• Title/Summary/Keyword: Project Phase

Search Result 1,152, Processing Time 0.024 seconds

Assessing the skills of CMIP5 GCMs in reproducing spatial climatology of precipitation over the coastal area in East Asia (CMIP5 GCM의 동아시아 해안지역에 대한 공간적 강우특성 재현성 평가)

  • Hwang, Syewoon;Cho, Jeapil;Yoon, Kwang Sik
    • Journal of Korea Water Resources Association
    • /
    • v.51 no.8
    • /
    • pp.629-642
    • /
    • 2018
  • Future variability of the spatial patterns of rainfall events is the point of water-related risks and impacts of climate change. Recent related researches are mostly conducted based on the outcomes from General Circulation Models (GCMs), especially Coupled Model Intercomparison Project, phase 5 (CMIP5) GCMs which are the most advanced version of climate modeling system. GCM data have been widely used for various studies as the data utility keep getting improved. Meanwhile the model performances especially for raw GCM outputs are rarely evaluated prior to the applications although the process would essential for reasonable use of model forecasts. This study attempt to quantitatively evaluate the skills of 29 CMIP5 GCMs in reproducing spatial climatologies of precipitation in East Asia. We used 3 different gridded observational data as the references available over the study area and calculated correlation and errors of spatial patterns simulated by GCMs. As a result, the study presented diversity of the GCM evaluation in the performance, rank, or accuracy by different configurations, such as target area, evaluation method, and observation data. Yet, we found that Hadley-centre affiliated models comparatively performs better for the meso-scale area in East Asia and MPI_ESM_MR and CMCC family showed better performance specifically for the korean peninsula. We expect that the results and thoughts of this study would be considered in screening suitable GCMs for specific area, and finally contribute to extensive utilization of the results from climate change related researches.

A Study of the Establishment of Framework for Information Exchange based on IFC Model in Domestic Collaborative Design Environment (국내 협업 설계 환경에서의 IFC기반 정보 교환 프레임워크 구축에 관한 연구)

  • Shin, Joonghwan;Kwon, Soonwook;Lee, Kyuhyup;Choi, Sangduck;Kim, Jinman
    • Korean Journal of Construction Engineering and Management
    • /
    • v.16 no.1
    • /
    • pp.24-34
    • /
    • 2015
  • As recent multilateral collaboration design system has been advanced, BIM based data exchange is a key factor for successful next generation building project. Even though many studies have been trying to set up a data compatibility system for collaboration, There are still a lot of problem in data exchange between design and engineering phase. Therefore, In this study, we analysis causes of problem for information exchange and suggest a IFC based Information exchange framework for improving BIM based design collaboration environment. In order to find out problems that hinder establishment of advanced open BIM information exchange, proper analysis about transition of process from current and to-be BIM based design collaboration process is important, at first. From analysis of main obstacles to information exchange, this research suggests solution plan using open API and IFC based BIM collaboration supporting system. The suggested open API solution named Integrity feedback system perform a role making up for weak point derived from IFC based data exchange. And main system suggestion about framework for IFC based information exchange reflect technological system support, requirement of function for collaboration including API/BCF plug-in.

A Study on the Prediction of Referral Intension based on Customer Satisfaction in Construction Management (CM에서 고객만족도에 기반한 추천의향 예측에 관한 연구)

  • Jeong, Min;Lee, Ghang
    • Korean Journal of Construction Engineering and Management
    • /
    • v.11 no.6
    • /
    • pp.100-110
    • /
    • 2010
  • The main roots of CM service contracts include existing customer repurchases and those made by new customers by existing ones. The study on customers and loyalty can be factors to strengthen CM's competitiveness. However, there have been little attempt to study customer satisfaction and customer loyalty. Construction Management (CM), the advanced construction management method, was introduced 15 years ago in the mid 1990's in the domestic market. The aim of this research is to build a model that can predict customer loyalty based on how much customers are satisfied with CM service. To measure customer satisfaction and loyalty, this research surveyed 135 decision-makers who have experienced CM services. Customer satisfaction was tested and analyzed according to different phases: planning, designing, procurement, construction, and post construction. Referral intention was tested based on NPS theory. Customer types were divided into detractors, passively satisfied and promoters according to the tested measurement and multinomial logistic regression between the satisfaction by construction phases and customer types. This research resulted to a model that can predict customer types: detractors, passively satisfied and promoters, which were determined according to satisfaction level. The initial planning phase also revealed which factor is most influential for a customer to become promoter. These results can be used to acquire customer loyalty by managing the satisfaction of customers through a project under an Internet-based environment. Such can provide the needed information in quickly exploring positive and negative word-of-mouth feedbacks.

