• Title/Summary/Keyword: Project Owner

Search Result 284, Processing Time 0.032 seconds

Case study of Civil Engineering BIM Projects: Perspective of Korean Public Owners (토목분야 BIM 적용 사례 분석을 통한 발주자 관점에서의 BIM 발전 전략)

  • Kim, Changyoon;Moon, Hyoun-Seok;Nah, Heu-Suk;Kim, Jin-Uk
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.15 no.12
    • /
    • pp.7430-7437
    • /
    • 2014
  • Owing to the increase in large and complex construction projects, the design paradigm of architecture and civil engineering projects has changed from 2D CAD to 3D CAD. For this reason, to meet the strong requirements of project contractors, various efforts have been made to adopt a Building Information Modeling (BIM) technology for effective construction management. On the other hand, compared to architectural projects, only a few civil engineering project cases have been conducted in the perspective of public contractors. This is because the characteristics of civil project contractors and the negative pursuit of adopting BIM technology due to the lack of a current BIM system and technologies. Recently, positive changes in adopting BIM technology for public projects were anticipated by public owners, such as the Public Procurement Service and the Ministry of Land, Infrastructure and Transport. In this regard, this study analyzed the current BIM technology status of public owners in Korea to adopt the BIM policies and guidelines of the Korean government. Strategies for adopting BIM technologies for Korean public owners are also discussed based on an analysis of civil engineering BIM project cases.

The Big Data Analytics Regarding the Cadastral Resurvey News Articles

  • Joo, Yong-Jin;Kim, Duck-Ho
    • Journal of the Korean Society of Surveying, Geodesy, Photogrammetry and Cartography
    • /
    • v.32 no.6
    • /
    • pp.651-659
    • /
    • 2014
  • With the popularization of big data environment, big data have been highlighted as a key information strategy to establish national spatial data infrastructure for a scientific land policy and the extension of the creative economy. Especially interesting from our point of view is the cadastral information is a core national information source that forms the basis of spatial information that leads to people's daily life including the production and consumption of information related to real estate. The purpose of our paper is to suggest the scheme of big data analytics with respect to the articles of cadastral resurvey project in order to approach cadastral information in terms of spatial data integration. As specific research method, the TM (Text Mining) package from R was used to read various formats of news reports as texts, and nouns were extracted by using the KoNLP package. That is, we searched the main keywords regarding cadastral resurvey, performing extraction of compound noun and data mining analysis. And visualization of the results was presented. In addition, new reports related to cadastral resurvey between 2012 and 2014 were searched in newspapers, and nouns were extracted from the searched data for the data mining analysis of cadastral information. Furthermore, the approval rating, reliability, and improvement of rules were presented through correlation analyses among the extracted compound nouns. As a result of the correlation analysis among the most frequently used ones of the extracted nouns, five groups of data consisting of 133 keywords were generated. The most frequently appeared words were "cadastral resurvey," "civil complaint," "dispute," "cadastral survey," "lawsuit," "settlement," "mediation," "discrepant land," and "parcel." In Conclusions, the cadastral resurvey performed in some local governments has been proceeding smoothly as positive results. On the other hands, disputes from owner of land have been provoking a stream of complaints from parcel surveying for the cadastral resurvey. Through such keyword analysis, various public opinion and the types of civil complaints related to the cadastral resurvey project can be identified to prevent them through pre-emptive responses for direct call centre on the cadastral surveying, Electronic civil service and customer counseling, and high quality services about cadastral information can be provided. This study, therefore, provides a stepping stones for developing an account of big data analytics which is able to comprehensively examine and visualize a variety of news report and opinions in cadastral resurvey project promotion. Henceforth, this will contribute to establish the foundation for a framework of the information utilization, enabling scientific decision making with speediness and correctness.

Major Risk Factors to Implement CM at Risk Pilot Project on the Public Sector (시공책임형 CM 발주방식 공공부문 시범사업 사례를 통한 리스크 도출)

  • Han, Jonghoon;Kim, Kyungtae;Ahn, Yonghan
    • Korean Journal of Construction Engineering and Management
    • /
    • v.19 no.3
    • /
    • pp.61-69
    • /
    • 2018
  • The buildings are getting enormous and more complex as well as the requirement of the owner which wants diverse and efficient. Moreover advanced management is necessary for construction services and a new method of delivering project is now required. In order to expand the delivering method and the construction industry, we have to introduced the CM at Risk method. However, despite the fact that six years have passed already the CM at Risk regulation was introduced, the contract amount in significantly lower than that of the CM for fee, and also there is no CM at Risk project in the public sector. As a result, three pilot projects are currently underway for the LH(Korea Land & Housing Corporation) in order to set up a CM at Risk for the public sector. However, detailed regulations related to CM at Risk have not yet been implemented in Korea. Therefore, in this study, I am trying to understand the risks that could incur when practitioners participate in the three pilot projects that are currently underway and employed in the public sector wherein the CM at Risk is normally introduced. Based on the results of this study, It will be able to utilize as a basic data for future CM at Risk delivery system improvement and enactment.

