Critical Evaluation of and Suggestions for a Comprehensive Project Based on the Special Act on Seoul Metropolitan Air Quality Improvement (수도권 대기환경 개선사업-진단과 제언)

  • Baek, Sung-Ok;Koo, Youn-Seo
    • Journal of Korean Society for Atmospheric Environment
    • /
    • v.24 no.1
    • /
    • pp.108-121
    • /
    • 2008
  • On January 1, 2005, the Korean Ministry of Environment put into operation a comprehensive program, so called 'Blue Sky 21' project, for the improvement of air quality in greater Seoul metropolitan area. This program was legally based on the 'Special Act on Metropolitan Air Quality Improvement' for Greater Seoul area, which was established in 2003, and should be updated every 10 years. The principal objective of this program is to improve the air quality in Seoul and surrounding area by 2014 to the levels of air quality in Tokyo and Paris, with particular emphases on reducing the concentrations of nitrogen dioxide and $PM_{10}$. Any regulation of the emission of toxic air pollutants in general, and $NO_2$ and $PM_{10}$ in particular, should be based on human exposure levels and consequential health effects. In this article, the contents and feasibility of the special program were critically evaluated with respect to the reduction of health risks. Important issues for improving not only air quality but public health are discussed, and future requirements for the success of the special program are suggested.

Document Flow for the Research Reactor Project in ANSIM Document Control System (ANSIM 문서관리시스템에서 연구로사업 문서흐름)

  • Park, Kook-Nam;Kim, Kwon-Ho;Kim, Jun-Yeon;Wu, Sang-Ik;Oh, Soo-Youl
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.36 no.4
    • /
    • pp.18-24
    • /
    • 2013
  • A document control system (DCS), ANSIM (KAERI Advanced Nuclear Safety Information Management) was designed for the purpose of documents preparation, review, and approvement for JRTR (Jordan Research and Training Reactor) project. The ANSIM system consists of a document management, document container, project management, organization management, and EPC (Engineering, Procurement and Construction) document folder. The document container folder run after specific contents, a revision history of the design documents and drawings are issued in KAERI. The EPC document work-scope is a registry for incoming documents in ANSIM, the assignment of a manager or charger, document review, preparing and outgoing PM memorandum as attached the reviewed paper. On the other hand, KAERI is aiming another extra network server for the NRR (New Research Reactor) by the end of this year. In conclusion, it is the first, computation system of DCS that provides document form, document number, and approval line. Second, ANSIM increases the productivity of performance that can be recognized the document work-flow of oneself and all participants. Finally, a plenty of experience and knowledge of nuclear technology can be transmitted to next generation for the design, manufacturing, testing, installation, and commissioning. Though this, ANSIM is expected to allow the export of a knowledge and information system as well as a research reactor.

Implementation of Web based Project Management System (웹기반 프로젝트 관리 시스템 개발 및 구현)

  • Kwon, Soon-Do;Lee, Myung-Soo;Cho, Dae-Jea
    • Proceedings of the KAIS Fall Conference
    • /
    • 2010.11a
    • /
    • pp.180-183
    • /
    • 2010
  • 프로젝트 관리란 프로젝트 요구사항을 충족시키는데 필요한 지식, 기량, 도구 및 기법 등을 프로젝트 활동에 적용하는 것을 말하며 현재 사회에서의 프로젝트의 복잡성과 다양성으로 인해 체계적인 관리의 필요성이 제기되고 있다. 본 논문에서는 현재 PMS 시장의 동태에 대해서 알아보고, 사용자 편의성에 기반을 둔 웹기반 Project Management System(이하 PMS)를 설계한다. 본 논문에서 설계한 PMS는 사업수행자용으로, 프로젝트 현황정보에 있어서는 복수 프로젝트를 지원토록 하고 주요기능은 단위 프로젝트용으로 설정하도록 웹기반 일반관리 및 공정관리 시스템의 구조를 설계하고 구현하였다.

  • PDF

A Comparative Review on Problem-& Project-based Learning and Applied Method for Engineering Education (공학교육에서 문제 및 프로젝트기반학습의 비교 고찰과 적용 방안)

  • Kim, Moon-Soo
    • Journal of Engineering Education Research
    • /
    • v.18 no.2
    • /
    • pp.65-76
    • /
    • 2015
  • Despite its ineffectiveness, the dominant pedagogy for engineering education is still "chalk & talk". Meanwhile, student-centered learning models have been highlighted for strong communication, teamwork skills, deep understanding and analysis on social, environmental and economic issues as well as application of their engineering knowledge in practice. Among others, on problem- and project-based learning, this article examines theoretical background and detailed features and a comparison between both learning models including common and different features from the previous theoretical and empirical studies. It reviews some cases of where they have been practiced successfully in engineering, and further, applied strategies for engineering education are suggested.

