• 제목/요약/키워드: Project completion time

검색결과 138건 처리시간 0.025초

하수관거정비 BTL사업의 효과분석 및 방안 수립 연구 (Development of Evaluation Methodology on the Performance of BTL Sewer Rehabilitation Projects)

  • 송호면;조정일;안충희
    • 상하수도학회지
    • /
    • 제24권6호
    • /
    • pp.743-751
    • /
    • 2010
  • It requires an interim performance assessment for BTL business of the sewerage rehabilitation which continues from 2005 till now. Means, It is necessary to make an interim performance assessment and an analysis of an business effect of the sewerage rehabilitation BTL projects which still continues, and we presented an improvement method of the new sewerage rehabilitation project in future. This paper has conducted an analysis of the business effect for 3 local government BTL projects which are completed and under operation as of now in Jincheon-Gun, Cheongju-Si and Gangjin-Gun. As a method of business effect analysis, we conducted a business effect of the 3 places using the index set which we previously set for the business effect analysis. The index set in this research was sectionalized to an improvement effect of operating wastewater treatment plant, an benefit effect of the direct cost, an benefit effect of the indirect cost and an environment friendly effect. We, in this paper, conducted an business effect analysis for 3 sewerage rehabilitation BTL projects which are completed or under operation recently as a demonstration, however we judge that an business effect analysis shall be conducted in a stage that a significant time for operation has passed since the completion of the construction in order to induce an actual business effect of the sewerage rehabilitation BTL project.

R&D프로젝트군의 우선순위 결정을 위한 비용 - 상호효과 통합평가시스템 (A Evaluation System Integrating Cost-Cross Effects of Big Scale R&D Projects)

  • 권철신;이순천;박준호
    • 한국경영과학회지
    • /
    • 제32권2호
    • /
    • pp.163-175
    • /
    • 2007
  • [ $ulcorner$ ]Cost-Effectiveness Analysis$\lrcorner$ has been wifely used to evaluate economic efficiency of R&D projects, but most of cost-effectiveness evaluation systems have some problems such as systematic method for setting and evaluating cost factors, estimation of single effect on each R&D project, and estimation of cross effects among R&D projects. To solve these problems, we have designed a new evaluation indicator called a $ulcorner$Cost-Cross Effect Integration Indicator$lrcorner$ including cross effects developed in this research. The major research findings are summarized as follows : (1) $ulcorner$Coist Estimation Model$lrcorner$, which estimates the cost factors divided into two classes of assembly product and system product and then integrates the total cost values, has been designed. (2) A new method for estimating parameters of cross effects among R&D projects has been developed. (3) $ulcorner$Cross Effects Estimation Model$lrcorner$ to estimate multi-effects and cross effects by completion time among several projects has been designed. (4) $ulcorner$Integration Estimation Indicator$lrcorner$ for setting priority on a project group has been extracted by combination of total cost value and total effect value.

단위작업 생산성 정보를 활용한 공정관리 지원시스템 개발 (The Development of a Schedule Management Support System Using Productivity Information of Construction Activities)

  • 오세욱;박상규;김영석
    • 한국건설관리학회논문집
    • /
    • 제6권6호
    • /
    • pp.181-192
    • /
    • 2005
  • 건설 프로젝트의 단위작업을 기반으로 발생되는 노무자의 작업시간은 진행된 실적물량 정보와 연계되어 생산성 정보로 가공되고 이는 다시 해당 단위작업의 공정관리와 연계됨으로써 프로젝트의 계획 대비 실적을 비교 및 분석할 수 있는 근거자료로 활용 될 수 있다. 또한 이러한 작업정보(노무자의 작업시간 및 실적물량 정보)는 잔여 작업 일정에 대한 예측 및 작업조 운영계획 조정 등 공정관리와 관련된 다양한 원천데이터로 제공될 수 있으며, 실적자료로 축적되어 향후 유사 프로젝트의 공사계획 수립에 유용하게 재활용될 수 있다. 본 연구의 목적은 PDA, 바코드, 웹 기술 등을 활용하여 단위작업을 기반으로 발생되는 작업정보를 효과적으로 수집하고 이를 생산성 정보로 가공하여 공정 및 공사관리 업무를 지원하는 전산화 시스템을 개발하는 것이다. 개발 시스템을 통해 분석 및 축적된 생산성 정보는 단위작업의 공정과 연계되어 잔여작업 일정 예측 및 작업조 조정 등 다양한 공정 지원데이터를 제공할 수 있으며 지식관리 차원에서 향후 유사 프로젝트의 공정계획 수립시 매우 유용한 참고자료로 활용될 수 있을 것으로 기대된다.

