• Title/Summary/Keyword: Project Performance Evaluation

Search Result 618, Processing Time 0.031 seconds

Performance Analysis Framework for Post-Evaluation of Construction Projects through Benchmarking from Advanced Countries (선진국 사례 벤치마킹을 통한 건설공사 사후평가 성과분석 체계 개발)

  • Lee, Kang-Wook
    • Journal of the Korean Society of Industry Convergence
    • /
    • v.25 no.6_2
    • /
    • pp.1017-1027
    • /
    • 2022
  • Development of social overhead capital (SOC) requires huge national finance, and performance issues such as cost-efficiency, safety, and environment have been constantly raised. However, currently each construction client has limited access to its own projects' performance without analytic methodology for industry-level comparisons and benchmarking for improvement. To overcome this problem, this study proposes a comprehensive performance analysis framework for post-evaluation of large-scale construction projects. To this end, this study performed a case study of advanced countries (the U.S., the U.K. and Japan) and consultation with related experts to develop a tailored performance analysis framework for the Post- Construction Evaluation and Management system in Korea. The developed framework covers three categories (project performance, project efficiency, and ripple effect), nine areas (cost, schedule, change, safety, quality, demand, benefit-cost ratio, civil complaint, and defect), and 31 detailed metrics. Using industry-level project performance database and statistical techniques, the proposed framework can be used not only to diagnose excellent and unsatisfactory performance areas for completed construction projects, but also to provide reference data for future similar projects. This study can contribute to the improvement of clients' performance management practices and effectiveness of construction projects.

A Study on the Project Evaluation Indicators for the Efficient Integrated Rural Development in Block Grants System (포괄보조금제도하에서 효율적인 농어촌지역개발을 위한 사업평가지표 연구)

  • Lee, Joo-Yong;Kim, Sun-Joo
    • Journal of The Korean Society of Agricultural Engineers
    • /
    • v.53 no.1
    • /
    • pp.57-62
    • /
    • 2011
  • Block Grants System to the agriculture sector has been started from 2010. This paper has been studied for the effective Integrated Rural Development under Block Grants System. For this, project evaluation items and indicators (PEI) were studied by internal and external example and specialist questionnaire on project evaluation. As the result of study, necessity of project, faith of project, efficiency of project, utilization of resources and operating capability were established in planning step, and most important PEI was established the necessity of project. And in enforcement step, performance result, monitering, capability, achievement and maintenance were established, and most important PEI was established performance results. Finally, monitering, capability, achievement and maintenance were established in completion step.

Analyzing Planning Performance of Road Construction Projects Using Preliminary Feasibility Analysis Data (예비타당성조사 결과를 활용한 도로건설사업의 계획단계 성과 분석 연구)

  • Mun, Junbu;Yun, Sungmin
    • Korean Journal of Construction Engineering and Management
    • /
    • v.24 no.1
    • /
    • pp.3-11
    • /
    • 2023
  • According to the post evaluation scheme in Korea of a public construction project which is more than 30 Billion KRW, project performance is evaluated by investigating outcomes and effects of the construction after the completion of the project. The current post evaluation results can be used for planning and estimating a construction project in the future. However, it is not easy to utilized for an on-going project because the system does not provide the phase-based performance of a project. Although project planning performance is important for project initiation, few attempt has been made to evaluate planning performance in Korea. The purpose of this study is to provide a conceptual performance evaluation of planning performance using preliminary feasibility study conducted by Korea Development Institute. This study developed a planning performance database using data extracted from preliminary feasibility study reports of the completed 354 road construction projects. This study analyzed the performance of the planning stage of road projects by developing absolute metrics such as standard construction cost and standard construction schedule based on a Lane-Km. Using the standard construction cost and schedule metrics, the planning performance was analyzed by project characteristics. The results of this study can be used for phase-based performance evaluation from planning phase to construction phase.

