건축현장 관리인력의 생산성 영향요인 조사 연구 (Influence Factors Analysis on the Productivity of Management Manpower)

  • 권기덕;김선국;손효원;김선형;이동훈
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2010년도 춘계 학술논문 발표대회 1부
    • /
    • pp.153-157
    • /
    • 2010
  • As the recent economic downturn continues to undermine the profits of construction industry in Korea, it has become ever more pressing to improve productivity of the industry. Since construction site management manpower staffing plan has close bearing on the productivity of construction projects, it is essential to estimate and mobilize adequate number of resources as per conditions and characteristics of each construction site. However, there are no reference approaches in practice to provide baseline for site management manpower staffing plan or estimation of manpower requirement. Therefore, this study aims to examine factors affecting productivity that warrants first and foremost consideration in development of site management manpower staffing plan during the initial phase of building construction project by conducting survey on industry stakehoders with hands-on responsibilities in construction sites and analyzing their responses. Conclusions herein will provide basic inputs for subsequent studies on development of site management manpower staffing plan as per project characteristics.

  • PDF

Optimisation of Infrastructure within the Melbourne Urban plan

  • Koorosh Gharehbaghi;Vincent Raso
    • 국제학술발표논문집
    • /
    • The 4th International Conference on Construction Engineering and Project Management Organized by the University of New South Wales
    • /
    • pp.299-303
    • /
    • 2011
  • Congestion is a growing concern of many global cities and the demands on Infrastructure services within a locale coupled by the rising expectations from the growing population places stress on these cities. This entails the ability to build a sustainable community that requires an understanding and recognition of Population growth, changing demographics and the ever changing urban development on both a macro and micro level. Infrastructure is an integral part of Australian economy, particularly the 'Infrastructure Assets Management' which highlights the importance towards the development of sustainable communities for Melbourne's future. Melbourne 2030 is a comprehensive representation of government's response to a wide-ranging population growth within Melbourne metropolitan and surrounding areas. Urban plan and specific Infrastructure Assets Planning needs not only to provide sufficient Infrastructure to a community, but it must also be efficient and innovative so that it produces an optimised management system. A system that incorporates engineering techniques that will be sustainable for decades to come by maintaining an acceptable level of services to its intended community in an effective manner, which also strengthens service delivery. The fundamental challenges for optimization of Infrastructure with the Melbourne urban plan is, the ability to manage and sustain maintenance of Infrastructure to provide the acceptable level of service required by the community in a most effective manner which also strengthens service delivery to contribute towards Melbourne 2030. This paper particularly investigates some of the fundamental issues within the Melbourne urban plan such as Infrastructure Asset Management, AusLink and the Australian Road Management Act 2004, which the Governments at all levels must deal with to provide an economically viable solution to the changing Infrastructure so it may suits the needs and services the strategies of a metropolis.

  • PDF

프로젝트 툴을 이용한 일정 계획의 수립 및 활용 방안 (On Study of Setting up Plan and Utilization of Project with Project Tool)

  • 김길준
    • 디지털콘텐츠학회 논문지
    • /
    • 제5권2호
    • /
    • pp.106-113
    • /
    • 2004
  • Project 계획은 현재의 상황을 어떤 미래의 상향으로 변경하는 것으로 목표가 설정되면, 이 목표를 달성하기 위하여 필요한 조치를 강구해야 한다. 과거에는 수작업의 형태로 일정계획을 수립 및 변경 해 왔으나, 본 논문에서는 Microsoft Office System의 tool를 사용하여 체계적이고 합리적인 계획을 수립함으로서 Project 자료를 분석하고 보관/관리 할 수 있음을 보이고 있다. 또한 Project 자료를 Excel 자료로 변환해서 액셀의 기능을 이용하여 Project 자료를 분석하고 또한 Project의 자료를 xml자료로 변경할 수 있어, xml 데이터베이스를 구축할 수 있어서, 효율적인 자료관리 및 활용이 가능하며 향후 Project 구축의 자동화와 더불어 Excel자료화, XML자료화로 보다더 효율적인 프로젝트 관리가 가능할 것이다.

