Analysis of the Performance and Change of Resident Consciousness of the Fishing Village Specialization Capacity Enhancement Project through Surveys - Focusing on the Comparative Analysis of Consciousness of Inland Water and Coastal Residents - (어촌특화 역량강화사업의 성과 및 주민의식 변화분석)

  • Yang, Min-Ho;Kim, Ki-Sung;Koh, Jin-Young
    • Journal of The Korean Society of Agricultural Engineers
    • /
    • v.63 no.2
    • /
    • pp.19-31
    • /
    • 2021
  • The Ministry of Maritime Affairs and Fisheries has been promoting the 'Fishing Village Specialization Capacity Enhancement Project' to pursue sustainable development of villages such as income generation by using local tangible and intangible resources led by local residents at the village level since 2013. For the fishing village-Specialization capacity enhancement project, six training sessions (mainly in the village unit) are selected by the public offering method, and the project (income generating business, village development project, etc.) is developed for the selected village residents. It has a process of establishing a village project plan (a preliminary plan for village development or a sixth preliminary industrialization plan) based on the training of experts 5 times, practice or excursion 1 time). In this study, four villages in Gangwon-do fishing villages (two coastal villages and two inland water villages) were surveyed on the perception and satisfaction of fishing village development projects before and after training. The survey analysis was conducted by dividing the analysis of resident capacity and satisfaction into personal, interpersonal, and social dimensions. The survey was conducted by distributing a survey before and after training, and a 1:1 survey was conducted according to the residents' cognitive status. Based on the survey, factor analysis, reliability analysis, and analysis using the corresponding sample t-test showed an increase of 0.02 for Yangyang Mulchi fishing village, 0.11 for Samcheok Jangho fishing village, and 0.36 for Hongcheon River fishing industry, but Yanggu Jinmok fishing industry was -0.29, unlike other regions. As a result of this analysis, it has been empirically proven that provision of training projects through resident participation is a very important factor for the success of the fishing village project. Therefore, rather than fostering local leaders, training and community activities to strengthen personal capacities of residents participating in the project, it is necessary to operate the software business with a focus.

Prediction Model of Final Project Cost using Multivariate Probabilistic Analysis (MPA) and Bayes' Theorem

  • Yoo, Wi Sung;Hadipriono, FAbian C.
    • Korean Journal of Construction Engineering and Management
    • /
    • v.8 no.5
    • /
    • pp.191-200
    • /
    • 2007
  • This paper introduces a tool for predicting potential cost overrun during project execution and for quantifying the uncertainty on the expected project cost, which is occasionally changed by the unknown effects resulted from project's complications and unforeseen environments. The model proposed in this stuff is useful in diagnosing cost performance as a project progresses and in monitoring the changes of the uncertainty as indicators for a warning signal. This model is intended for the use by project managers who forecast the change of the uncertainty and its magnitude. The paper presents a mathematical approach for modifying the costs of incomplete work packages and project cost, and quantifying reduced uncertainties at a consistent confidence level as actual cost information of an ongoing project is obtained. Furthermore, this approach addresses the effects of actual informed data of completed work packages on the re-estimates of incomplete work packages and describes the impacts on the variation of the uncertainty for the expected project cost incorporating Multivariate Probabilistic Analysis (MPA) and Bayes' Theorem. For the illustration purpose, the Introduced model has employed an example construction project. The results are analyzed to demonstrate the use of the model and illustrate its capabilities.

Entropical Risk Analysis Method for Managing Project Disruptions

  • Ro, In-Kyu
    • Journal of the Korean Operations Research and Management Science Society
    • /
    • v.5 no.1
    • /
    • pp.61-72
    • /
    • 1980
  • This paper is an attempt at developing a method for the analysis and estimation of the effects of project disruptions due to uncertainties. Such uncertainties may result from design changes in large-scale, complex, research and development, or construction projects. An entropical risk analysis method is developed. The method is able to estimate the project capacity to handle equivocation due to design changes and the effects of project disruptions. In an attempt to evaluate the predictive capability of the method, it is compared with the results obtained by a computer Monte Carlo simulation program. It is shown that the entropical risk analysis method may be suggested as an expedient means of evaluating project status for management in the different stages of project execution.