청계천복원사업의 조경설계안 변경 요인 분석 (A Study on the Analysis of Factors for Landscape Architect Scheme Modification for the Restoration Project of Cheonggyecheon)

  • 김유리;양병이
    • 한국조경학회지
    • /
    • 제35권5호
    • /
    • pp.16-28
    • /
    • 2007
  • In this study, the implications for landscape architecture in the restoration Project of Cheonggyecheon will be shown through the analysis of factors for landscape architect scheme modification. The method of study consists of theoretical study, analysis of the plan and design of landscape architecture of the restoration project of Cheonggyecheon, and deduction of implications thereof. The controversial feints included the many difficulties in realizing the productive design of landscape architecture due to the selective collecting of public opinion and the problems of settling the complications, the design limit of the turnkey and MA systems, the lack of hydraulic knowledge and technology and the shortage of vegetation monitoring data and experimental materials. The alternative proposals are as follows: 1) there should be agreement between the government organization and the civil group, 2) in the turnkey bidding for the river restoration projects, the river restoration design based on the volume divided into some parts should be reconsidered in order to maintain consistency in the total design, 3) in order to maintain consistency in the planning policies, MA designs should also be introduced and applied from the first stage of the project through its completion, and 4) data such as the safe water level in case of flooding for the facilities and the vegetation and data in connection with the ecological restoration of river should be accumulated. If these controversies are not settled effectively, the river restoration project will be delayed due to complications with the citizens and wasted time and effort will result from the frequent design changes. In addition, landscape architecture in this kind of restoration project is bound to decrease in the future due to frequent changes in the hydraulic-centered design.

지하시설물정보 자동갱신을 위한 준공도서 제출 표준DB 설계 연구 (A Study of the DB Design Standard for Submitting Completion Drawings for Auto-Renewal of Underground Facility Information)

  • 박동현;장용구;류지송
    • 한국측량학회지
    • /
    • 제38권6호
    • /
    • pp.681-688
    • /
    • 2020
  • 지하공간통합지도는 지하안전관리 강화를 목표로 한 「지반침하 예방대책」의 일환으로 '15년 시범구축사업부터 현재까지 구축을 지속하고 있다. 구축된 지하공간통합지도는 행정망 기반의 지하정보 활용시스템을 통한 지자체 담당자 제공, 도면 기반의 지도추출을 통한 지하안전영향평가 전문기관 제공 등으로 활용이 이루어지고 있다. 그러나 별도의 갱신사업이 추진되지 않아 구축된 당시의 정보로만 제공되고 있어 활용에 한계가 있다. 이러한 문제를 해결하고자 「지하안전관리에 관한 특별법」제42조제2항에서는 변동, 갱신이 발생하는 지하정보에 대한 준공도서 제출 의무화에 대한 내용이 명시되어 있으나, 제출 창구가 행정망 기반으로 운영되어, 제출이 미흡한 실정이다. 이에, 국토교통부에서는 온라인 기반의 준공도서제출시스템 구축을 추진하여, 지하개발사업자가 직접 준공도서를 제출하는 형태로의 변화를 꾀하였다. 본 연구에서는 제출되는 준공도서 기반의 갱신자동화 체계 구현을 위해 준공도서 제출에 대한 표준DB를 설계·적용하였으며, 향후, 지하구조물까지 범위를 확대할 예정이다.

반도체 R&D BPR 시뮬레이션 (Resource Based Simulation in Semiconductor Business)

  • 김원경;이종복
    • 한국시뮬레이션학회:학술대회논문집
    • /
    • 한국시뮬레이션학회 2001년도 춘계 학술대회 논문집
    • /
    • pp.31-35
    • /
    • 2001
  • Simulation --- The ideal tool for BPR. Work now and CASE tools are static modeling tools. Based on our own customers surveys, we have discovered that the use of process modeling tools thus far has focused on modeling the current(What-Is) state of a business. We have found that 90 percent of reengineering projects, the modeling tools of choice have been flowcharting tools. Static models offer help in understanding the overall nature of an existing process. However, static models can not really help you see the step by step motions towards completion of your goals. In static modeling, you see two pictures in time, usually taken at the current state and final state models of your reengineering project. Static models are usually not object oriented, therefore can not show facility or office layout and movement of entities and objects throughout the facility. However, this does not mean that static modeling does not have its application nor add value to the user as in a few success stories. Simulation helps the team analyze the complex aspects of the project. Many times a plan that looks good on paper might turn out entirely different when put into action. Therefore, simulation helps you look at how situations might work before actual implementation. In particular, computer simulation models help you view a reengineered condition before they are rolled-out. Items such as a lead time and resource allocation.

