• Title/Summary/Keyword: Project Management Maturity Model

Search Result 41, Processing Time 0.027 seconds

Design of a Project Management Maturity Evaluation Model using Information System Audit Checklists (정보시스템 감리점검항목을 활용한 프로젝트 조직성숙도 평가 모델의 설계)

  • Kim, Yun-Seok;Cho, Eun-Ae;Baik, Doo-Kwon
    • Journal of KIISE:Software and Applications
    • /
    • v.35 no.2
    • /
    • pp.105-117
    • /
    • 2008
  • Generally, project audit provides the service which accomplishes a project successfully by checking the management activity of information system project, indicating a controversial point and reflecting the improvement issues based on project audit check list. In addition, the projects are managed by using the project management maturity model based on process. However, the effect is not big as we except projects performance of real world. In this paper. to solve these problems, the project management maturity evaluation model which is connected with project audit check list and organizational maturity model survey items is designed. Thus, we propose the model which can improve the project performance through the project evaluation of customer's project and development part and the evaluation of organization level as we design that it is possible to not only audit the project but also evaluate it before and after the project.

Construction Based Model for Assessing Maturity Level of Enterprises

  • Marzouk, Mohamed;Attia, Tarek;El-Bendary, Nasr Eldin
    • Journal of Construction Engineering and Project Management
    • /
    • v.2 no.1
    • /
    • pp.14-19
    • /
    • 2012
  • Maturity models allow organizations to assess and compare their own practices against best practices or those employed by competitors, with the intention to map out a structured path to improvement. This research explores the aspects of the Maturity Models that are relevant to distinguish them from one to another. The different Project Management maturity models for define maturity differently and measure different things to determine maturity. Because of this, organizations should give careful consideration to select appropriate maturity model. The main reason behind this research lies on the modification to the existing Organizational Project Management Maturity Model (OPM3) by adding four knowledge areas, dedicated to construction industry as best practices. These are Safety, Environment, Financial and Claim Management. This Model contains (Yes/No) questions; all of these questions must be answered before the user reviews the results that describe the overall maturity and areas of strength and weakness of an organization. The research presents the implementation of the proposed Model Construction Enterprises Maturity Model (CEM2). All the components of the developed Model have been implemented in Microsoft Access. CEM2 helps Construction Enterprises to assess their Maturity Level and know Areas of Weaknesses for future improvement. The easy to use Yes/No user interfaces help enterprises' employees to assess the maturity level of their enterprises. The Model maintains users' responses in its database; as such, many employees from different enterprise divisions can be involved during assessment phase in several sessions.

A Prefect Management Model for Developing Information Systems in Public Sector with UML (UML기반의 공공부문 정보화프로젝트관리모델에 관한 연구)

  • Ong, Sang-Soon;Choi, Jae-Hyun;Park, Jae-Won;Lee, Nam-Yong
    • Journal of Information Technology Services
    • /
    • v.8 no.3
    • /
    • pp.101-109
    • /
    • 2009
  • For half a century, PMM(Project Management Model) continually has been advanced by many researchers and managers. Especially, the model for civil and construct engineering has now high maturity, but the model for IT engineering has not acceptable maturity. PMI(Project Management Institute) provides the knowledge of protect management for general purpose, it is not adequate for IT prefect management without complements. In this paper, we propose IT project management model based the knowledge of PMI using UML. IT project management model provides not only functions for project planning, budgeting, design and Implement, but also the knowledge for managing IT protect efficiently. We use uses case diagrams to describe the details of the model. We expect the model to be used in management of IT project efficiently in public sector.

The Effect of Project Managers' Competences on Performance in Public S/W (공공 S/W 분야에서 프로젝트 관리자의 역량이 성과에 미치는 영향)

  • Oh, Minjeong;Ju, Hyoungjun;Lee, Minho
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.44 no.3
    • /
    • pp.230-239
    • /
    • 2021
  • There is a growing interest in project management knowledge, project management information systems, and process improvement to systematically project execution in public sectors, achieve high performance and value, and increase the effectiveness of the overall industry. In particular, the software industry is a knowledge-intensive industry centered on professional manpower. This study examines the effect of the project managers' competences of regional SW promotion agencies on and project performance and the moderating effect of the level of project management maturity. We collected data using a questionnaire to the project managers of regional SW promotion agencies. In this study, a structural equation model was used to analyze the relationship between project managers' competences and performance. In addition, a multi-group structural equation model was used to analyze the moderating effect according to the high and low project maturity. As a result of the analysis, it was found that only contextual competence among the competences of the project manager had a positive effect on project performance. It was found that technical and behavioral competence did not have a positive effect on management and completion performance. It was found that the moderating effect according to the maturity of business management of local institutions was not significant.

A Reference Model for Audit and Project Management in the Information Technology using the CMM (CMM 기반 정보기술 프로젝트 관리 및 감리 참조 모델에 관한 연구)

  • 김태달
    • Journal of Internet Computing and Services
    • /
    • v.2 no.2
    • /
    • pp.11-22
    • /
    • 2001
  • For the effective and efficient management of the information system development project. the domestic market is also required to manage the project and set up the information system audit items, which are applicable to the actual project using CMM(Capability Maturity Model). With this thesis, we suggest a reference model complimenting the project. by letting a project manager recognize beforehand the present maturity status, within an organization as well as step-by-step management items and audit indicators for the future capability maturity improvement.

