• Title/Summary/Keyword: Project System

Search Result 6,664, Processing Time 0.038 seconds

Transportation Economic Analysis Method for a Maglav System (자기부상열차 도입의 교통경제학적 평가방법 연구)

  • Kim Hyun-Woong
    • Proceedings of the KSR Conference
    • /
    • 2005.11a
    • /
    • pp.1276-1280
    • /
    • 2005
  • The Maglav system project affects communities and are usually funded by public agencies. Evaluation of this project that considerably impact whole communities requires public involvement. This specific requirement of transportation projects determines the method of their evaluation as the impacts are estimated from the transportation economic point of view. Especially evaluation criteria must reflect the needs of the interested parties and should consider all foreseeable benefits and losses caused by the Maglav project. To select evaluation criteria and evaluation method may help a decision--maker in making a best selection for a Maglav project.

  • PDF

Overview of the Sambodana Project: Development of Mobile Communication Security System using Hardening Android

  • Cahyo, Darujati;Moh Noor Al, Azam
    • International Journal of Computer Science & Network Security
    • /
    • v.22 no.12
    • /
    • pp.57-62
    • /
    • 2022
  • The Sambodana project is a mobile communication security system development project using Hardening Android. The initial idea for this project is that information leakage occurs outside of a communications application with end-to-end cryptographic security. Android hardening prevents unwanted applications and bloatware from being installed, such as unavailable Google Play Store or install restrictions.

Exploring a BIM-based approach of project management

  • MA, Xiaozhi;XIONG, Feng;DONG, Na
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.241-244
    • /
    • 2015
  • Within the building industry, building information modelling has been widely applied among different organizations, disciplines and project phases. In order to achieve coordination and synergy collaborative effort, it demands organized information flow and communication for effective implementation of project management through the construction process. Although many BIM researches provides solutions for project management, few efforts have involved the whole life-cycle process of project. In this article, BIM-based project management relying on a series of applications of BIM technology was introduced by coupling management requirement of a project with BIM. Through adopting BIM to the life-cycle management of the project and incorporating BIM applications to project management practice, we have developed a BIM-based project management approach that specialize in integrated BIM chain and interface-supporting system. At the end, the developing process of BIM-based project management approach is concluded.

  • PDF

Quality Management Model for Process Performance Level and Development Technology (프로세스 이행 수준과 개발 기술 품질 관리 모델)

  • Park, J.H.;Park, Y.S.;Jung, H.T.;Kim, S.H.
    • Electronics and Telecommunications Trends
    • /
    • v.32 no.6
    • /
    • pp.105-115
    • /
    • 2017
  • This paper describes a project - based quality management model that identifies development technologies and codes while at the same time verifying the ability to implement processes that are essential in R & D projects. In order to verify the process implemented in the R & D project implementation, there are review, checking points, and evaluating methods the process performance levels for five processes such as defining requirements which is the beginning stage of system development, testing process which is the completion stage of system development, and project management and peer review process for project management and support in the proposed project-based quality management model. For development technology and code validation, the model included the documented test cases for each requirement by the developer in the requirements definition stage, debugging and testing in the design and implementation stages, static analysis and open source licence verification procedure, and system environment. After applying the model in SW development R&D project for evaluating the process performance, and verifying the development technology and the code, the developers responded that the improvement in the development technique and the code, and upgrade of process performance level for project are more than 10%.

A Study of Saemangeum Project's Sustainable Development: Focused on local governments of Jeollabukdo (새만금사업의 지속가능한 발전방안 연구: 전라북도 지자체를 중심으로)

  • Kim, Gang-Hoon
    • Korean System Dynamics Review
    • /
    • v.11 no.4
    • /
    • pp.25-59
    • /
    • 2010
  • The Korean government has operated various mega-development projects in order to help nation progress into the future. However, many problems and concerns have been raised on the mega-projects' delay and failure in South Korea. Moreover, there are many technical and executive problems; such as trial and error of development work, failure of validity test, complicated decision-making processes, and so on. With these concerns and problems to mega-development projects, finding a sustainable development from mega-projects is becoming a new issue in the field of mega-development projects. Therefore, the main purpose of this study is to investigate whether or not most mega-development projects conducted by the government exactly corresponds with sustainable development (such as environmental soundness, economic efficiency and social equity) focusing on Saemangeum project. Using causal loop analysis, this study gives some significant results to us. First, for environmental soundness, both central and local government should ensure water-purity control system for farming, industry, leisure, and others. Second, for economic efficiency, both governments not only have to secure a budget for completion of infrastructure of the Saemangeum project but also support financial assistance to Saemangeum project. Third, for social equity, three local governments (i.e., Gunsan, Gimje, and Buan) should stop debate and conflict with regard to an administrative district of Saemangeum region. Finally, most politicians should not use Saemangeum project for political means. Rather, they should recognize the project as a motive power for economic development of Jeollabukdo.

  • PDF

Study on Project Management Method of Naval Ship Building in Monetary Fluctuations (금융환경 변동 하에서 실적가치 기법에 의한 함정건조사업 관리 방안 연구)

  • Kim, Hyung-Man;Seo, Guan-Hee;Kim, Soo-Young
    • Journal of the Society of Naval Architects of Korea
    • /
    • v.42 no.5 s.143
    • /
    • pp.542-549
    • /
    • 2005
  • Naval ships are complex weapon systems which play the integrated performance by system integration of many kinds of weapon systems and their leading ships are usually not disposed after test and evaluation but militarised. Then, strict project management is required for naval ship building projects by identifying problems early and by taking prefer measures in time against unexpected situations encountered in the process of the projects. EVMS is a project management system which can manage the schedule and the budget of a project concurrently and estimate the project's time duration and the cost at project completion. In this paper, the applicability and usefulness of WMS is studied for a assumed navai ship building project, in the environment of monetary fluctuations such as price index, wage increase rate and exchange rate.

