DOI QR코드

DOI QR Code

Study on Project Management Method of Naval Ship Building in Monetary Fluctuations

금융환경 변동 하에서 실적가치 기법에 의한 함정건조사업 관리 방안 연구

  • Kim, Hyung-Man (Department of Mech. Engineering & Naval Architecture, Naval Academy) ;
  • Seo, Guan-Hee (Department of ship design, Hangin Heavy Industry) ;
  • Kim, Soo-Young (Department of Naval Architecture & Ocean Engineering, Pusan National University)
  • 김형만 (해군사관학교 기계조선공학과) ;
  • 서관희 (한진중공업 특수선 설계팀) ;
  • 김수영 (부산대학교 조선해양공학과)
  • Published : 2005.10.01

Abstract

Naval ships are complex weapon systems which play the integrated performance by system integration of many kinds of weapon systems and their leading ships are usually not disposed after test and evaluation but militarised. Then, strict project management is required for naval ship building projects by identifying problems early and by taking prefer measures in time against unexpected situations encountered in the process of the projects. EVMS is a project management system which can manage the schedule and the budget of a project concurrently and estimate the project's time duration and the cost at project completion. In this paper, the applicability and usefulness of WMS is studied for a assumed navai ship building project, in the environment of monetary fluctuations such as price index, wage increase rate and exchange rate.

Keywords

References

  1. 김철환, 2002 국방 투자사업 관리업무 개선방안, 국방대학교
  2. 원동수, 2002, EVMS 적용을 위한 최적 성과측정 기준선 설정 및 공정편차 산정 방법, 서울대학교 석사학위 논문
  3. White, J.A., 1998, Principles of Engineering Economic Analysis, John Wiley & Sons, Inc
  4. US Navy, 1973, 'Ship Work Breakdown Structure(NAVSHIP 09-00-039-9010)', Department of the US Navy
  5. Fleming, Q.W. and Koppelman J.M., 2000, Earned Value Project Management