Analysis of Causes of Increase in Construction Cost and Minimize Increase of Cost through Performance Evaluation of Public Construction Projects (공공건설사업의 성과평가를 통한 공사비 증가 원인 분석 및 증가 최소화 방안)

  • Moon, Hyunseok;Ryoo, Geunho;Hong, Hyunki
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.44 no.4
    • /
    • pp.567-575
    • /
    • 2024
  • The government and local governments are utilizing regulations, policies, and various project management techniques at each project stage to effectively and systematically manage public construction projects. However, the increase in construction costs continues to occur. In order to solve these problems, this study attempted to collect cases of existing public construction projects and analyze historical data. And it would like to derive the impact factor of increased construction costs. Based on the results, a plan was proposed to prevent the causes of increase and minimize in construction costs. The main reasons for the increase in costs were the occurrence of civil petition, differences between design documents and site conditions, and changes due to requests from the owner and changes in the business plan. And to solve these problems, this study proposed improvement for each cause from an institutional perspective, along with interview with experts and project owners. The results of this study are significant in improving the process of existing public construction process and presenting key inspection and review items for each major inspection stage in order to solve problem resulting from the analysis of the performance of public construction projects.

Conceptual Cost Estimating System Development for Public Apartment Projects (공공아파트 프로젝트 기획단계 공사비 산정시스템 개발)

  • Lee, Hyun-Soo;Lee, Heung-Keun;Park, Moon-Seo;Kim, Soo-Young;Ahn, Jo-Seph
    • Korean Journal of Construction Engineering and Management
    • /
    • v.13 no.4
    • /
    • pp.152-163
    • /
    • 2012
  • At the conceptual phase of a construction project, estimated construction cost is very important as it significantly influences the owner's decision-making. Accurate cost estimating, in the early stage of a public construction project, serves as a critical factor because initial decision-making effects the final cost of a construction project. However in the cases of Korean public apartment projects, excluding a few of the public owners, there is a problem in properly estimating construction cost due to the lack of construction cost estimating system. Thus, this research developed a public apartment cost estimating system using case-based reasoning that was suggested by a previous research with 66 cases of Korean public apartment projects. Based on the system experiments involving 19 public officers and 10 cases of Korean public apartment projects, the effectiveness of the system in terms of estimation accuracy and user-friendly was confirmed. As a result, the developed system has an error range of 1.47% to 13.74% and mean of 6.15%. In addition, the system was evaluated that it could greatly improve the current estimation task of public officers. Consequently, the results of this research can be used as a foundation for a technological advance in estimating construction cost and improving the accuracy and consistency of construction cost estimation.

Survey of User's Satisfaction Level with the Outdoor Signboards throughout the Signboard Improvement Project (대전지역 간판 개선 사업을 통한 옥외 간판 만족도 조사)

  • Seo, Yong-Mo;Kim, Kyung-Hun;Oh, Chi-Gyu;Kim, Hyung-Jun
    • The Journal of the Korea Contents Association
    • /
    • v.11 no.6
    • /
    • pp.215-227
    • /
    • 2011
  • Recently, City has contributed to the various and convenient environment by public design projects. These projects have grown very attentive to the outdoor signboards in cities. From this background, the local governments including the central government have driven to the outdoor signboards through the city street scenery improvement projects. These the outdoor signboards improvement projects are strengthen the city's aesthetic function and city street scenery. In this research, we surveyed the satisfaction level of the outdoor signboards for shop which were engaged in this project and citizen by t-test method. We surveyed 30 stores and 41 citizen for the outdoor signboard's aesthetic function, a reflection of region and store's properties and communication effects. From our results, we researched the various understanding and satisfaction of the outdoor signboards improvement projects. Stores owner and citizens did not satisfy the outdoor signboards improvement projects. From our research, in order to advertise the city's aesthetic function and to create our own unique outdoor signboards culture, a variety of tools and intensive cases are demanded, in the future the research on the outdoor signboards improvement projects must revitalized.

Operation Model of On-site Environmental Management Council to Enhance Eco-friendliness in Public Construction Sites (공공 건설현장의 친환경성 제고를 위한 현장환경관리협의회 운영 모델)

  • Sohn, Jeong-Rak;Park, Seong-Sik;Jun, Myoung-Hoon;Song, Sang-Hoon
    • Land and Housing Review
    • /
    • v.3 no.4
    • /
    • pp.423-431
    • /
    • 2012
  • The trends of Green growth and environmentally-friendliness came to be the key development indicator for sustaining global environment for the future. Korean government reflected these trends in the main flows of the national development index. Korean construction industry is concentrating investment on fields related to these trends such as technologies for carbon dioxide deduction, materials or products for environmentally-friendly building and alternative energy development, as well. However, efforts to follow these trends during the construction process as a step for production phrase are not being considered enough. In this study, we analysed current status and points to be improved of on-site environment management by surveying major project owners and representatives of the environmental affairs in the leading companies of those fields. Also, we suggested organizational structure and operation model as a solution for enhancing environmentally-friendliness for systematic approach to manage on-site environment in public construction sites. In addition to these solutions, further approaches such as shifting paradigm of project owners and contractors, securing workforce and practical budget for efficient management activities, developing environmental management manuals, setting standards for evaluation of activities are needed for the stable settlement of on-site environmental management.