DEVELOPMENT OF BIM-BASED DECISION-MAKING SUPPORT SYSTEM FOR APARTMENT REMODELING

  • Dong-Gun Lee;Sik Kim;Hee-Sung Cha;Ju-Yeoun Han
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.1117-1123
    • /
    • 2009
  • Compared with other industries, the construction Industry has many parties(A/E/C) as well as many types of construction activities. Especially, as for the remodeling project, the owner group the remodeling union consists of various stakeholders union and requiring the additional activities of demolition except for the existing new building construction project. Like this, the remodeling project has its own characteristics different from a new building construction project. As for the remodeling project, the Owner's decision making for a remodeling alternative has to be preceded, and other parties are required to propose a remodeling alternative which satisfies the Owner's requirements. However, because of time constraints, many types of problems occur during the decision-making process. In consideration of this, in this research, the authors would like to suggest a decision-making support system to help the Owner's decision-making in the early stage of a remodeling project. For this paper purpose of a remodeling decision-making framework based on Building Information Modeling(BIM) was suggested to help with the Owner's decision-making for each remodeling item and the decision-making support system was evaluated through Case Study.

  • PDF

Exploring the Perception on Drug Utilization Review System and DUR Modernization Pilot Project: A Qualitative Study Using Focus Group Interviews (DUR 제도 및 DUR 고도화 시범사업에 대한 인식 탐구: 포커스 그룹 인터뷰 기법 중심의 질적 연구)

  • Bea, Sungho;Jeon, Ha-Lim;Yoon, Dongwon;Choi, Ahhyung;Lee, Hyesung;Shin, Ju-Young
    • Korean Journal of Clinical Pharmacy
    • /
    • v.31 no.2
    • /
    • pp.104-114
    • /
    • 2021
  • Objective: To explore the perception of drug utilization review (DUR) system and DUR modernization pilot project among healthcare professionals and patients. Methods: We conducted 8 times of focus group interviews (FGI) between August 1, 2019 to December 31, 2019. The healthcare professionals and patients who participated in the DUR modernization pilot project were included in the present study. Based on the type of project participation or medical institution, the participants were divided into the following four groups: group 1, hospital; group 2, clinic; group 3, pharmacy; and group 4, patient. Within each group, interviews were conducted under a pre-defined agenda to identify the implicit perceptions of the participants; the contents of the interviews were, then, categorized. Results: Healthcare professionals established a consensus on the positive aspects of the DUR system and DUR modernization pilot project. However, substantial concerns remain, such as additional workload associated with monitoring adverse events or acquiring consents from patients. Furthermore, a difference of opinion over the DUR convenience system was observed. Among 3 DUR convenience system, the personal medication history review service was highly utilized, but pop-up hold function and communication system was rarely used. Conclusion: We observed that systematic intervention using the DUR system is effective for both healthcare providers and consumers. Adverse events caused by inappropriate drug use can be prevented by continuous patient monitoring. Therefore, the role of DUR system needs to be expanded to establish a safe drug management system.

Integrated design system for supporting product development process ($ezDesign^{(R)}$ System) (제품개발 프로세스를 지원하는 통합설계환경)

  • Lee, Sang-Bong;Kim, Su-Ok;Hong, Tae-Hwa
    • Proceedings of the KSME Conference
    • /
    • 2001.06c
    • /
    • pp.357-360
    • /
    • 2001
  • Design Engineering Group, LG Production engineering Research Center has been developing The Integrated Design Environment enabling engineering design task with ease, speedy and accurate for several years targeting the design departments in LG Electronics. $ezDesign^{(R)}$ System is consisted by Engineering Database Management, Engineering Knowledge Management, 3D Design Application, Design Evaluation Method and Project Management. Engineering Database Management manage the design information effectively. Engineering Knowledge Management takes control of design knowledge from design engineering activity systematically. It is possible for the engineering designer to utilized 3D CAD easily by 3D Design Application. Design Evaluation Method can evaluate several design alternatives synthetically. In Project management System, Designer can simulate the project schedule and cost. In this report, We will introduce how design process can be innovated by way of $ezDesign^{(R)}$ System.

  • PDF

Development of the Irrigation Water Management System in Yongsan river Fourth District (영산강IV지구 농업용수 통합관리시스템 개발)

  • Joo, Uk Jong;Kim, Jin Taek;Park, Jea Heung
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2004.05b
    • /
    • pp.1238-1241
    • /
    • 2004
  • Yongsan river 4th agricultural comprehensive development project is being developed in order to strengthen the competitiveness in the southwest sea-side district, to construct the area for the special product and so on. Different from other development project, this project is to use water from its watershed by means of using regulating reservoirs, small reservoirs and farm ponds. but the number or regulating reservoirs, small reservoirs and farm ponds involved in this project are 7, 147 and 13 respectively. So it is necessary to develope the irrigation water management system for the purpose of efficient water use in Yougsan river fourth district. In this study, the irrigation water management system was developed and by using this system. efficient water using plans could be established.

  • PDF