  • PDF

통합정보시스템 구축 프로젝트 성공 요인 분석을 통한 조직 활성화 방안에 대한 연구 (A study on the Plan for Organization Activation use analysis of Success factor Integration Information System)

  • 박종기;강경식
    • 대한안전경영과학회:학술대회논문집
    • /
    • 대한안전경영과학회 2006년도 추계공동학술대회
    • /
    • pp.367-372
    • /
    • 2006
  • Since 1990's, many enterprises have constructed Integration Information System. Especially, they want to become an advanced company use ERP package. Already, ERP system come to high level which is stabilized and support independent business process of many industry sectors. Therefore, important success factors for ERP project are change management and organization activation. Although most companies had previous good plans, but those are not satisfied. Because of failed to change management and discontinued next activity for promotion. This paper studied success factors of project team and plan for organization activation. Also, it proposed next study subject about investigate the role of the member of task force team as a factor that makes the ERP system a success. The results of this study can be used for a successful construction of the ERP system as a solution about internal problems of Project team.

  • PDF

통합정보시스템 구축 프로젝트 성공 요인 분석을 통한 조직 활성화 방안에 대한 연구 (A study on the Plan for Organization Activation use analysis of Success factor Integration Information System)

  • 박종기;강경식
    • 대한안전경영과학회지
    • /
    • 제8권5호
    • /
    • pp.231-242
    • /
    • 2006
  • Since 1990's, many enterprises have constructed Integration Information System. Especially, they want to become an advanced company use ERP package. Already, ERP system come to high level which is stabilized and support independent business process of many industry sectors. Therefore, important success factors for ERP project are change management and organization activation. Although most companies had previous good plans, but those are not satisfied. Because of failed to change management and discontinued next activity for promotion. This paper studied success factors of project team and plan for organization activation. Also, it proposed next study subject about investigate the role of the member of task force team as a factor that makes the ERP system a success. The results of this study can be used for a successful construction of the ERP system as a solution about Internal problems of Project team.

건설사업관리기술자가 알아야 할 안전키워드에 관한 연구 (A study on Safety Keywords that Construction Project Managers Should Know)

  • 김상원;최유진;홍성욱;안태한
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2017년도 춘계 학술논문 발표대회
    • /
    • pp.95-96
    • /
    • 2017
  • A total of eleven keywords for construction project management engineers to know about safety are as follows. Before the construction, there are two keywords as the safety organization plan and safety management plan, safety compliance, document beach, safety check, safety management fee, hazardous risk prevention plan, safety education, safety accident, seven keywords, There are two keywords of safety inspection comprehensive report, safety management document. It is necessary to understand the keywords well in accordance with the relevant time and to do the best in safety work, and it should be recognized that safety inspection is carried out every month and the safety work should be done faithfully.

  • PDF

시공단계에 참여하는 전문건설업체를 위한 시공 BIM 수행계획 구축 - 철근콘크리트 업체를 중심으로 - (A Study about BIM Execution Plan for Specialty Contractors at Construction Phase - focused on Specialty Contractors in Reinforced Concrete Works -)

  • 이주성;함남혁;김재준
    • 한국BIM학회 논문집
    • /
    • 제5권3호
    • /
    • pp.19-32
    • /
    • 2015
  • For decades, the productivity issue has been a primary concern for the all stake-holders who participate in domestic construction industry. Especially, between a whole life cycle of building, the construction phase's productivity problem makes or break the entire project. In this respect, the general construction company, who accept the order and construct the building(so called General Contractor), should consider various strategies, such as schedule management, cost management, quality management, inner-crew management, etc., for the productivity improvement., and almost of these management methods have been studied for a long time. But, the researches and studies about the specialty contractor, who construct the building directly in construction site were not sufficiently complete yet. This research begins as an idea which tries to apply the BIM(Building Information Modeling) into the tasks of Specialty contractors for their productivity improvement. And for the effective application of construction BIM to specialty contractors, establish of the BIM project execution plan for them, not the fragmentary adoption of BIM. Therefore, in this paper, we develop the BIM project execution plan for the reinforced concrete companies who conduct the framework construction which located on CP(Critical Path) Especially, we model the "Construction BIM Use List for the RC Work", "BIM Application Master Process" and "BIM Application Detailed Process", and general contractor who use these BIM uses list and process models can manage various specialty contractors about schedule, cost, earned value, quality, safety and environment management systematically.

