• Title/Summary/Keyword: Project System

Search Result 6,664, Processing Time 0.034 seconds

A Study on the Effect of R&D Project Management System on R&D Project Performance: Focusing on the Mediating Effects of Integrated Management and Life Cycle Management (R&D 프로젝트관리시스템이 R&D 프로젝트성과에 미치는 영향에 대한 연구: 통합관리 실행 및 전주기관리 실행의 매개효과를 중심으로)

  • Jongho Won;Sungyong Choi;Heekyung Kim;Sohyun Park
    • Journal of Information Technology Services
    • /
    • v.22 no.3
    • /
    • pp.65-83
    • /
    • 2023
  • Due to the development of modern technology and the enlargement of industrial scale, the scale of many projects is expanding and the complexity is also increasing. Individual management of existing projects cannot effectively manage projects in this trend, and it is necessary to systematically manage the entire process from initiation to completion. Accordingly, the need for integrated management and life cycle management that can efficiently manage the entire project is emerging, and for this, a systematic project management system is also required. PMS enables efficient project management by linking business processes such as resource, schedule, scope, and output management of a project with separately separated infrastructure accordingly. In this paper, a research model was proposed to manage the project from the perspective of implementing integrated management and life cycle management, especially during R&D project execution, and to prove the mediating role between PMS and R&D project performance for this purpose. The proposed research model will be able to help companies and organizations that feel the need to implement integrated management and life cycle management and are preparing to build a PMS-type system or that have already been established to efficiently perform project management.

Construction for the Design Project Management System(DPMS) (디자인 프로젝트 관리 시스템(DPMS)의 구성)

  • 우흥룡
    • Archives of design research
    • /
    • v.12 no.3
    • /
    • pp.227-234
    • /
    • 1999
  • We paid attention to the fact that a project will always tend to increase in size even if its scope is narrowing. The complexities and multidisciplinary aspects of projects require that the many parts should be put together so that the prime objectives- performance, time, and cost- are met. These aspects lead to the use of teams to solve problems that used to be solved by individuals. Firstly, We surveyed the design companies and their clients on the design projects, and categorized the design task into 5 phases, that are marketing, planning, idea development, presentation, and follow-up. Among the phases, the presentation has the most difficult task, longest processing time, and highest cost, whereas idea development phase has relatively low cost, longer processing time, and more difficult task. Most of the companies used to be faced several bottlenecks on their design projects - time control, budget control, and resource control. Secondly, for improving the project managing process, we adopted that dividing and analyzing the sub critical paths may help in the effective managing.(Badiru, Adedeji B., 1995) Some critical paths require almost as much attention as the critical path since they have a high potential of becoming critical when changes occur in the network. Therefrom we suggest the Total task weight(Gt) as a management formula for the design project management.${Gt=\mathrm{T}\ast\leftthreetimes\ast1/100}$<\TEX> ( Gt = Total task weight, mathrm{T} = Task Weight, \leftthreetimes= Criticality ) Thirdly, In order to support to managing for the design projects, we set up an application system, which is graphically planning and implementing a complex undertaking. It is helpful to make the control of a project easy. The DPMS(Design Project Management System), which has two sub system. One is Project Screening System(PSS), and another Project Managing System(PMS). In PMS, we divided the design project into three modules; Project Planning, Project Implementation, and Project Evaluation. As a result, the DPMS will contribute to supply the control of a project easily and effectively. Also teams are used for making decisions and taking action with the DPMS. But we need to get further studies on the relationships between the whole project and its tasks.

  • PDF

A study on the electronic document delivery systems (전자식 문헌전송 시스팀에 관한 고찰)

  • 박준식;김정현
    • Journal of Korean Library and Information Science Society
    • /
    • v.16
    • /
    • pp.191-220
    • /
    • 1989
  • This study is an attempt to furnish some helpful data for the design and implementation of the electronic document delivery system based on the analysis of it's cases. To begin with, the concepts and basic models of electronic document delivery system(Fig. 1) were overviewed in the second chapter, on the basis of which the concrete cases were introduced in the third chapter ; ADONIS Project, ARTEMIS Project, HERMES Project, APOLLO Project, UNIVERSE Project, DOCDEL Project, and etc. In the future rapidly developed the technology of electronic communication, there are many possibilities of the evolution of electronic document delivery system.

  • PDF

A Study on the Development of Project Management Information System for Mega Project (대형 건설사업에서의 사업관리정보시스템 구축에 관한 연구)

  • 윤은상;이화기
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.22 no.50
    • /
    • pp.243-255
    • /
    • 1999
  • A mega project such as an international airport construction generally consists of a number of sub-projects. Successful completion of this mega project requires project management information system(PMIS) because control and link of a number of component sub-projects is inevitable. Therefore, the role of PMIS should be more emphasized as the project is processed and managed by fast track concept where the design and construction work is performed concurrently. This study investigates and analyzes the present PMIS developed for the construction project of Inchon International airport. Based on this study, we can suggest the direction of PMIS for a mega project management and how to improve this kind of management information system.