COMPARISON OF THREE PCM PERFORMANCE EVALUATION SYSTEMS IN TAIWAN

  • Wen-der Yu ;Yen-ping Hsu
    • International conference on construction engineering and project management
    • /
    • 2005.10a
    • /
    • pp.719-724
    • /
    • 2005
  • It has been debating on the performance evaluation of professional construction management (PCM) services since its introduction to Taiwan's construction industry more than a decade ago. Several evaluation systems were proposed by previous researchers. However, there has no comparison study been conducted for the feasibility, effectiveness, and appropriateness of these systems to the performance management (PM) of practical PCM services. This paper is intended for this end to compare the existing PCM performance evaluation systems in Taiwan. A real world design/build (D/B) building project was selected for case study. The result of case study concludes and compares the pro's and con's of the three systems. At the end, it recommends strategies for selecting the most appropriate PCM performance evaluation for PCM services.

  • PDF

Exploring Long-Term Performance in Design-Build Best-Value Evaluation Criteria

  • Calahorra-Jimenez, Maria;Poore, Tanner
    • International conference on construction engineering and project management
    • /
    • 2022.06a
    • /
    • pp.74-82
    • /
    • 2022
  • Improving long-term performance in highway projects is an imperative goal for public administrations. Project delivery and procurement methods might provide an opportunity to align design and construction processes with this goal. Previous studies have explored whether project delivery methods impact the long-term performance of highway projects. However, these studies did not focus specifically on how core elements within the procurement might relate to long-term performance. Thus, this research aims to fill this gap by exploring to what extent and how long-term evaluation criteria are considered in design-build best-value procurement of highway projects. To this end, content analysis was conducted on 100 projects procured between 2009 and 2019 by 19 DOTs across the U.S. The analysis of 365 evaluation criteria found that (1) roughly 11% of them related to long-term performance. (2) The weight given to these criteria in the overall technical proposal was lower than 30%. (3) Sixty-five percent (65%) of long-term evaluation criteria focused on design while 15% related to materials and technology, respectively. The results of this study are a first steppingstone to initiate a deep exploration of the relationship between procurement practices and actual project performance. Currently, with sustainability and life cycle assessments being top concerns in infrastructure projects, this line of research might be of particular interest to DOTs and highway agencies across the U.S. and worldwide.

  • PDF

A Risk Analysis Model Using VERT for R & D Project Management (R & D 프로젝트의 위험분석모형의 연구)

  • 황홍석
    • Journal of the Korean Operations Research and Management Science Society
    • /
    • v.20 no.1
    • /
    • pp.85-99
    • /
    • 1995
  • Increasingly, risk analysis is becoming important ingredients in achieving the successful implementation and application in the area of the project management. The project management system is designed to manage or control the project resources on a given activity within time, cost and performance so called TPPM (Total Productive Project Management). In this research, a risk analysis model misproposed to identify potential problem areas, quantify the risks, and generated the chice of the action that can be taken to reduce the risk. In addition two analysis models are proposed : 1) risk factor model and 2) network simulation model using VERT (Venture Evaluation and Review Technique ). The objective of the remodels is to estimate the schedule, cost performance risks. These proposed quantitative models for project risk analysis are proving its value for the project managers who need to assess the risk of changes in cost, schedule, or performance. The proposed models will be used in the area of project selection, evaluation and the allocation of project resources.

  • PDF

Project Delivery Systems and Project Performance;An Evaluation Model for Public Construction Projects (공공건설사업의 발주방식 선정 및 성과평가 모델)

  • Yu, Il-Han;Kim, Kyung-Rai
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.41-47
    • /
    • 2007
  • The selection of the reasonable project delivery system (PDS) is crucial for a successful performance of a project, which means to achieve project objectives. Furthermore, the project performance has been tightly related to the selection of PDS appropriate to pertinent project characteristics. In this context, the ministry of finance and economy of Korea launched two new project delivery systems called "Best Value Contract (Design-Bid-Build)" and "Bridging Contract (Design-Build)" in October of 2007 by revising enforcement ordinances of "Act on Contracts to Which the State is a Party". For efficient operation of the new project delivery systems, this paper suggested a PDS selection model which supports decision making of the reasonable PDS for a pertinent project by assessing characteristics of the public construction projects, both quantitatively and qualitatively. In addition, a PDS performance evaluation model was proposed in order to get feedback on the result of the PDS selection and the operation for the succeeding project. The standard models suggested in this paper might be used as a tool to support the decision making of the public organizations.