  • PDF

Six Sigma Maturity Model for MeasuringEffectiveness of Six Sigma Activities (6시그마의 효과 측정을 위한 성숙도 모형 개발)

  • Cho, Ji Hyun;Jang, Joong Soon
    • Journal of Korean Institute of Industrial Engineers
    • /
    • v.32 no.4
    • /
    • pp.279-290
    • /
    • 2006
  • This paper proposes a model to assess the maturity level of Six Sigma activities. We classify the maturity level into 5 stages: initial, forming, storming, performing and mature stage. To evaluate the maturity level, 10 categories of Six Sigma with 3 factors each are identified: management leadership, belt system, expert training, establishing execution system, compensation, organization, corporate culture, customer focus, project selection, and management of project results. Scoring 277 items in total, the value of each factor is evaluated by weighted average of those items. Maturity level is appraised by rating the sum of scores of 10 categories that are obtained by summing up the values of its 3 factors. Values of weights and criteria of rating maturity levels are determined by analyzing 90 companies and Six Sigma exper's opinion. This study also shows the actual appraisal results of some companies.

National Cultural Dimensions and their Impact on Quality Management Maturity and Project Quality Performance: Focusing on ITER Project (국가의 문화차원이 품질경영 성숙도 수준과 프로젝트 품질에 미치는 영향: ITER 프로젝트를 중심으로)

  • Hyun, Young-Jun;Song, Haegeun;Park, Young-Taek
    • Journal of Korean Society for Quality Management
    • /
    • v.45 no.2
    • /
    • pp.247-260
    • /
    • 2017
  • Purpose: The study is aimed to identify the national cultural dimensions that are affecting the quality management (QM) maturity level and the project quality performance, and analyze their relationships. Methods: This study collected the data of QM Maturity level based on Crosby's QM maturity model and the project quality performance using the Iron Triangle (Quality, Time/Schedule and Cost) from the employees who are participating in the ITER Project across the major 8 countries (China, France, Italy, Japan, Korea, Russia, U.K. and U.S.A.). Three research hypotheses are proposed concerning the national cultural dimensions in this study and Hofstede's five cultural dimensions framework are used for the statistical test. Results: The results are two folds in the study: First, there is a significant positive correlation between the QM maturity level and the project quality performance. Second, three cultural dimensions (Collectivism, Large Power Distance and Strong Uncertainty Avoidance) and five cultural dimensions (Collectivism, Large Power Distance, Strong Uncertainty Avoidance, Feminity and Long Term Orientation) have a positive impact on the QM maturity level and the project quality performance respectively. Conclusion: From the results, the understanding and consideration of the culture difference among the countries participating International Collaboration R&D project are recommended.

Development of evaluation model on PMIS function using CMM - Focused on Project Communication Management - (CMM개념을 활용한 건설 PMIS 평가 모델 개발 - 프로젝트 의사전달관리를 중심으로 -)

  • Park Jeong-Ha;Shin Kyoo-Chul;Lee Jae-Seob
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.460-463
    • /
    • 2002
  • The construction sector is under growing pressure to increase productivity and improve quality, most notably in reports. A major problem for constriction companies is the lack of project assessing model for project management. One method of solving the problem is through the systematic management of construction processes. A development of model for assessing PMIS practice is attempting to develop a stepwise process assessment framework for the construction industry using Capability Maturity Model. This paper have provided further insights into the understanding of the framework, as well as its value for construction sector.

  • PDF

Design of maturity model for software project management level evaluation (소프트웨어 프로젝트의 관리 수준 평가를 위한성숙도 모형 설계)

  • Jeon, Soon-Cheon
    • Journal of Advanced Navigation Technology
    • /
    • v.15 no.4
    • /
    • pp.609-615
    • /
    • 2011
  • In recent public institutions and banks to improve competitiveness in the integration of information systems projects are larger in size and may be the project's ever-growing need appropriate software project management plan. However, between the effect of the project management area for systematic research was scarce. Through this study, previous research in the important area of project management is developed, and "scope, schedule, quality, human resources, risk" of each area of impact analysis and the interaction between the progress of each area, the planning, execution, completion Performance levels were analyzed separately. Affected and Performance Analysis of the results to assess the level of the project management model is presented.

성공적 SCM 시스템 구축에 미치는 영향요인에 관한 연구 - 관계역량 매개와 경쟁강도 조절효과를 중심으로 -

  • Kang, Seong-Bae;Mun, Tae-Su;Jeong, Yun
    • 한국경영정보학회:학술대회논문집
    • /
    • 2008.06a
    • /
    • pp.701-711
    • /
    • 2008
  • SCM(Supply Chain Management) is one of the important issues in internet-based business environment. This study intends to suggest a research model to investigate the influence of environmental, organizational, technical factors on successful SCM system implementation. The purpose of this study is to analyze the influence of the organizational characteristics of SCM adoption on successful implementation of SCM systems, including the moderating effects of competitiveness. 122 companies data were collected by survey. The results of hypothesis testing showed that project management is the most important determinants to influence successful SCM system implementation. In addition to that, top management support, IS maturity have positive influence to successful implementation of SCM systems in direct effect model. Also, the results of hypothesis testing in moderating effect model show that competitiveness has a positive impact to successful implementation of SCM systems.

  • PDF