A Evaluation System Integrating Cost-Cross Effects of Big Scale R&D Projects

R&D프로젝트군의 우선순위 결정을 위한 비용 - 상호효과 통합평가시스템

  • 권철신 (성균관대학교 시스템경영공학과) ;
  • 이순천 (성균관대학교 시스템경영공학과) ;
  • 박준호 (성균관대학교 과학기술연구소)
  • Published : 2007.06.30

Abstract

[ $ulcorner$ ]Cost-Effectiveness Analysis$\lrcorner$ has been wifely used to evaluate economic efficiency of R&D projects, but most of cost-effectiveness evaluation systems have some problems such as systematic method for setting and evaluating cost factors, estimation of single effect on each R&D project, and estimation of cross effects among R&D projects. To solve these problems, we have designed a new evaluation indicator called a $ulcorner$Cost-Cross Effect Integration Indicator$lrcorner$ including cross effects developed in this research. The major research findings are summarized as follows : (1) $ulcorner$Coist Estimation Model$lrcorner$, which estimates the cost factors divided into two classes of assembly product and system product and then integrates the total cost values, has been designed. (2) A new method for estimating parameters of cross effects among R&D projects has been developed. (3) $ulcorner$Cross Effects Estimation Model$lrcorner$ to estimate multi-effects and cross effects by completion time among several projects has been designed. (4) $ulcorner$Integration Estimation Indicator$lrcorner$ for setting priority on a project group has been extracted by combination of total cost value and total effect value.

Keywords

References

  1. 권철신, 'Feasibility function의 정량화에 근거한 RDPPL/SAFE의 기능구축', 대한산업공학회지, 제8권, 제2호(1982), pp.3-14
  2. 권철신, 'Optimum strategies for evaluation and selection of R&D system alternatives', 성균관대학교 논문집<자연계>, 제32집(1982), pp.253-270
  3. 권철신, 김정훈, 'R&D Project의 계획대체안 평가를 위한 비용효과분석시스템의 설계', Proceeding of IE, 대한산업공학회(1991), p.192
  4. 권철신, 박종길, '목적기초연구를 위한 선행연구과제의 결정구조', Proceeding of IE, OR/MS, (1990), p.180
  5. 권철신, 박준호, '기술개발프로젝트의 평가를 위한 비용분석', 한국방위산업학회지, 제9권, 제1호(2002), pp.1-22
  6. 권철신, 박준호, '연구개발 프로젝트의 평가를 위한 효과분석체계', 한국방위산업학회지, 제10권, 제2호(2003), pp.1-16
  7. 권철신, 박준호, 강일중, 'R&D프로젝트군의 효과추정을 위한 평가시스템의 설계', Proceedings of MS, 한국경영과학회(2003)
  8. Blackman, A.W., 'A Cross Impact Model Applicable to Forecasts for Long Range Planning,' TF&SC, Vol.5, No.3(1973), pp.233-242
  9. Dean, B.V. and L.A. Roepcke, 'Cost Effectiveness in R&D Organization Resource Allocation,' IEEE Transactions on Engineering Management, Vol.EM-16, No.4(1969)
  10. Hobbs, B.F., 'A Comparison of Weighting Methods in Power Plant Siting,' Decision Science, Vol.11(1980), pp.725-737 https://doi.org/10.1111/j.1540-5915.1980.tb01173.x
  11. Hogg, R.V. and A.T. Craig, Introduction to Mathematical Statistics(4th ed.), Macmillan, 1987
  12. Hovanessian, S.V., 'Research and Development of a Large Scale Electronic System,' IEEE Transactions on Engineering Management, Vol.EM-22, No. 3(1975), pp.94-101 https://doi.org/10.1109/TEM.1975.6447216
  13. Kwon, C.-S. and K-T. Cho, 'An Estimation Model for Completion Times Considering the Time Interval between Interdependent R&D Events,' Computers & Industrial Engineering, Vol.33, No.3-4(1997) https://doi.org/10.1016/S0360-8352(97)00027-2
  14. Novaky, E. and K. Lorant, 'A Method for the Analysis of Inter-relationships between Mutually Connected Events : A Cross-Impact Analysis,' Technological Forecasting & Social Change, Vol.12, No.2-3(1978), pp. 201-212 https://doi.org/10.1016/0040-1625(78)90056-2