  • PDF

A Case Study on Efficiency Evaluation of DMUs Performances for Digital Pioneer Project by Data Envelopment Analysis Model (DEA를 활용한 차세대첨단콘텐츠육성사업 참여 DMU의 효율성 평가에 관한 사례 연구)

  • Shin, Jae-Shig;Yang, Hae-Sool
    • Journal of Information Technology Services
    • /
    • v.6 no.1
    • /
    • pp.65-81
    • /
    • 2007
  • Recently, the affiliates of the Ministry of Information and Communication have been conducting a performance evaluation study on IT policy projects, based on the performance evaluation model of the U.S. Office of Management and Budgets, with regard to investment in computerization. The performance evaluation model for the policy project could provide the objective information required for the planning, development, and operation of the policy project. However, the performance of the most policy project is likely to be evaluated using the subjective evaluation criteria of evaluators. Therefore, this case study evaluates the relative efficiency using DEA (Data Envelopment Analysis) in order to improve the performance evaluation method of the digital pioneer' project implemented by the Korea IT Industry Promotion Agency. The improvement value of inefficient Decision Making Units (DMUs) was measured by a static efficiency analysis. The measured value will suggest a objective viewpoint of the performance between DMUs to evaluators. In doing so, it will show an appropriate direction for the policy project to be evaluated successfully.

A Meta-Analysis on the Effectiveness of Project Approach in Early Childhood Education (프로젝트 접근법의 효과에 대한 메타분석)

  • Han, Kyung-Hee;Chung, Chung-Hee;Chung, Han-Chul
    • Korean Journal of Child Studies
    • /
    • v.25 no.6
    • /
    • pp.131-152
    • /
    • 2004
  • This study used meta-analysis to synthesize the effectiveness of the project approach. After reviewing 51 studies, we analyzed the effect size of 119 articles published between 1990 and 2002 using SAS 8.2 program. The grand average of the project approach effectiveness was 1.03. This implies that the experimental group that employing the project approach is more effective than control group by the 35 percentile. We also found that the project approach is more effective for preschool children group (1.21, 89%) than for the elementary school children group (0.88, 81%). Specific variables regarding the effectiveness of the project approach were analyzed and its consequences were discussed.

  • PDF

Development of Non-face-to-face Small and Medium-Sized Construction Project Management UI for Owners through Analyzes construction project management-related patents (특허 분석에 의한 발주자용 중.소규모 현장 비대면 건설사업관리 UI개발)

  • Kang, Sang-Chan;Jang, Myung-Houn
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2020.11a
    • /
    • pp.67-68
    • /
    • 2020
  • Real-time information on the construction project required by the owner make the project's transparency and overall productivity will be improved. This study analyzes domestic and foreign patents for construction project management to identify trends in technology development, construct cloud-based construction project management system solution UI, and proposes functions and services for each module. Trend research is conducted through patent search, and the analysis is divided into quantitative analysis which means quantitative statistics and qualitative analysis which means the technical contents of each patent. The construction project management system solution is based on smart devices at small and medium-sized sites, allowing both the owner and the construction personnel to share information.

  • PDF

Case Analysis on Application of Project Delay Analysis Method in Domestic Construction Project (국내 건설공사에서 공기지연 분석방법 적용 사례 분석)

  • Kim, Seon-Gyoo;Kwon, Soonwook
    • Korean Journal of Construction Engineering and Management
    • /
    • v.20 no.6
    • /
    • pp.98-106
    • /
    • 2019
  • Recently, the number of project delay-related claims and disputes in Korean construction projects has been increasing rapidly. This suggests that the domestic construction contract practice, which has traditionally been superior to the client, is changing into a mutually balanced relationship among the contracting parties. The project delay analysis selects the application method according to the type of schedule approved at the start of the construction and how the schedule management was performed during the construction. The most important prerequisite for project delay analysis is that a complete CPM schedule agreed at the beginning of the construction is prepared and the actual progress of such schedule is well documented. This study is about applying the project delay analysis methodology of a case where a contractor claims damages to a client while constructing a large new private building construction project. In this study, it is determined whether the application of the as-planned analysis method is appropriate to the incomplete CPM schedule and then proposes the as-planned vs. as-built analysis method based on the new standard as an alternative. Next, apply the as-planned vs. as-built analysis method to the schedule in the case project, and then compare it with the result of the as-planned analysis method. The purpose of this study is to suggest a project delay analysis method suitable for the domestic schedule management practices, so that it can be used as a meaningful reference in project delay disputes and litigations of domestic construction projects.