Policy Evaluation and Improvement Plan of Overseas Construction Engineering Industry (해외 건설엔지니어링산업의 정책평가 및 개선방안)

  • Park, Hwan-Pyo
    • Journal of the Korea Institute of Building Construction
    • /
    • v.18 no.4
    • /
    • pp.375-384
    • /
    • 2018
  • Due to the downturn in the local construction business, entry into the overseas markets has been regarded as one of the core tasks of the building sector and the government. Thus, entry into overseas markets, not only by large and middle-standing enterprises, but also by small and medium sized enterprises, has recently become a major construction policy. Therefore, this study identified and evaluated overseas construction support policies in the field of construction engineering, ranked them as the policies for developing market development funds, fostering and educating expert workers, and supporting the provision of information on winning orders. Through these policy assessment results, the study proposed improvement measures from the government and from the business side. As for the government viewpoint, a measure of providing information suited to engineers in design companies, project manager (PM), construction manager (CM), a measure of producing skillful workers through the expansion of education support policies, and the promotion of specialized overseas workforce in the construction engineering sector were proposed. In the construction engineering industry, this study suggested measures for securing global expert manpower, sharing performance of overseas construction market development project, strengthening construction project management capacity, and strengthening risk management.

Comparative analysis of fugitive dust management system at construction site by major cities

  • Noh, Hyun Jun;Yu, Jung Ho
    • International conference on construction engineering and project management
    • /
    • 2017.10a
    • /
    • pp.297-300
    • /
    • 2017
  • Particulate Matter(PM) is one of the most critical pollutant which can cause a fatal disease if the human body inhales. Construction is the business that emits the most fugitive dust. It is therefore necessary to manage construction site. South korea government focuses on the fugitive dust control measures defined in regulation being implemented properly. However the number of civil complaints related to fugitive dust emitted from construction site is the most in korea. So it is necessary to check from the management system aspect. This paper compares and analyzes the fugitive dust management system which applied to the construction site of major cities in three countries, and finds out what needs to be supplemented by the domestic management system.

  • PDF

Research Trends in Off-Site Construction Management : Review of Literature at the Operation Level (국외 오프사이트 건설 관리 연구 동향 : 작업 단계 수준에서의 문헌 연구)

  • Jang, JunYoung;Chen, Hao;Lee, Chansik;Kim, TaeWan
    • Korean Journal of Construction Engineering and Management
    • /
    • v.20 no.4
    • /
    • pp.114-125
    • /
    • 2019
  • Off-Site Construction (OSC) is a new construction method based on factory production. OSC (Off-Site Construction) is a new construction method based on factory production. Researches such as OSC-related design and production standardization, transport methods are actively conducted in the U.S., UK and other parts of the world as this new method has an edge over existing methods in terms of productivity, economy and quality. As the emergence of this new area requires reasonable management, an analysis of the scope of construction project management is required accordingly. Therefore, this research analyzed the study trends and relationships at the CM/PM range's "Operation level" to identify areas of study, relationship between studies and deficiencies in current research. This study carried out a comprehensive literature review of the OSC (CM/PM) research by analyzing 94 papers in Operation level as of September 3, 2018, and the analysis results are as follows. (1) Working stage level researches have been increasing rapidly since 2006. (2) Non-volumetric type is contributing most significantly at work stage level. In the building sector, it has been identified that problems such as residential: living, quality issues, non-residential: economic difficulties, factory: productivity problems have been addressed. (4) The Non-volumetric pre-assembly type dealt with the economic feasibility of residential and non-residential buildings, whereas the modular type was studied in regards to assembly quality. (5) From 2006, project management areas (e.g., quality, human resources, risks) have been expanded. It is expected that this research will help find new areas of research for OSC. If the analysis is carried out to the level of the industrial, corporate and project phases in the future, it is deemed that the overall research flow and area of the OSC industry can be identified.