A Study on the Application Plan of the Cadastral Resurvey in South Korea Through a Case Analysis of the Japanese Private-Public Boundary (일본 관민경계 사례분석을 통한 우리나라 지적재조사 적용방안에 관한 연구)

  • KIM, Jae-Myeong;LEE, Dong-Hwa
    • Journal of the Korean Association of Geographic Information Studies
    • /
    • v.22 no.1
    • /
    • pp.39-50
    • /
    • 2019
  • Since the "Special Law on Cadastral Resurvey" was enforced in 2012, the Cadastral Resurvey Project in South Korea has been promoted in earnest. However, it has been difficult to obtain the following items: a budget for the project, the establishment of land boundaries by increasing/decreasing the area of the parcels of land in the downtown area, the calculation of the adjustment fee, and the analysis of the relationship between the business owner and the landowner in regards to conflicts of opinion. The analysis of Japan's private-public boundary system, which is promoting the Cadastral Resurvey ahead of South Korea, should not attempt to determine complex interests, especially when they are pursuing consensus of the boundary setting portion of the Cadastral Resurvey Project. Therefore, this study shows that there is a need to reduce the number of stakeholders and promote them by using a step-by-step process. The introduction of cost-saving measures for the Cadastral Resurvey through a private-public boundary preliminary investigation is needed. This study suggested the following: link the precision road map construction business using MMS, introduce the preliminary research projects for the Cadastral Resurvey, and gather the important land survey information for the private-public boundary basic survey. In order to establish the utilization base, the researcher proposed linking the downtown area regeneration with the downtown area planning business.

Development of Risk Evaluation Checklist for In-Situ Production of Precast Concrete Members (기성콘크리트 부재의 현장생산 리스크 평가를 위한 체크리스트 개발)

  • Lim, Jeeyoung;Jeong, Hee Woong;Kim, Dae Young
    • Journal of the Korea Institute of Building Construction
    • /
    • v.21 no.5
    • /
    • pp.445-457
    • /
    • 2021
  • In previous studies, it was confirmed that through the in-situ production of precast concrete members, costs could be reduced by 14.5-39.4% compared to in-plant production. In particular, it was confirmed that the factory owner did not make a contract if it did not earn more than 20% of the production cost. If precast concrete members are produced in-situ under the same conditions, the quality equivalent to that of factory production can be secured. As it is advantageous in terms of cost and quality, precast concrete members must be produced in-situ. However, it is difficult to produce all quantities in-situ due to time and various other constraints. This is because in-situ production is avoided due to anticipated risks during the project management process. However, if the risk factors are analyzed before performing in-situ production of precast concrete members, it will increase the opportunity for in-situ production. Therefore, this study develops a checklist for evaluating the risk of in-situ production of precast concrete members. By applying the checklist to one case site, it was verified that risk factors can be evaluated easily and quickly. As a result, it was analyzed that sites with a high building coverage ratio are classified as high-risk sites because it is difficult to secure usable area for production and storage. The developed checklist efficiently evaluates the risk factors of in-site production, and makes it possible for the operator to determine the risk factors, which can change frequently during project execution, and respond according to the situation.

A Case Study on the Risk Impact and Loss Cost of Temporary Aircraft Runway Construction (임시 활주로 건설공사의 위험영향 및 손실비용 사례분석)

  • Kang, Hyunwook;Lee, Wonbae;Kim, Minjung;Kim, Yongsu
    • Korean Journal of Construction Engineering and Management
    • /
    • v.21 no.1
    • /
    • pp.32-39
    • /
    • 2020
  • The purpose of this study is to derive the risk factors that occurred during the construction of the temporary aircraft runway and to analyse the risk costs and loss costs. For this purpose, actual construction data made during the construction of the aircraft runway were investigated. And the risk factors that occurred during the construction work were derived. So the increased construction costs and loss costs due to risk factors were analyzed. The results of this study are as follows: 1)The number of risk factors that occurred during the construction of the aircraft runway was derived from eight. 2)It was calculated that the total risk cost of 5.2million won, the risk cost of the owner's should be 243 million won and the cost of the contractor should be 277million won. 3)Owner's was up 2.36% from its planned budget and the contractor lost -277million won out of its planned profit of 443million won, resulting in a residual profit of 165million won. The results of the study are used as a reference for estimating risk factors and contingency that should be considered in aircraft runway construction.