• 제목/요약/키워드: Project Planning Phase

검색결과 233건 처리시간 0.027초

A Systematic Approach Of Construction Management Based On Last Planner System And Its Implementation In The Construction Industry

  • Hussain, SM Abdul Mannan;Sekhar, Dr.T.Seshadri;Fatima, Asra
    • Journal of Construction Engineering and Project Management
    • /
    • 제5권2호
    • /
    • pp.11-15
    • /
    • 2015
  • The Last PlannerSystem (LPS) has been implemented on construction projects to increase work flow reliability, a precondition for project performance againstproductivity and progress targets. The LPS encompasses four tiers of planning processes:master scheduling, phase scheduling, lookahead planning, and commitment / weeklywork planning. This research highlights deficiencies in the current implementation of LPS including poor lookahead planning which results in poor linkage between weeklywork plans and the master schedule. This poor linkage undetermines the ability of theweekly work planning process to select for execution tasks that are critical to projectsuccess. As a result, percent plan complete (PPC) becomes a weak indicator of project progress. The purpose of this research is to improve lookahead planning (the bridgebetween weekly work planning and master scheduling), improve PPC, and improve theselection of tasks that are critical to project success by increasing the link betweenShould, Can, Will, and Did (components of the LPS), thereby rendering PPC a betterindicator of project progress. The research employs the case study research method to describe deficiencies inthe current implementation of the LPS and suggest guidelines for a better application ofLPS in general and lookahead planning in particular. It then introduces an analyticalsimulation model to analyze the lookahead planning process. This is done by examining the impact on PPC of increasing two lookahead planning performance metrics: tasksanticipated (TA) and tasks made ready (TMR). Finally, the research investigates theimportance of the lookahead planning functions: identification and removal ofconstraints, task breakdown, and operations design.The research findings confirm the positive impact of improving lookaheadplanning (i.e., TA and TMR) on PPC. It also recognizes the need to perform lookaheadplanning differently for three types of work involving different levels of uncertainty:stable work, medium uncertainty work, and highly emergent work.The research confirms the LPS rules for practice and specifically the need to planin greater detail as time gets closer to performing the work. It highlights the role of LPSas a production system that incorporates deliberate planning (predetermined andoptimized) and situated planning (flexible and adaptive). Finally, the research presents recommendations for production planningimprovements in three areas: process related, (suggesting guidelines for practice),technical, (highlighting issues with current software programs and advocating theinclusion of collaborative planning capability), and organizational improvements(suggesting transitional steps when applying the LPS).

국가연구개발사업 중간평가방법 연구-선도기술개발사업에의 적용사례-

  • 임윤철;이철원
    • 기술혁신연구
    • /
    • 제5권2호
    • /
    • pp.126-154
    • /
    • 1997
  • This paper addresses a methodology for monitoring the first phase('92-94') progress and its implication fo Highly Advanced National R&D Projects (HAN or G7 project) in Korea. The authors suggest a three-stage life cycle model for the management of national R&D program; planning stage, implementing & monitoring stage, and evaluating & harvesting stage. The interim evaluation, the main focuses of this paper, is one of the key issues for the effective management of national R&D program at the implementing & monitoring stage. The conceptual framework of the interim evaluation was developed both through reviewing related literature and considering the characteristics of the HAN program. A stepwise procedure of interim evaluation was introduced: 'initial screen' and 'detailed examination'. At initial screen all 11 projects were reviewed in terms of both their relevance and performance in order to decide whether further detailed scrutiny is needed or not. If there exist critical problems on the relevance or on the intermediate progress of each project, it is to be under further detailed examination. Evaluation was initiated by the G7 Planning and Evaluation Committee, which was established for advising, directing, and monitoring the HAN Projects, with the help of large number of experts from industries, universities, and research institutes. The monitoring results were reported to the related ministries and project coordinating agencies, and reflected in the second phase.

  • PDF

Use-Case 기반 객체지향 프로젝트 스케줄링 기법 (A Use-Case Based Object-Oriented Project Scheduling Technique)