A Study on the Physique and Bodily Strength of the Enlisted Men of Marine Corps in Korea (일부 사형의 체격 및 체력에 관한 연구)

  • Shin, Young-Soo
    • Journal of Preventive Medicine and Public Health
    • /
    • v.6 no.1
    • /
    • pp.87-99
    • /
    • 1973
  • The purpose of this project is offering fundamental and proper informations for the better health control and personnel management of the enlisted men of Marine corps in Korea. Survey has been done under 1,001 marine enlisted men for the purpose of understanding their condition of physique, vital capacity, and bodily strength. 1. Under the subject of physique, 7 items, body weight, chest-girth, relative body weight, relative chest-girth, Vervaeck index, and Roehrer index are listed, and under the subject of vital capacity, BTPS vital capacity and percent predicted vital capacity are listed, and under the subject of bodily strength, 7 items, grasping power, chinning-up, throwing a hanp-grenade, forward jumping, sitting-up, 100 meter sprinting, are listed. The total items are 16 and mean score of each one is as follow. 1)Physique : a. Height : $$168{\pm}0.15cm$$ b. Body weight : $$62.7{\pm}0.17kg$$ c. Chest-girth : $$91.4{\pm}0.16cm$$ d. Relative body weight : $$37.2{\pm}0.09$$ e. Relative chest-girth : $$54.3{\pm}0.10$$ f. Vervaeck index : $$91.6{\pm}0.15$$ g. Roehrer index : $$1.31{\pm}0.003$$ 2) Vital capacity : a. BTPS vital capacity : $$4470{\pm}20cc$$ b. % Predicted vital capacity : $$150{\pm}5.1%$$ 3) Bodily strength : a. Grasping power : $$41.4{\pm}0.26kg$$ b. Chinning-up : $$5.7{\pm}0.10$$ c. Throwing a hand-grenade : $$39.7{\pm}0.20m$$ d. Forward jumping : $$214{\pm}0.58cm$$ e. Sitting-up : $$19.1{\pm}0.25$$ f. Pushing-up : $$22.1{\pm}0.18$$ g. 100 meter sprinting : $$16.1{\pm}0.04sec$$. 2. Comparative analysis has been done about the conditional classes of marine enlisted men with the results of above mentioned 16 items. 7 classes according to the branches, 3 according to the ranks, 9 according to tile length of service are adopted respectively.

  • PDF

On the CMMI-Based Development of SE & PM Integration Process Architecture (CMMI 기반 시스템공학과 프로젝트관리 통합 프로세스 아키텍처 개발)

  • CHOI, Young-Gil;Jung, Ho-Jeon;Lee, Jae-Chon
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.16 no.6
    • /
    • pp.4137-4146
    • /
    • 2015
  • The scale and required functionality of modern systems have increased and become more complicated. To successfully carry out the systems development projects, appropriate systems engineering (SE) and project management (PM) activities are required for the underlying process. In a system development organization, it is an effort to secure the SE & PM capability by adopting the CMMI is an evaluation model of improvement and ability of SE&PM process. To achieve the goal each organization establishes and uses its own organizational standard process, which satisfies the business characteristics. However, in practice, due to the lack of sufficient understanding on the interrelationship among different CMMI process areas, there still exist some difficulties with constructing organization processes. In systems development, the activities of SE are closely related with those of PM. Thus, the processes of SE and PM need to be fully integrated and explicitly linked to each other in order to complete the projects successfully. In this paper, we propose a SE&PM integration process architecture of organization that can be utilized in the system development organization is referenced in the construction of CMMI-based organizational process.

A Study on Design Additional Fee Estimation by Change Order - Focused on Design Stage - (설계변경에 따른 설계추가용역비 산정에 관한 연구 - 설계단계 중심으로 -)

  • Park, Won-Ho;Paek, Joon-Hong
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2009.05b
    • /
    • pp.155-158
    • /
    • 2009
  • During the construction project period, a lot of change orders happen in the design and construction stage Especially, The change order during construction stage causes the huge construction cost increase and duration delay. Accordingly, research on the change order of the construction stage is being progressed relatively active in the design stage, but the design changes are rarely made. In the design stage, the owner has to pay a design addition cost when change order due to the demands of owner happens. However Korea has not the specific standard about design additional cost in design stage. Therefore, this study analyzes problems of design additional cost estimation methods through the case study, and then indicates the method that the ratio distributes to details dividing design tasks and the method of the PM(Project Management). Eventually, this study expects to minimize claim related the design additional cost in design stage.