It requires an interim performance assessment for BTL business of the sewerage rehabilitation which continues from 2005 till now. Means, It is necessary to make an interim performance assessment and an analysis of an business effect of the sewerage rehabilitation BTL projects which still continues, and we presented an improvement method of the new sewerage rehabilitation project in future. This paper has conducted an analysis of the business effect for 3 local government BTL projects which are completed and under operation as of now in Jincheon-Gun, Cheongju-Si and Gangjin-Gun. As a method of business effect analysis, we conducted a business effect of the 3 places using the index set which we previously set for the business effect analysis. The index set in this research was sectionalized to an improvement effect of operating wastewater treatment plant, an benefit effect of the direct cost, an benefit effect of the indirect cost and an environment friendly effect. We, in this paper, conducted an business effect analysis for 3 sewerage rehabilitation BTL projects which are completed or under operation recently as a demonstration, however we judge that an business effect analysis shall be conducted in a stage that a significant time for operation has passed since the completion of the construction in order to induce an actual business effect of the sewerage rehabilitation BTL project.
[ $ulcorner$ ]Cost-Effectiveness Analysis$\lrcorner$ has been wifely used to evaluate economic efficiency of R&D projects, but most of cost-effectiveness evaluation systems have some problems such as systematic method for setting and evaluating cost factors, estimation of single effect on each R&D project, and estimation of cross effects among R&D projects. To solve these problems, we have designed a new evaluation indicator called a $ulcorner$Cost-Cross Effect Integration Indicator$lrcorner$ including cross effects developed in this research. The major research findings are summarized as follows : (1) $ulcorner$Coist Estimation Model$lrcorner$, which estimates the cost factors divided into two classes of assembly product and system product and then integrates the total cost values, has been designed. (2) A new method for estimating parameters of cross effects among R&D projects has been developed. (3) $ulcorner$Cross Effects Estimation Model$lrcorner$ to estimate multi-effects and cross effects by completion time among several projects has been designed. (4) $ulcorner$Integration Estimation Indicator$lrcorner$ for setting priority on a project group has been extracted by combination of total cost value and total effect value.
건설 프로젝트의 단위작업을 기반으로 발생되는 노무자의 작업시간은 진행된 실적물량 정보와 연계되어 생산성 정보로 가공되고 이는 다시 해당 단위작업의 공정관리와 연계됨으로써 프로젝트의 계획 대비 실적을 비교 및 분석할 수 있는 근거자료로 활용 될 수 있다. 또한 이러한 작업정보(노무자의 작업시간 및 실적물량 정보)는 잔여 작업 일정에 대한 예측 및 작업조 운영계획 조정 등 공정관리와 관련된 다양한 원천데이터로 제공될 수 있으며, 실적자료로 축적되어 향후 유사 프로젝트의 공사계획 수립에 유용하게 재활용될 수 있다. 본 연구의 목적은 PDA, 바코드, 웹 기술 등을 활용하여 단위작업을 기반으로 발생되는 작업정보를 효과적으로 수집하고 이를 생산성 정보로 가공하여 공정 및 공사관리 업무를 지원하는 전산화 시스템을 개발하는 것이다. 개발 시스템을 통해 분석 및 축적된 생산성 정보는 단위작업의 공정과 연계되어 잔여작업 일정 예측 및 작업조 조정 등 다양한 공정 지원데이터를 제공할 수 있으며 지식관리 차원에서 향후 유사 프로젝트의 공정계획 수립시 매우 유용한 참고자료로 활용될 수 있을 것으로 기대된다.
In this study, the implications for landscape architecture in the restoration Project of Cheonggyecheon will be shown through the analysis of factors for landscape architect scheme modification. The method of study consists of theoretical study, analysis of the plan and design of landscape architecture of the restoration project of Cheonggyecheon, and deduction of implications thereof. The controversial feints included the many difficulties in realizing the productive design of landscape architecture due to the selective collecting of public opinion and the problems of settling the complications, the design limit of the turnkey and MA systems, the lack of hydraulic knowledge and technology and the shortage of vegetation monitoring data and experimental materials. The alternative proposals are as follows: 1) there should be agreement between the government organization and the civil group, 2) in the turnkey bidding for the river restoration projects, the river restoration design based on the volume divided into some parts should be reconsidered in order to maintain consistency in the total design, 3) in order to maintain consistency in the planning policies, MA designs should also be introduced and applied from the first stage of the project through its completion, and 4) data such as the safe water level in case of flooding for the facilities and the vegetation and data in connection with the ecological restoration of river should be accumulated. If these controversies are not settled effectively, the river restoration project will be delayed due to complications with the citizens and wasted time and effort will result from the frequent design changes. In addition, landscape architecture in this kind of restoration project is bound to decrease in the future due to frequent changes in the hydraulic-centered design.
지하공간통합지도는 지하안전관리 강화를 목표로 한 「지반침하 예방대책」의 일환으로 '15년 시범구축사업부터 현재까지 구축을 지속하고 있다. 구축된 지하공간통합지도는 행정망 기반의 지하정보 활용시스템을 통한 지자체 담당자 제공, 도면 기반의 지도추출을 통한 지하안전영향평가 전문기관 제공 등으로 활용이 이루어지고 있다. 그러나 별도의 갱신사업이 추진되지 않아 구축된 당시의 정보로만 제공되고 있어 활용에 한계가 있다. 이러한 문제를 해결하고자 「지하안전관리에 관한 특별법」제42조제2항에서는 변동, 갱신이 발생하는 지하정보에 대한 준공도서 제출 의무화에 대한 내용이 명시되어 있으나, 제출 창구가 행정망 기반으로 운영되어, 제출이 미흡한 실정이다. 이에, 국토교통부에서는 온라인 기반의 준공도서제출시스템 구축을 추진하여, 지하개발사업자가 직접 준공도서를 제출하는 형태로의 변화를 꾀하였다. 본 연구에서는 제출되는 준공도서 기반의 갱신자동화 체계 구현을 위해 준공도서 제출에 대한 표준DB를 설계·적용하였으며, 향후, 지하구조물까지 범위를 확대할 예정이다.