A Comparison of the Atmospheric CO2 Concentrations Obtained by an Inverse Modeling System and Passenger Aircraft Based Measurement (인버스 모델링 방법을 통해 추정된 대기 중 이산화탄소 농도와 항공 관측 자료 비교)

  • Kim, Hyunjung;Kim, Hyun Mee;Kim, Jinwoong;Cho, Chun-Ho
    • Atmosphere
    • /
    • v.26 no.3
    • /
    • pp.387-400
    • /
    • 2016
  • In this study, the atmospheric $CO_2$ concentrations estimated by CT2013B, a recent version of CarbonTracker, are compared with $CO_2$ measurements from the Comprehensive Observation Network for Trace gases by Airliner (CONTRAIL) project during 2010-2011. CarbonTracker is an inversion system that estimates surface $CO_2$ fluxes using atmospheric $CO_2$ concentrations. Overall, the model results represented the atmospheric $CO_2$ concentrations well with a slight overestimation compared to observations. In the case of horizontal distribution, variations in the model and observation difference were large in northern Eurasia because most of the model and data mismatch were located in the stratosphere where the model could not represent $CO_2$ variations well enough due to low model resolution at high altitude and existing phase shift from the troposphere. In addition, the model and observation difference became larger in boreal summer. Despite relatively large differences at high latitudes and in boreal summer, overall, the modeled $CO_2$ concentrations fitted well to observations. Vertical profiles of modeled and observed $CO_2$ concentrations showed that the model overestimates the observations at all altitudes, showing nearly constant differences, which implies that the surface $CO_2$ concentration is transported well vertically in the transport model. At Narita, overall differences were small, although the correlation between modeled and observed $CO_2$ concentrations decreased at higher altitude, showing relatively large differences above 225 hPa. The vertical profiles at Moscow and Delhi located on land and at Hawaii on the ocean showed that the model is less accurate on land than on the ocean due to various effects (e.g., biospheric effect) on land compared to the homogeneous ocean surface.

A Study on GIS Implementation and Maintenance Model in Local Governments (지자체 GIS 추진 및 운영모델에 관한 연구)

  • Koh, Kwang-Chul;Kim, Eun-Hyung
    • Journal of Korea Spatial Information System Society
    • /
    • v.4 no.2 s.8
    • /
    • pp.5-22
    • /
    • 2002
  • The considerable budgets for the 2nd-phase NGIS projects are allocated to the projects for developments of the GIS applications. Especially, the 78 local governments are major users of GIS application systems. In spite of GIS necessity in local government, whether a GIS is 'good' or bad, depends on its implementation and operation. How to implement GIS in effective wav and how to measure GIS effect for justifying GIS funding can be major concerns. Because it takes minimum 3-4 years to equal the costs and benefits of GIS, the long-terms implementation strategies for GIS project in local government are required. In order to establish a proper implementation model for the GIS application projects and to promote activities in the projects, this study considers several problems in accordance with the phases of GIS evolution and solutions of these problems. Based an the GIS auditing and consulting experience in local governments, this study constructs a GIS implementation and maintenance model in long and comprehensive perspective. This model can be a key to affective and realistic implementation for the future GIS projects.

  • PDF

Extension of Korea Standard of the CAD Drawings in Construction CALS/EC to Adopt the Port Field (항만분야 수용을 위한 전자도면 작성표준 확장 개발)

  • Moon, Jin-Seok;Han, Choong-Han
    • The Journal of the Korea Contents Association
    • /
    • v.13 no.11
    • /
    • pp.957-967
    • /
    • 2013
  • While a vast number of cad drawings are produced in the life cycle of construction projects from the planning, design, and construction phases to the maintenance and control phases, the creation and distribution of non-standard drawings make it difficult for the construction parties to communicate with one another and to recycle, maintain, and control drawings by project phase. The Korea standard of CAD drawing in construction CALS/EC, which stipulates the standard for construction CAD drawings, is based on roads, rivers, and railways in line- and unit-based structures, allowing the creation of standardized CAD drawings. Such standard, however, cannot be easily applied to construction projects with multiple facilities like harbors, housing sites, or lands consisting of surface forms. In particular, port field consist of complex docks and amenities located in a certain coastal area based on multiple objectives. They also contain the concept of housing sites, like background land, and are composed of various civil engineering facilities, construction facilities, and port field, so that the existing CAD drawing standard cannot be easily implemented. Therefore, the purpose of this study is to maximize the efficiency of the information related to drawing information and to ultimately support smooth information exchanges in construction design by conducting a development research on the expansion of the CAD drawing standard that meets the needs of port field.

