 요구되는 경우가 많아 기존에 지속적으로 거래를 하고 있는 특정 공급업체와의 협력을 통한 축적된 학습효과 및 시너지를 누리기가 어렵고 이에 주공급업체와의 협력이 프로젝트 운영의 효율성으로 연결되지 못하는 것으로 보인다. 반면에 환경의 역동성이 낮은 환경에서는 기존의 공급업체와의 협력을 통한 축적된 협력 역량 프로젝트 운영성과 향상에 긍정적으로 작용하는 것으로 보인다. 이는 신제품 개발 프로젝트의 속성과 횟수는 기업이 처한 환경과 밀접히 관련되어 있고 주 공급업체와의 기술 협력의 효과는 환경에 따라 다르게 나타나고 있음을 시사한다.