  • 허진선;최시원;김수동
    • 한국정보과학회논문지:소프트웨어및응용
    • /
    • 제30권3_4호
    • /
    • pp.293-307
    • /
    • 2003
  • 객체지향 개발이 보편화되었지만 객체지향 프로젝트를 지원하는 소프트웨어 관리 기법에 대한 연구가 미흡하다. 또한, 기존의 소프트웨어 관리 기법을 객체지향 프로젝트에 적용하는 것 역시 어려움이 있다. 특히, 늘어가는 객체지향 기반의 대형 프로젝트에 적합한 프로젝트 계획 기법에 대한 연구가 미흡하다. 본 논문에서는 객체지향 프로젝트를 위한 관리 요소 중 스케줄링에 대한 체계화된 기법을 제안한다. 시스템의 기능적인 요구사항이 기술된 Use Case 다이어그램을 이용하여 객체지향 프로젝트 스케줄을 도출해 가는 과정을 Use Case 식별, 상호의존성 분석을 통한 초기 PERT 차트 작성, 각 Use Case의 특성 규명, Iteration 개수 결정, Iteration에 Use Case 할당, 유용한 자원과 제약 사항 고려, Revised PERT 차트 작성의 7 단계로 나누어 제안한다. 각 단계에 내한 입력 물과 중간 산출물, 그리고 수행 지침을 제시한다. 본 논문의 프로젝트 스케줄링 기법은 짧은 개발 기간 동안 고품질의 소프트웨어 생산에 목적을 둔 프로젝트 계획 단계에서 효율적인 기법으로 사용된다.

민관합동형 PF사업의 단계별 리스크 분류 및 위험도분석 (Risk Analysis and Classification of Public-Private Partenership in Project Financing Process)

  • 박혜성;김선국
    • 한국건설관리학회논문집
    • /
    • 제12권5호
    • /
    • pp.117-126
    • /
    • 2011
  • 공공-민간 합동개발 형태의 사업방식으로 시행하는 민관합동형 PF(Project Financing)사업은 2001년 도입이후 급격한 양적 증가를 가져왔으나 2008년 글로벌 금융위기 이후 심각한 침체국면을 맞이하게 되었다. 본 연구에서는 공공시설물 PF 사업의 실 사례를 바탕으로 리스크요인을 도출하고 프로젝트 진행 단계별로 리스크를 분류하여 분석하는 것이며, 단계별 리스크 요인의 위험도 및 중요도를 해당분야 실무자의 설문조사를 토대로 측정하고 리스크인자의 위험도를 산출하였다. 본 연구결과는 사업추진시 각 단계별 리스크인자를 인지하고, 리스크요인의 위험도에 따른 대응전략 수립 및 리스크 관리에 활용 되기를 기대한다.

ICT 기술혁신체계 프로세스 개선방안 연구 : 과제구분 및 선정평가를 중심으로 (A Study on the Process Improvement of ICT Technological Innovation System : with the Focus on Classification and Assessment of R&D Projects)

  • 임명환;고순주;이중만
    • 경영과학
    • /
    • 제33권3호
    • /
    • pp.53-64
    • /
    • 2016
  • The government is mapping out R&D innovation measures aimed at improving the qualitative level of the performance of national R&D projects that are supported by grants or public funds. This paper proposes ways of making improvements in technology planning, project assessment, performance management, and results evaluation in order to boost the efficiency of the country's promotion of ICT R&D projects, as well as to upgrade the processes involved with its technological innovation system at each of the commercialization stages of its R&D projects. According to our experts' in-depth survey and interview, it has been found that technology planning is the most important phase in the full cycle-based technological innovation system and that the promotion of a combination of top-down and bottom-up approaches is the most reasonable. This paper also suggests it is necessary to secure a process for exploring technological opportunities as the preparatory phase for technology planning, and that it is desirable to reflect the technology demand map associated with the technology road map. Currently, R&D projects are divided into policy designation, designation contest, and free contest. To minimize the inefficiency associated with indiscriminate competition, this paper proposes the introduction of a general contest system in order to change the project assessment system into one based on the results of the competition in each category(e.g. firms, universities, research institutions, etc.).

린 건설 관리 방식의 공사 전 설계 진행에 관한 연구 -미국 벨뷰 어린이 병원 사례 조사- (A Study on Preconstruction Process in Support of Lean Project Delivery System - Case Study of Children's Hospital at Bellevue, Wa, U.S.A. -)

  • 김용우;김광호
    • 의료ㆍ복지 건축 : 한국의료복지건축학회 논문집
    • /
    • 제14권4호
    • /
    • pp.47-54
    • /
    • 2008
  • Preconstruction process in a lean project delivery system was studied in one large healthcare project working for a general contractor. Researchers joined a new lean delivery project for approximately six weeks and participated in preconstruction process including design coordination, management coordination, and target costing while concurrently interviewing other project participants and employees, recording activity in meetings, and otherwise observing the process. The preconstruction process in lean project delivery system, called integrated project design, showed many benefits such as brining expertise of downstream players (i.e., mechanical and electrical contractors) into the design phase. However, lack of leadership and lack of design-integrator blocked the successful application of a new concept of design process.

