Korean Journal of Construction Engineering and Management
/
v.4
no.4
s.16
/
pp.182-191
/
2003
The material lift-up and procurement management for high-rise buildings is complex and critical key to the success of projects. It has been hardly managed by the heuristic or rule-of-thumb techniques which are adapted in usual construction building sites. Especially in downtown high-rise residential building project sites, the limit of heuristic management techniques is critical. It has space constraint for materials loading and site transportation especially in finish work phases in which construction period diverse work trades struggle for their own material and manpower transportation. Hence, it is essential to adapt JIT(Just-In-Time) concept in these particular types of building construction project sites. According to the analysis of the case project sites, the communication and flow of relevant information regarding material lift-up and transportation in project sites is the key factor for successful performance. Therefore, this study analyzes the flow and site transportation of the key materials and provides the system, PLUTO(Procurement & Lift-Up for material Transport Optimizing system). This study also applies the system in the case site and verifies the model validation in actual project.
Lee, Taewon;Kim, Seung-Chul;Lee, Ayeon;Park, So Hyun
Journal of Korean Society of Industrial and Systems Engineering
/
v.45
no.3
/
pp.173-185
/
2022
For the smooth implementation and success of smart city projects, it is necessary to recognize that there is a difference in the perception of value judgments or strategic goals among major stakeholders in the planning process. And it is necessary to aim the values and goals of smart cities through reconciliation of these differences. The two major stakeholders in the smart city development project are citizens group and government officials group. Government officials are in charge of establishing and implementing policies for smart city projects, and their value judgments and perceptions influence the policy direction. In these respects, government officials can be an important stakeholder group. Citizens are a group that includes ordinary residents and business owners who live in smart cities and are the ultimate users of infrastructure and facilities. This study investigated the importance perceptions of citizens and government officials, who are the major stakeholders, about the core values and strategic goals that the smart city project aims. Responses were collected using a structured questionnaire to which the AHP methodology was applied. And the priority of perceptions for constituent items was compared for each stakeholder group. Through the comparative analysis results, it was empirically confirmed that there is a difference in the values and goals pursued by the smart city project between stakeholder groups. As an empirical study on the stakeholders of the smart city project, this study is meaningful in contributing to the theoretical development in that it suggests that the conceptual structural model of the smart city strategy system presented in previous studies can be applied in practice.
IS outsourcing has an important meaning to the Korean SME's (Small and Medium Enterprises) which want to use the IS Services. The objective of this research is to manage IT risks occurred during IS outsourcing project process. This study tries to identify these risks using real option methodology. In order to perform this objective, this study set up the research model which is composed of two main concepts. The first one is the risk factors occurred during IS outsourcing project process: User's Risks, Supplier's Risks and Transaction's Risks. All of these risks are based on Transaction Cost Theory. The second one is the intention to get (or buy) Real Options to manage the risks. In the research model, two types of real option are included: option to abandon (put option) and option to defer (call option). This study uses questionnaires and statistics methodology (PLS) to analyze the hypotheses proposed in the research model. Compared with prior studies, this study is different in two ways. First, this study restricts the range of IT risks. Prior researches of IT Risk management in MIS area cover various range of IT risks, but this study focuses on the Korean SME's IT outsourcing risks on the basis of Transaction Cost Theory. This study tests the relationship between the risks and real option types. Second, this study tries to test the moderating effect of user's risks and supplier's risks on the relationship between transaction's risks and real option types. In IT outsourcing research area, almost studies focus on the direct relationships between IT risks and outsourcing success. But in reality, the co-relationship among IT risks may occur. There are some findings according to the research analysis. First, risks related with user's risks have strong causal relationships with the intention to get option to abandon (put) and option to defer. But risks related with supplier's risks have causal relationships only with option to abandon (put). Second, user's risks and supplier's risks have no moderating effect on the relationship between transaction's risks and real option types. According to the research results, this research have some important and interesting implications on the IS outsourcing business area. First, this study identifies the effective types of real option to minimize the risks occurred during the IT outsourcing projects. So IS outsourcing service users can manage (or minimize) effectively the risks, which occurred during outsourcing projects, using real options. Second, real option gives benefits to suppliers and users at the same time (i.e., win-win strategies between IS outsourcing service providers and users). Vendors (:IS outsourcing service providers) can offer users the real options which can minimize the occurrence of risks in time. "IN TIME" means that before the IS outsourcing project starts, vendors can offer users the opportunity to buy real options in appropriate prices to manage the possibility of the risks of IS outsourcing project. And users also have chance to minimize the IT outsourcing risks occurred during the project process using real options.