Simulation --- The ideal tool for BPR. Work now and CASE tools are static modeling tools. Based on our own customers surveys, we have discovered that the use of process modeling tools thus far has focused on modeling the current(What-Is) state of a business. We have found that 90 percent of reengineering projects, the modeling tools of choice have been flowcharting tools. Static models offer help in understanding the overall nature of an existing process. However, static models can not really help you see the step by step motions towards completion of your goals. In static modeling, you see two pictures in time, usually taken at the current state and final state models of your reengineering project. Static models are usually not object oriented, therefore can not show facility or office layout and movement of entities and objects throughout the facility. However, this does not mean that static modeling does not have its application nor add value to the user as in a few success stories. Simulation helps the team analyze the complex aspects of the project. Many times a plan that looks good on paper might turn out entirely different when put into action. Therefore, simulation helps you look at how situations might work before actual implementation. In particular, computer simulation models help you view a reengineered condition before they are rolled-out. Items such as a lead time and resource allocation.
This study aims to suggest the direction of urban regeneration policies of Gangwon-do in accordance with COVID-19 outbreak, and the results are as follows. First, it is inevitable to urgently execute the project from the perspective of cities and counties in Gangwon-do, where the promotion of urban regeneration projects has been delayed due to COVID-19 incident. As a result, it is highly likely to cause the employees overloaded and have negative effect on achieving the goals of urban regeneration, so, it is necessary to provide support measures at the government and provincial level, such as the actual execution index and the adjusting time of start and completion of particular business. Second, as the uncertainty of COVID-19 continues, it needs to strengthen the operation and monitoring of urban regeneration support centers in Gangwon-do and examine the changes in business operation plans in advance. In particular, the decrease in visitors to traditional markets and restaurants is expected to have a direct effect on small business owners engaged in the service industry. Therefore, it is necessary to actively consider the utilization plans of smart city regeneration, such as online shopping and non-contact payment. Third, it is necessary to phase in smart urban regeneration training focused on information weakness to narrow the digital gap, in preparation for general lifestyle changes such as contactless and non-face-to-face interactions. At a time when new light is being shed on local areas, which are quieter than heavily populated cities, a project that reflects the regional characteristics and culture of Gangwon-do is necessary.
Recently the diversification of construction market and the continuous reduction of construction amount are raising the need of alternative delivery method in the construction industry. The foreign advanced companies actively adopted the CM at Risk delivery method where they perform the service of agent CM in the design phase, and agree GMP(Guaranteed Maximum Price) with the client at the time of 50~80% completion of design. Even in Korea they began to apply that method to pilot projects. In CM at Risk, through the early participation of builder, the level of design completion can be improved and the change order and construction period delay can be minimized. On the other hand, GMP is usually calculated when the design is about 80% complete, so there is uncertainty in the construction cost. Therefore, in this research, the increased amounts of construction cost are analyzed in a number of public construction projects, and GMP calculation process is proposed using the analysis results and CBR(Case-Based Reasoning) technique to reduce the construction cost increase in the construction phase.
Official development assistance (ODA) projects are conducted under the auspices of donor countries and on the principle of time-limited implementation for economic development and welfare improvement in a host country. Exit strategies on how to end official assistance are therefore crucial. Sudden economic recession in a donor country could lead to the suspension of ODA projects, which would affect diplomatic relations and project outcomes. Further, exit strategies can help continue the original project and create links with other ODA projects. This study shows how to employ exit strategies in the Korea-Mongolia Greenbelt Plantation Project and has implications for sustainability of development assistance. Exist strategies were not taken into consideration initially. In the course of implementation and management transfer upon the completion of plantation, various facets were considered later on in developing exit strategies. An ideal exit strategy is to reach the extent to which a host country no longer needs official assistance or has capacity of project implementation on its own. A year-by-year transfer of planted areas can be a phase-over strategy. The Korea Forest Service fulfilled transparent cooperation with Mongolian local governments, established appropriate arrangements with stakeholders, secured institutional and financial foundation for follow-up management by a host country, and realized predictability, responsibility, and sustainability. As a local institution, the plantation technology management center has been established for follow-up activities such as the introduction of agro-forestry. When the Korea Forest Service designed an urban forest project as an exit strategy, sustainability was ensured, which has implications in implementing other ODA projects.
Low carbon construction is an important operation management goal such as cost, time, and quality in construction community. This paper introduces a system which measures the variability of carbon dioxide amounts. First, this system allows creating construction operation models of which the level of detail is breakdown into the work task level. Second, the system implements sensitivity analysis along with a ranges of resources that are allocated in an operation model. It facilitates to find the optimal resource combination using the operation performances such as the amount of emissions, operation completion time, and cost. Lastly, it identifies the best fit probability distribution functions of performance criteria given a certain resource combination. It allows project manager to query the percentages to complete the operation within a limitation specified by the system users.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.