  • PDF

형상관리기법을 활용한 대형 프로젝트 정보화 전략개발 (A Study on Information Strategy Development Using Configuration Management in Large-scale Construction Project)

  • 원서경
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2018년도 춘계 학술논문 발표대회
    • /
    • pp.66-67
    • /
    • 2018
  • Large-scale construction projects require various license and technologies for the manufacturing and handling processes. Also, the whole life cycle business process management determines the success of the project. Then, the efficiency of the business conducted by stakeholders and their possessed technology should be enhanced in order to strengthen their competitive power. For this reason, many experts pointed out to focus on the improvement of the life cycle process and efficient management. Since it is very important to keep up-to-date data and utilize it for work during the long-term project to reflect changes in the large-scale project, the most important part of the project management in project is information change management. Therefore, the objective of this study is applying configuration management(CM) technique in order to managing change data generated for planning in early phase. The result of this research will certainly assist the large-scale project managers in the development of information change management system.

  • PDF

A Simple Interactive 3D Interior Design Application for Living Room - Cost Management

  • Winnie, Chin;Hui, Saw Seow;Gee, Yap Seok
    • Journal of Multimedia Information System
    • /
    • 제4권3호
    • /
    • pp.157-162
    • /
    • 2017
  • The title of this project is "A Simple Interactive 3D Interior Design Application for Living Room - Cost Management", focusing on developing an application that enables costing and designing to be executed concurrently in interior design phases. This is because any changes made at costing phase after design phase is completed, it will potentially lead to unnecessary increase in cost and time. Therefore, the objective of this project is aimed to devise a cost management module to be included in the proposed application, allowing interior designer to make cost-based decision at the designing phase itself. This can be achieved through its proposed functions which include total cost update, budget management, cost estimator calculator and material list generation. The methodology being proposed in this project is Prototyping Development, categorized under Rapid Application Development (RAD), by starting off with planning, analysis, design and implementation phases are performed concurrently and repeatedly in a cycle to produce a prototype until the application is completed. In the end of this project, the developed prototype is expected to contribute a better solution towards cost management in interior design.

A Prototype of Distributed Simulation for Facility Restoration Operation Analysis through Incorporation of Immediate Damage Assessment

  • Hwang, Sungjoo;Choi, MinJi;Starbuck, Richmond;Lee, SangHyun;Park, Moonseo
    • 국제학술발표논문집
    • /
    • The 6th International Conference on Construction Engineering and Project Management
    • /
    • pp.339-343
    • /
    • 2015
  • To rapidly recover ceased functionality of a facility after a catastrophic seismic event, critical decisions on facility repair works are made within a limited period of time. However, prolonged damage assessment of facilities, due to massive damage in the surrounding region and the complicated damage judgment procedures, may impede restoration planning. To assist reliable structural damage estimation without a deep knowledge and rapid interactive analysis among facility damage and restoration operations during the approximate restoration project planning phase, we developed a prototype of distributed facility restoration simulations through the use of high-level architecture (HLA) (IEEE 1516). The simulation prototype, in which three different simulations (including a seismic data retrieval technique, a structural response simulator, and a restoration simulation module) interact with each other, enables immediate damage estimation by promptly detecting earthquake intensity and the restoration operation analysis according to estimated damage. By conducting case simulations and experiments, research outcomes provide key insights into post-disaster restoration planning, including the extent to which facility damage varies according to disaster severity, facility location, and structures. Additional insights arise regarding the extent to which different facility damage patterns impact a project's performance, especially when facility damage is hard to estimate by observation. In particular, an understanding of required type and amount of repair activities (e.g., demolition works, structural reinforcement, frame installation, or finishing works) is expected to support project managers in approximate work scheduling or resource procurement plans.

  • PDF

Tools to Prioritize Construction Phase Sustainability Actions (CPSAs) and to Measure CPSAs Implementation

  • O'Connor, James T.;Torres, Neftali;Kralik, Nancy;Woo, Jeyoung
    • Journal of Construction Engineering and Project Management
    • /
    • 제8권1호
    • /
    • pp.22-30
    • /
    • 2018
  • Achieving sustainability targets on construction projects has increasingly become one of the prime strategies for construction organizations. To provide more detailed guidance on sustainability implementation on projects, Construction Industry Institute (CII) Research Team (RT) 304 developed a catalog of the Construction Phase Sustainability Actions (CPSAs). The primary objective of this paper was the development of two support tools, the CPSA Screening Tool and the CPSA Implementation Index, that could be used to enable efficient application of CPSAs, support sustainability-related decisions, and measure CPSA implementation and performance. The authors developed the tools in four stages: conceptual, detailed planning, tool programming, and testing. The tools were then demonstrated on a capital project to confirm their efficacy and applicability. This paper presents the background, inputs and outputs, and the algorithms of each tool. The CPSA Screening Tool can prioritize the CPSAs most relevant to a project; the CPSA Implementation Index enables continuous monitoring of implementation levels.