• Title/Summary/Keyword: Project System

Search Result 6,664, Processing Time 0.032 seconds

A BLOG BASED RISK MANAGEMENT SYSTEM USING SOFT SCHEDULE

  • Soo-Myeong Jin;You-Sang Yoon;Myung-Houn Jang;Sang-Wook Suh
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.1334-1339
    • /
    • 2009
  • To achieve the best performance of a project, uncertainties involved in the building construction process need to be identified in the planning phase of the project. Uncertainties seldom create a positive impact on construction project, but they almost cause delay and increase costs. Therefore, risk management plays a significant role in construction to minimize risk occurred due to uncertainties of a project. Although the importance of the risk management has been known to the construction industry, it is not enough to be developed to meet the demands of the industry. It has not been enough for Systems to control schedule risks for managers in the field. Therefore, a tool is necessary to efficiently control risks. The propose of this study is to invent Schedule Risk Control System Module to prepare for risks in preconstruction phase.

  • PDF

Exploring on Risk Factors of SI Project Escalation and SI Project De-escalation (SI 프로젝트 범위 증감(Escalation/De-escalation)에 영향을 미치는 위험요소에 대한 연구)

  • Kim, Sang-Yoon;Baek, Seung;Choi, Duck-Sun;Oh, Soo-Jin
    • Journal of Information Technology Services
    • /
    • v.3 no.2
    • /
    • pp.53-64
    • /
    • 2004
  • For many reasons, SI(Systems Integration) projects can fail. Sometimes, they can result in considerable financial losses to the organizations that undertake them. These projects are abandoned or redirected. However, the cost of project abandonment or redirection can represent a tremendous waste of organizational resources. By managing failure factors carefully, project managers can prevent projects from failing. Types of project failure can be categorized into escalation and de-escalation. Project escalation is that, as projects progress, the project scopes keep increasing. Project de-escalation is that, as projects progress, the project scopes keep decreasing. This study examine relative importance of risk factors that cause project escalation and de-escalation.

XML-based Information Model for Interactive Electronic Technical Manual for Urban Regeneration Project

  • Sunghoon Kang;Hyun-Soo Lee;Moonseo Park;Jin-Wook Jung
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.841-846
    • /
    • 2009
  • Recently, the construction industry is getting more complex and sophisticated having the characteristics of a mega project. Mega project pursues a value that can't be gained with an approach of seeing a project as just a simple sum of different parts but a mutual combination. However, the current manuals can't fulfill the needs for supporting, therefore, need a tool to support the decision making and an IETM is expected to take this role. Despite the a lot of expected advantages of IETM, it is still difficult to apply because of the frequent changes of information of detailed process and its complexity. In this research, as part of developing an IETM, we aim to propose a system frame which is based on the analysis of processes of a project. It is basic part of IETM to give information to users and IETM consists of normal mode that offers general information about the urban regeneration project and user-specified mode that gives classified and reorganized information to user. For supporting these functions, IETM should be stored in a form that can classify the information about urban regeneration project and be tagged with meaningful tags. Moreover IETM developers have to consider the interoperability of IETM because it ultimately should be coordinated with overall Project Management System like an iPMIS. We used XML for solution of interoperability because it stores information as just text-file that doesn't need a special form.

  • PDF

Considering Claim Costs in Project Time-Cost Mixed Integer Programming Model (클레임코스트를 고려한 프로젝트의 시간-비용 혼합정수계획모형)

  • Kim, Jong-Yul;Kang, Chang-Wook;Hwang, In-Keuk
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.34 no.3
    • /
    • pp.97-105
    • /
    • 2011
  • Previous researches have focused on the efficiency of project execution and the satisfaction of internal customers In view of the fact that a project is successful if any defects are not found in the short-term performance test of the project final outcome. To execute a project that both internal customer and external customer are satisfied in terms of longer-term benefit perspective, the project claim costs (PCC) which may occur for the warranty period of the project final outcome should be considered. We propose a model included PCC to the linear programming between time and cost to expedite a project and perform the validity test by applying the model to an example project. This model and related procedure will contribute to overall project activities' cost reduction by taking preventive actions for PCC.

An Integrated On-Line Diagnostic System for the NORS Process of Maiden Reactor Project: The Design Concept and Lessons Learned

  • Kim, Inn-Seock
    • Nuclear Engineering and Technology
    • /
    • v.32 no.3
    • /
    • pp.261-273
    • /
    • 2000
  • During an extensive review made as part of the Integrated Diagnosis System project of the Maiden Reactor Project, MOAS (Maryland Operator Advisory System) was identified as one of the most thorough systems developed thus far. MOAS is an integrated on-line diagnosis system that encompasses diverse functional aspects that are required for an effective process disturbance management: (1) intelligent process monitoring and alarming, (2) on-line sensor data validation and sensor failure diagnosis, (3) on-line hardware (besides sensors) failure diagnosis, and (4) real-time corrective measure synthesis. The MOAS methodology was used at the Maiden Man-Machine Laboratory HAMMLAB of the OECD Maiden Reactor Project. The performance of MOAS, developed in G2 real-time expert system shell for the high-pressure preheaters of the NORS process in the HAMMLAB, was tested against a variety of transient scenarios, including failures of the control valves and sensors, and tube leakage of the preheaters. These tests showed that MOAS successfully carried out its intended functions, i.e., quickly recognizing an occurring disturbance, correctly diagnosing its cause, and presenting advice on its control to the operator. The lessons learned and insights gained during the implementation and performance tests also are discussed.