Korean Journal of Construction Engineering and Management
/
v.10
no.3
/
pp.139-147
/
2009
Accurate construction cost estimation in the initial stage of building project plays a key role for project success and for mitigation of disputes. Total construction cost(TCC) estimation of apartment projects in Vietnam has become more important because those projects increasingly rise in quantity with the urbanization and population growth. This paper presents the application of artificial neural networks(ANNs) in estimating TCC of apartment projects. Ninety-one questionnaires were collected to identify input variables. Fourteen data sets of completed apartment projects were obtained and processed for training and generalizing the neural network(NN). MATLAB software was used to train the NN. A program was constructed using Visual C++ in order to apply the neural network to realistic projects. The results suggest that this model is reasonable in predicting TCCs for apartment projects and reinforce the reliability of using neural networks to cost models. Although the proposed model is not validated in a rigorous way, the ANN-based model may be useful for both practitioners and researchers. It facilitates systematic predictions in early phases of construction projects. Practitioners are more proactive in estimating construction costs and making consistent decisions in initial phases of apartment projects. Researchers should benefit from exploring insights into its implementation in the real world. The findings are useful not only to researchers and practitioners in the Vietnam Construction Industry(VCI) but also to participants in other developing countries in South East Asia. Since Korea has emerged as the first largest foreign investor in Vietnam, the results of this study may be also useful to participants in Korea.
A satisfactory ending of the project is crucial for the students to achieve success experience. In this study, we analyze the teams' dismantling before the project deadline. We propose a team dissolution model based on the assumption that the disharmony caused by the members' personality traits is the main reason for the team break up. The Dark Triad and the Communion are introduced to build the model. We simulated the proposed model using an agent-based simulation and analyzed the results. We found that the ratio of owning DT impacts the maximum allowable size of the team and the team's rate of dissolution, but the team has been able to reduce the team's dissolution rate by increasing the team's harmony. We expect that we efficiently used the developed model with the agent-based simulation for the studies related to the dismantling of teams.
Recently, the public sector information projects have bebn larger in size, sophisticated, and diversified, which make the performance management model be studied continuously. According to the research and understanding on this, there are discontents resulted from poor requirements managements, schedule delays, budget overruns, failure to achieve expected goals, although there are increase the scale of projects and the number of information systems than ever before. it makes the requirement for the plan to manage significant risk factors systematically. So in this study, we will understand the risks which have been recognized by professionals and managers in public sector projects for enhancing the success rate. And the surveys will be conducted for the risk factors in each fields by gathering the opinions of the hands on workers in public sector project support team such as S company, L company. Finally, the correlation index between the risks and the other project fields would be clear by this survey.
Since the occlusal loading is transmitted to the surrounding bone, the success of an implant treatment is closely related to the distribution of the stress on the implant. The finite element analysis method is often used in order to produce a model for dispersion of stress. Assessment of the success of the implant is usually based on the degree of osseointegration which is a bone and implant surface interface. Implant used in this research was designed through the method of shape optimization after the stress on implant was anaylzed by the finite element analysis method. This study was pertinently assessed by a clinical, histologic, histomorphometric analysis after the shape optimized implant was installed on beagle dog tibia. The results are as follows 1. It clinically showed a good result without mobility and imflammatory reaction. 2. Implant was supported by dense bone and bone remodeling showed on the surrounding area of the implant 3. The average percentage of bone-implant contact was 58.1%.The percentage of bone density was 57.6%. Having above results, shape optimized implant showed the pertinence through clinical and histologic aspects. However, to use the shape optimized implant, the further experiment is required for finding problems, improvement.
This paper compares four models to value a biotechnology R&D project; option tree model, dynamic discounted cash flow(DCF) model, and option thinking DCF model with general DCF model. Real Options, especially 6-folded option tree model yields boner estimate of value than values using other methods. According to sensitivity analysis, sales of final products, number of investigational new drug developments(INDs) and success rates of each stage are key factors for the value of biotechnology R&D investment.
Nowadays, the IS project is getting more and more complicated and large-scaled. Many researchers and practitioners are interested in the IS development methodologies, automated tools and techniques to decrease project failure and to increase IS project performance. This research is to seize the management level of PMO affecting on the IS project, as a new method to increase the IS project development performance. As a result of surveying the present PMO operation state with banks which are the leading industry to accept the PMO in Korea, technology support management and infrastructure management are the core functions to affect the IS performance including schedule management, quality management, and user and stakeholders' satisfaction. Also, the PMO management level is the important point of IS project success. Among the 5 levels PMI suggested, PMO can implement the project effectively at least at the third level. Korean companies introducing the PMO have to do research the PMO core functions and the management levels according to the project scale, and review the distinctive features of their organization to increase the maturity of IS project. This research has been proved through the Full Structural Equation Model. The results show that the five core functions of PMO have relationship with the IS project performance.
Proceedings of the Korean Institute Of Construction Engineering and Management
/
2008.11a
/
pp.591-596
/
2008
Success or failure highly depends on delivery method in construction projects. This paper mainly focused on operation model for technical proposal in Large construction projects. This operational model uses Technical Proposal-Based Tender. This project studied order and delivery method in large construction projects. And delivery systems of international and domestic market are researched, and then condition of delivery system and problems are derived from them. Especially, it researched that it is hard to reflect special feature in large construction projects. As a result of having referenced idea as describe above, this paper will be studied by this process. First, definition of delivery method and large construction projects is researched. Second, delivery systems of international and domestic market are checked. Third, problems and condition of delivery system in large construction projects are investigated. Fourth, application of operation model for technical proposal-based tender are presented in large construction projects.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.