A Case Study of BIM-based Framework on Constructability Tasks (BIM기반 골조공사의 시공성분석 업무 적용사례에 관한 연구)

  • Lee, Seung-Il;Kwon, Nam-Ha;Cho, Young-Sang
    • Journal of the Korea Institute of Building Construction
    • /
    • v.10 no.5
    • /
    • pp.45-54
    • /
    • 2010
  • Recently more and more construction projects have become high-rise, complex and intelligent. Accordingly, such projects require an integrated management system for tasks, with a lean approach to construction with work processes for management and productivity. In particular, Construction Information Technology (CIT) fields are concerned with Building Information Modeling (BIM), which represents the process of generating and managing building data during its life cycle. Constructability research has progressed for the project goal which is a cost-time-quality of optimization by integrated construction knowledge and experience. However, the current constructability process has not been performed efficiently, as the existing 2D drawings and papers lack consistent and accurate information, it is difficult to share the contents of work, and the use of information is inefficient. This study proposes that the reformation and enhancement of BIM-based constructability work process can lead to brilliant performance in the framework of the construction phase through achieving collaboration between the design team and the workers at the site.

3D Digital Design Optimization Process Considering Constructability of Freeform Structure (비정형 구조물의 시공성을 고려한 3차원 디지털 설계 최적화 프로세스)

  • Ryu, Han-Guk
    • Korean Journal of Construction Engineering and Management
    • /
    • v.14 no.5
    • /
    • pp.35-43
    • /
    • 2013
  • Nowadays the widely used media in architecture include visualizations, animations and three-dimensional models. 3D digital methods using active CAM(Computer Aided Manufacturing) and CNC(Computerized Numerical Control) imaging have been developed for accurate shape and 3D measurements in freeform buildings. In contrast to a conventional building using auto CAD system and others, the proposed digital optimization method is based on a combination of 3D numerical data and parametric 3D model for design and construction. The objective of this paper is therefore to present digital optimization process for constructability of freeform building. The method can be useful in the effective implementation of an error-proofing process of freeform building during design and construction phase. 3D digital coordinate data can be used effectively to identify correct size of structural and finish members and installation location of each members in construction field. In addition, architects, engineers and contractors can evaluate design, materials, constructability and identify error-proofing opportunities. Other project participants can also include representatives from all levels of management, departments as well as workers and key subcontractors' personnel, if necessary. The 3D digital optimization process is therefore appropriate to serious variations in freeform shape. For future study, the developed digital optimization method is necessary to be carried out to verify the robustness and accuracy for constructability in construction field.

Dashboard Design for Evidence-based Policymaking of Sejong City Government (세종시 데이터 증거기반 정책수립을 위한 대시보드 디자인에 관한 연구)

  • Park, Jin-A;An, Se-Yun
    • The Journal of the Korea Contents Association
    • /
    • v.19 no.12
    • /
    • pp.173-183
    • /
    • 2019
  • Sejong, Korea's special multifunctional administrative city, was created as a national project to relocated government ministries, the aim being to pursue more balanced regional economic development and boost national competitiveness. During the second phase development will focus on mitigating the challenges raised due to the increasing population and urbanization development. All of infrastructure, apartments, houses, private buildings, commercial structures, public buildings, citizens are producing more and more complex data. To face these challenges, Sejong city governments and policy maker recognizes the opportunity to ensure more enriched lives for citizen with data-driven city management, and effectively exploring how to use existing data to improve policy services and a more sustainable economic policy to enhance sustainable city management. As a city government is a complex decision making system, the analysis of astounding increase in city dada is valuable to gain insight in the affecting traffic flow. To support the requirement specification and management of government policy making, the graphic representation of information and data should be provide a different approach in the intuitive way. With in context, this paper outlines the design of interactive, web-based dashboard which provides data visualization regarding better policy making and risk management.

A Study on Development of BIM-based Asset Management Model for Maintenance of the Bridge (교량의 유지관리를 위한 BIM기반 자산관리 모델 개발에 관한 연구)

  • Kang, Jong-Min;Lee, Dong-Youl;Park, Jong-Bum;Lee, Min-Jae
    • Korean Journal of Construction Engineering and Management
    • /
    • v.13 no.5
    • /
    • pp.3-11
    • /
    • 2012
  • The most of domestic bridge has an used life under 30 years, Future maintenance budgets can be expected to increase. However, because of bridge maintenance budgets are limited, demand for asset management being performed to achieve required performance within available budget is increasing. To perform effective asset management of bridges should be made the best use of information to occur in all phase of construction project. Therefore, the development of system and DB is required to support asset management by effective information management. The objective of this study is the development of the BIM-based bridge asset management model. Through previous research survey, BIM capabilities and asset management components were established and mutual linkages were examined. Bridge asset management model was composed of alternate assessment model. In addition, BIM-based asset management model was performed case studies to verify feasibility and applicability. The proposed model can be applied to a current bridge maintenance procedures and supported to perform effective bridge maintenance tasks within a limited budget.