  • PDF

A Priority Analysis on Influential Factors for Invigorating Project Management Office (PMO) in Public Sectors based on Analytic Hierarchy Process (AHP) (계층분석과정을 이용한 공공분야 PMO 제도 활성화요인 우선순위 분석)

  • Back, Hyungchung;Kang, Pilsung
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.37 no.4
    • /
    • pp.42-53
    • /
    • 2014
  • This study identifies influential factors for invigorating the public management office (PMO) system for system integration (SI) projects in public sectors and analyzes the priority of each factor from the point of different stakeholders, i.e., owners, SI company, and PMO. Based on the literature review, four first-level influential factors are identified: legal system maintenance, owner's capability, SI company's capability, and PMO's capability. Among them, the PMO's capability is determined as the most critical factor by all the stakeholders. Among the second-level influential factors, the capabilities of professional engineers and project managers are considered as important among the PMO's capability, whereas the reasonable consulting fee is considered as the most critical factor among the legal system maintenance. With respect to each stakeholder, project management capability is considered as the most important factor for owners, while the reasonable consulting fee is considered as the most important factor for PMO.

A Method of Progress Management of Projects Based on Schedule for Small and Medium Enterprises (중소기업을 위한 일정 기반의 프로젝트 진도 관리 방안)

  • Oh, Joseph;Kim, Bo-Hyun;Baek, Jae-Yong;Jung, So-Young;Choi, Young-Jae
    • IE interfaces
    • /
    • v.25 no.2
    • /
    • pp.276-282
    • /
    • 2012
  • Earned value management(EVM) based progress management was designed to systematically manage large or huge projects with budget based criteria. For this reason, existed methods of EVM based progress management have a practical difficulty to apply to small and medium enterprises(SMEs) not possessing enough human resource, time, and cost. In other words, SMEs have performed simultaneously many small-sized projects emphasizing more project delivery than project budget. This study focuses on the area of project management applying to many small-sized projects simultaneously conducted by SMEs. Thus, the method proposed in this study is to manage only the progress of projects after removing cost factor in order to reduce man powers required for allocating the budget of projects to their all activities in detail in the stage of project planning. This study reveals that SMEs are able to manage progress of many projects easily and intuitively using the proposed method.

A Decision Support System for Small & Medium Construction Companies (SMCCs) at the early stages of international projects

  • Park, Chan Young;Jang, Woosik;Hwang, Geunouk;Lee, Kang-Wook;Han, Seung Heon
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.213-216
    • /
    • 2015
  • Despite the significant increase of Korean contractors in the international construction market, many SMCCs (Small & Medium Construction Companies) have suffered in the global financial crisis, and some of them have been kicked out of the international market after experiencing huge losses on projects. SMCCs face obstacles in the international market, such as an insufficient ability to gather information and inappropriate management of associated risks, which lead to difficulties in establishing effective business strategies. In other words, making immature decisions without an effective business strategy may cause not only the failure of one project but also the bankruptcy of the SMCC. To overcome this, the research presented herein aims to propose a decision support system for SMCCs, which would screen projects and make a go/no-go decision at the early stages of international projects. The proposed system comprises a double axis: (1) a profit prediction model, which evaluates 10 project properties using an objective methodology based on a historical project performance database and roughly suggests expected profit rate, and (2) a feasibility assessment model, which evaluates 17 project environment factors in a subjective and quantitative methodology based on experience and supervision. Finally, a web-based system is established to enhance the practical usability, which is expected to be a good reference for inexperienced SMCCs to make proper decisions and establish effective business strategies.

  • PDF

Expert System for Project Selection using Goal Programming (목적계획법을 이용한 프로젝트의 선택을 위한 전문가 시스템 개발)

  • 강경규;김창은;이상호
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.19 no.38
    • /
    • pp.131-138
    • /
    • 1996
  • In real world, the organization has multiple objects. Inorder to solve the multiple objects, we present the goal programming for solving project selection problem we also developed expert system which is focused on function of analysis. User which doesn't have knowledge of goal programming can solve the project selection problem and get a result of analysis.

  • PDF

RESEARCH AND DEVELOPMENT OF PROGRAM MANAGEMENT SUPPORTING SYSTEM

  • Tetsuya Yamada;Shigehiko Tanabe
    • International conference on construction engineering and project management
    • /
    • 2007.03a
    • /
    • pp.480-489
    • /
    • 2007
  • Program management is a concept to deal with huge and complex business activities from social, economical, cultural and environmental points of view and increase their value for client and society. The aim of this study is to establish a framework of program management process and develop a supporting system for program management. In this paper we propose a framework and a proto type supporting system based on case studies and report the result of application to an urban redevelopment using partially implemented software.

  • PDF