A CASE STUDY OF CONSTRUCTION ENGINEERING FOR CABLE SUPPORTED BRIDGE BY COLLABORATIVE SYSTEM

  • Jung-Min Nam;Sung-Ho Kim;Jae-Hong Kim
    • 국제학술발표논문집
    • /
    • The 4th International Conference on Construction Engineering and Project Management Organized by the University of New South Wales
    • /
    • pp.586-590
    • /
    • 2011
  • This paper presents the case study of the CE by collaborative system and proposes a model of the CM group for the cable supported bridge. The cable supported bridges have a large project scale and need a high level of construction method. Therefore an advanced construction management system is required for successful completion of project. The construction management (CM) group which control design management, construction plan, subcontract, technical support and R&D is organized for the cable supported bridge project. The CM group established a collaborative system with construction site and drew an effective management of cost, process, quality, safety for each project. Furthermore, the CM group established the procedure of construction management based on the construction engineering (CE) items and performed the project management on the construction phase. Efficiency of cost reduction and site control is maximized by using a collaborative system.

  • PDF

The First Global Management Plan for the Urban Landscape Restructure in Tokyo

  • Iglesias, Fernando;Shinji, Isoya
    • Journal of the Korean Institute of Landscape Architecture International Edition
    • /
    • 제1호
    • /
    • pp.176-182
    • /
    • 2001
  • The case for study in this paper is the Main Plan and Management for the Fukutoshin; the restructure of Nishi Shinjuku, This plan was first outlines in 1960, and includes a vast area of 96 ha for redevelopment. It aims to create a totally new center in the city. This was the first case in Japan, and in the world of a plan of these magnitudes. involving urban landscape restructuring from three points: Landscape (open spaces for public use: the Shinjuku Central Park and the surrounding area of the buildings), transport and commercial building developments. The Landscape plan for the green areas was decided in a way to compensate the population of the area and the visitors. As a rule, high-rise building constructions are placed each one in single lots and are surrounded by open spaces and greenery. Pedestrain areas are widened and also connected by bridges in a way to allow free circulation, and interconnection between the constructions and the green areas. Another important factor is the role that Private Corporation, and public interest plays. Joining these two forces has allowed the concretization of this project. This interpolation between public and private roles was an innovation in Japan, and it also the key for the concretion of the project. The historical review of the process and management of this project help us to put into perspective the introduction of new concepts and ideas, which were not related at that time to traditional Japanese Landscaping. Furthermore we are better able to understand the substantial increase in the percentage of land dedicated to green areas in contrast to the typical standards of Japanese cities.

  • PDF

Action to Improve the Reliability of Production Planning

  • Kim Daeyoung
    • 한국건설관리학회논문집
    • /
    • 제3권4호
    • /
    • pp.139-144
    • /
    • 2002
  • Management of today's dynamic projects requires a shift of focus from product to process. The purpose of traditional project controls is to conform performance to plan. The purpose of lean project controls is to make the best possible choices at each point in time during the course of the project, as well as contributing knowledge to the parent organizations so they can learn from project experience. The Lean Construction Institute(LCI) proposed the Last Planner System(LPS) capable of accomplishing that purpose, principally through controlling the quality of planning and of management processes themselves, as distinct from concentrating exclusively on project performance. The case project was a pilot project for the implementation of the Last Planner. Consequently, the coordination of the work on this project was extremely successful. The project had its share of challenges. The coordination did not prevent design problems, or supplier errors, but helped the team deal with the problems effectively while maintaining the work flow. The last planner helped the contractors know: a) who will be doing what and where, b) what each one needs from the others, and c) what are the project priorities. The system itself created a more collaborative environment, because it 'demands' that the subcontractors address these issues.