  • PDF

코로나19 사태에 따른 강원도 도시재생사업 운영 변화와 과제 (A Study on Changes and Challenges in Operation of Urban Regeneration Project in Gangwon-do Due to COVID-19)

  • 함광민
    • 한국환경과학회지
    • /
    • 제30권2호
    • /
    • pp.153-159
    • /
    • 2021
  • This study aims to suggest the direction of urban regeneration policies of Gangwon-do in accordance with COVID-19 outbreak, and the results are as follows. First, it is inevitable to urgently execute the project from the perspective of cities and counties in Gangwon-do, where the promotion of urban regeneration projects has been delayed due to COVID-19 incident. As a result, it is highly likely to cause the employees overloaded and have negative effect on achieving the goals of urban regeneration, so, it is necessary to provide support measures at the government and provincial level, such as the actual execution index and the adjusting time of start and completion of particular business. Second, as the uncertainty of COVID-19 continues, it needs to strengthen the operation and monitoring of urban regeneration support centers in Gangwon-do and examine the changes in business operation plans in advance. In particular, the decrease in visitors to traditional markets and restaurants is expected to have a direct effect on small business owners engaged in the service industry. Therefore, it is necessary to actively consider the utilization plans of smart city regeneration, such as online shopping and non-contact payment. Third, it is necessary to phase in smart urban regeneration training focused on information weakness to narrow the digital gap, in preparation for general lifestyle changes such as contactless and non-face-to-face interactions. At a time when new light is being shed on local areas, which are quieter than heavily populated cities, a project that reflects the regional characteristics and culture of Gangwon-do is necessary.

공공 건설사업 CM at Risk 적용시 GMP 산출 프로세스 (GMP Calculation Process in CM at Risk for Public Construction Project)

  • 김건성;김정훈;현창택
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2020년도 봄 학술논문 발표대회
    • /
    • pp.48-49
    • /
    • 2020
  • Recently the diversification of construction market and the continuous reduction of construction amount are raising the need of alternative delivery method in the construction industry. The foreign advanced companies actively adopted the CM at Risk delivery method where they perform the service of agent CM in the design phase, and agree GMP(Guaranteed Maximum Price) with the client at the time of 50~80% completion of design. Even in Korea they began to apply that method to pilot projects. In CM at Risk, through the early participation of builder, the level of design completion can be improved and the change order and construction period delay can be minimized. On the other hand, GMP is usually calculated when the design is about 80% complete, so there is uncertainty in the construction cost. Therefore, in this research, the increased amounts of construction cost are analyzed in a number of public construction projects, and GMP calculation process is proposed using the analysis results and CBR(Case-Based Reasoning) technique to reduce the construction cost increase in the construction phase.

  • PDF

Analysis on the exit strategy of ODA for sustainability: a case study from the Greenbelt Plantation Project of Mongolia

  • Kim, Ki Hyun;Kim, Se Bin
    • 농업과학연구
    • /
    • 제47권3호
    • /
    • pp.425-435
    • /
    • 2020
  • Official development assistance (ODA) projects are conducted under the auspices of donor countries and on the principle of time-limited implementation for economic development and welfare improvement in a host country. Exit strategies on how to end official assistance are therefore crucial. Sudden economic recession in a donor country could lead to the suspension of ODA projects, which would affect diplomatic relations and project outcomes. Further, exit strategies can help continue the original project and create links with other ODA projects. This study shows how to employ exit strategies in the Korea-Mongolia Greenbelt Plantation Project and has implications for sustainability of development assistance. Exist strategies were not taken into consideration initially. In the course of implementation and management transfer upon the completion of plantation, various facets were considered later on in developing exit strategies. An ideal exit strategy is to reach the extent to which a host country no longer needs official assistance or has capacity of project implementation on its own. A year-by-year transfer of planted areas can be a phase-over strategy. The Korea Forest Service fulfilled transparent cooperation with Mongolian local governments, established appropriate arrangements with stakeholders, secured institutional and financial foundation for follow-up management by a host country, and realized predictability, responsibility, and sustainability. As a local institution, the plantation technology management center has been established for follow-up activities such as the introduction of agro-forestry. When the Korea Forest Service designed an urban forest project as an exit strategy, sustainability was ensured, which has implications in implementing other ODA projects.

이산 사건 시뮬레이션을 활용한 건설공정 CO2 배출량 추정 시스템 (An Estimating System for the CO2 Emissions using Discrete Event Simulation)

  • 이창용;곽한성;이동은
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2014년도 춘계 학술논문 발표대회
    • /
    • pp.196-197
    • /
    • 2014
  • Low carbon construction is an important operation management goal such as cost, time, and quality in construction community. This paper introduces a system which measures the variability of carbon dioxide amounts. First, this system allows creating construction operation models of which the level of detail is breakdown into the work task level. Second, the system implements sensitivity analysis along with a ranges of resources that are allocated in an operation model. It facilitates to find the optimal resource combination using the operation performances such as the amount of emissions, operation completion time, and cost. Lastly, it identifies the best fit probability distribution functions of performance criteria given a certain resource combination. It allows project manager to query the percentages to complete the operation within a limitation specified by the system users.

  • PDF