  • PDF

The Effect on Task Performance Ability of Project Method to Develop Solar Tracking Control System in Specialized High School (특성화고의 태양광 추적 제어 시스템 개발 프로젝트법이 학습자의 과제 수행 능력에 미치는 효과)

  • Han, Yu-Jin;Kim, Bang-Hee;Kim, Jinsoo
    • Journal of Engineering Education Research
    • /
    • v.17 no.1
    • /
    • pp.3-11
    • /
    • 2014
  • The purpose of this study was to verity the effect of project method on the task performance ability in development of a solar-tracking-control-system of specialized high school. In order to carry out this study, 2 classes of technical high school in Jeonbuk are chosen as experimental and control groups. The experimental group was taught by project method and the control group was taught by traditional instruction. Project method was designed by 4 stages-selection of goal, planning, implementation and evaluation. According to these stages, experimental group's students carried out the project that developing solar tracking control system in solar generation. The results of this study are as follows; the project method was more effective than the traditional instruction in planning ability for task performance and implementation ability, subordinates of task performance ability. However, information gathering ability and evaluation ability on task performance, others in subordinates, it is not clear that the project method is more effective.

Development of Performance Evaluation Method for Urban Regeneration Project based on Spatial Big Data (공간 빅데이터 기반의 도시재생사업 성과 평가기법 개발)

  • Yun Byung-Hun;Seong Soon-A;Lee Sam-Su
    • Journal of the Korean Regional Science Association
    • /
    • v.39 no.1
    • /
    • pp.21-36
    • /
    • 2023
  • Entering the era of low growth due to changes in social and economic conditions, most cities across the country are actively promoting urban regeneration. Although urban regeneration is a project with huge national finances, a clear evaluation system has not yet been established. In order to ensure the sustainability of urban regeneration, it is necessary to secure the validity of urban regeneration policies and establish a reflux system to supplement the policies. The purpose of this study is to derive the limitations of the existing comprehensive performance evaluation and to develop an improved urban regeneration policy comprehensive performance evaluation technique based on spatial big data. The urban regeneration comprehensive performance evaluation technique differentiated the areas affected by the urban regeneration project and the surrounding areas based on the type of urban regeneration project and the presence or absence of large cities and middle cities. The effects of urban regeneration were quantitatively verified through relative comparison between the areas affected by urban regeneration projects and the surrounding areas of population, society, economy, industry, physical and environmental evaluation indicators.

Study on Performance Evaluation of Academic Information Distribution Project in Scientific Technology Field (과학기술분야 학술정보 유통사업 성과평가에 관한 연구)

  • Kwak, Seung-Jin;Kim, Jeong-Taek;Park, Yong-Jae
    • Journal of Korean Library and Information Science Society
    • /
    • v.38 no.4
    • /
    • pp.441-462
    • /
    • 2007
  • As country try expand R&D investment and enhance its efficiency to improve the national competitiveness, research is needed to conduct qualitative enhancement and derive progressive future strategy in relation to the academic information distribution project in scientific technology field. In this study, BSC-based performance indicators were applied to an institute that is the representative of domestic academic information distribution institutes in the field of scientific technology to evaluate project performance, and then to analyze portfolio of using such evaluation results. As for the items of evaluation for the performance indicators of academic information distribution project in the scientific technology field, 12 items that includes information resource quality, information service quality, user satisfaction and economically useful value of academic information from four(4) viewpoints such as information resource, information service, user and economic viewpoints. In the portfolio analysis, it was conducted by performance indicators and by elements of the individual performance indicators as well. Based on the results of performance evaluation and portfolio analysis, the improvement method by viewpoints on academic information distribution project of an institute was suggested.

  • PDF