A Study on the Improvement of Planning and Monitoring for the Rural Center Village Development Project (농촌중심지 마을만들기를 위한 계획수립과 모니터링 개선 방안)

  • Kang, Sin-Gil;Choi, Young-Wan;Kim, Keun-Ho;Kim, Young-Joo
    • Journal of Korean Society of Rural Planning
    • /
    • v.24 no.3
    • /
    • pp.117-125
    • /
    • 2018
  • After it was reorganized as the rural center revitalization project recently, there is an opinion that the nature of the project was changed to solve long-time aspired projects of some districts unlike various projects according to the previous project purposes. Therefore, this study analyzes the current status of revitalization project plans and operation monitoring to make rural center villages, establishes plans that can be applied to the rural center village revitalization project and suggests the improvement plans for monitoring. With the necessity of connectivity with centrality analysis for long-term and sustainable growth of the rural center revitalization project, the analysis on the 8 districts' centrality analysis and the function of the master plan were compared and analyzed, but there is not enough interrelation. Regarding the consulting methods for weak districts to activate facility operation after the project is implemented, the field consulting performed by the collaboration of Gyeongsangnam-do government, Gyeongnam Rural Revitalization Support Center and Gyeongnam branch of Korea Rural Community Corporation shows 87.6% of satisfaction level, which indicates it is the most effective. Based on the above results, it is necessary to reinforce the methods on resident demand survey, dimension and the reflection process of the project when preliminary plans are established for effective implementation of the rural center village revitalization project. It is also necessary to revise relevant standards not to change preliminary plans excessively during the master plan establishment process, and to oblige preliminary investigation of experts. The joint monitoring and consulting systems of experts and local governments should be applied from the establishment stage of the master plan, so that it can be sustainable rural center village revitalization project.

Economic Analysis on the Small & Medium Business Public e-Procurement Information System Project (중소기업 공공구매 판로지원 종합정보시스템 구축사업의 경제성 분석)

  • Jeong, Hoon;Ahn, Jaekyoung
    • Journal of Information Technology Services
    • /
    • v.17 no.2
    • /
    • pp.69-81
    • /
    • 2018
  • This study performed an economic analysis and tested the viability of a public computerization project to create a comprehensive information system for public e-procurement for small and medium-sized businesses (SMBs). The study found that the estimated costs of the project included 4.3 billion won to build the system and 710 million won per year to maintain the system once it is built. The project's estimated total benefits amounted to 6.66 billion won per year, including 5.871 billion won per year in increased convenience for SMBs that use the system, 406 million won per year in benefits for public institutions, and 383 million won per year in benefits for the institution "A" to adopt the system. We used the contingent valuation method (CVM) to estimate the benefits to SMBs, which would be the main participants of the project. The survey found that the SMBs were willing to pay an average fee of 170,136 won. we conducted an economic analysis by applying a 5.5% social discount rate over an analysis period of 10 years and found a benefit-cost ratio of 5.02 and a net present value of 40.201 billion won, which indicated a very high economic viability of the project. The results of this study can be an important reference when deciding whether to pursue computerization projects in the public sector.

Characteristics Analysis on Budget Distribution of Master Plan for Comprehensive Development Projects of Rural Villages (농촌마을종합개발사업의 기본계획 사업비 특성분석)

  • Kim, Dae-Sik;Lee, Seung-Han
    • Journal of Korean Society of Rural Planning
    • /
    • v.17 no.1
    • /
    • pp.13-27
    • /
    • 2011
  • This study analyzed the budget investment plans for the unit-project items(UPI) of 176 project districts for the rural village comprehensive development projects (RVCDP). This study classified the master plan reports of 176 project districts into 88 unit project items in aspect of project management, in order to analyze characteristics of distribution of budget in each project item. Most of all unit project items have similar types of uniform distribution with plus skewness in frequency pattern analysis except the total budget of the project district. This study analyzed the characteristics of budget distribution per province, year, and geographical types of region. Furthermore this paper also analyzed ratio of budget in unit project items to find out distribution pattern of each budget between project items over time. The hierarchical system for UPI of RVCDP consisted of three steps, which are 4 items of the first step on Strength of Rural-urban Exchange & Regional Capability (RURC), Green-income Infrastructure & Facility (GIF), Culture- health-welfare Facility, and Eco-environment & Landscape facility (ELF), 13 items for the second one, and 52 items for the third project items. From the results of the budget investment analysis for 5 years from 2004 to 2008, the budget investment ratios of RURC and ELF have steady state for every year, while GIF in decreasing and ELF in increasing over time. The ratios of UPI on infrastructure were decreased, whereas those on culture, health, and welfare were increased. Portion of tow project items among 52 items, which are community centers for village residents and rural experimental study facility, has 30% of total budget investment. Futhermore, the budget ratios of seven project items showed 50% of total budget. Average value of project budgets for five years was optimized as a type of exponential function in the case of decent array for ranking order.