  • PDF

A Study on the Project Evaluation Indicators for the Efficient Integrated Rural Development in Block Grants System (포괄보조금제도하에서 효율적인 농어촌지역개발을 위한 사업평가지표 연구)

  • Lee, Joo-Yong;Kim, Sun-Joo
    • Journal of The Korean Society of Agricultural Engineers
    • /
    • v.53 no.1
    • /
    • pp.57-62
    • /
    • 2011
  • Block Grants System to the agriculture sector has been started from 2010. This paper has been studied for the effective Integrated Rural Development under Block Grants System. For this, project evaluation items and indicators (PEI) were studied by internal and external example and specialist questionnaire on project evaluation. As the result of study, necessity of project, faith of project, efficiency of project, utilization of resources and operating capability were established in planning step, and most important PEI was established the necessity of project. And in enforcement step, performance result, monitering, capability, achievement and maintenance were established, and most important PEI was established performance results. Finally, monitering, capability, achievement and maintenance were established in completion step.

A Study on the Cost Estimate System Development Method for Nuclear Power Plant Construction Projects

  • Lee, Sang Hyun
    • International conference on construction engineering and project management
    • /
    • 2017.10a
    • /
    • pp.133-137
    • /
    • 2017
  • Nuclear power plants in Korea are usually built based on a duplicated model; so the project cost data of the preceding unit can be used as reference when estimating the project cost for the succeeding unit. However, since the contracting method is oriented towards the price, empirical factors such as making top-down estimations using the reverse calculation method based on the completion cost of the preceding unit is dominant. In order to develop a project cost database to resolve such problems, the detailed cost boundary of the project cost data must be categorized by project and by system. This study proposes a method to connect the code of account with the base quantities and the IAEA account, and proposes a database structure for the development of a project cost estimation system. The estimation system developed in the future is expected to utilize the proposed project cost data structure.

  • PDF

Development of Project Management Process for System Integration (SI 프로젝트관리 프로세스 개발)

  • Min, Taek-Kee
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.35 no.3
    • /
    • pp.163-172
    • /
    • 2012
  • Regarding project management, many organizations have developed and distributed general project management knowledge systems, and application fields use the knowledge systems to apply the process suitable for characteristics of a project. This study suggests project management process models to apply to system integration projects. This system integration project management process model is composed of six top processes of initiation, preparation for contract, planning, implementation management, coordination and control, and termination and transfer. The five processes are re-divided into 25 bottom processes. These processes are expressed as input, control, output, and mechanism by using the IDEF0 model. For this model development, it has chosen the items which constituted a process through a questionnaire of experts.

A WEB-BASED PROJECT MANAGEMENT SYSTEM FOR GOVERNMENT R&D PROGRAMS (국가 연구개발을 위한 웹기반의 과제관리 시스템)

  • 손권중
    • Proceedings of the Technology Innovation Conference
    • /
    • 2003.06a
    • /
    • pp.108-115
    • /
    • 2003
  • Government R&D Project Management in Korea has had considerable difficulties because of the lack of project monitoring systems and insufficient communication. The National Program for Tera-level Nanodevices (TND Program) is a ten-year R&D program for commercialization in the area of nano technology. Collaboration and communication among the various participants such as business companies, universities, and government R&D institutes are key success factors in this R&D program. TND Program office has developed a Web-based project management system. This system consists of mostly four sub-management functions: (1) Milestones management of all R&D projects; (2) DR (Design Review) management as the mechanism for checking the performance against milestones; (3) Project activity management using the WBS (Work Breakdown Structure); (4) Budget management. Additionally, it also has many R&D supporting functions such as technology information bulletin board, community management, and visual summary of project progress and performance. This system is effective for monitoring research project as well as measuring project performance of the overall research program. This Web-based system has become the useful tool of R&D moving target mechanism and effective communication and collaboration tool. System features and adoption process of the system are also suggested.

  • PDF

Guidelines for Project Quality Management System (프로젝트 품질경영시스템 지침)

  • Choi Sung-Woon
    • Proceedings of the Safety Management and Science Conference
    • /
    • 2006.04a
    • /
    • pp.525-544
    • /
    • 2006
  • This paper is to introduce guidelines for project quality management system. International standards such as ISO 10006, IEC 62198, ISO/IEC TR 16326 and ISO 15188 are considered. This study is to discuss guidelines for quality management in projects, and application guidelines for project risk management, and guide for the application of ISO/IEC 12207 to software project management, and project management guidelines for terminology standardization.

  • PDF

Design of Architecture for Collaborative Project Management System based on Business Process (프로세스 기반의 협업 프로젝트 관리 시스템 구조 설계)

  • Baek, Jae-Yong;Jung, So-Young;Kim, Bo-Hyun;Yoo, Seock-Kyu;Lee, Seok-Woo;Choi, Hon-Zong
    • Korean Journal of Computational Design and Engineering
    • /
    • v.14 no.5
    • /
    • pp.338-345
    • /
    • 2009
  • c-PMS(collaborative project management system) is a business process(BP) based tool to manage collaborative projects which accomplish common business objectives determined by mutual agreement of companies using limited resources and time. This study analyzes collaborative BP, collaborative projects, and their relation, and proposes the architecture and operation scenario of c-PMS consisted of business process asset management(BPAM) sub-system and project manage(PM) sub-system. BPAM sub-system models private and public BP using a client/server based modeler, defines collaborative BPs process from public BPs, and manages them as companies' asset on a web portal. PM sub-system globally manages collaborative project using planning, execution, monitoring, and analyzing functions.