• Title/Summary/Keyword: Project Integration Management

Search Result 331, Processing Time 0.023 seconds

INTRODUCTION OF THE G-7 PROJECT: Integrated System of Water Quality Management (G-7 과제에 대한 소개 : 수질관리를 위한 통합 시스템)

  • Kim, Kye-Hyun;Kim, Eui-Hong;Lee, Hong-Keun;Lee, In-Seon;Ryu, Joong-Hi
    • Journal of Korean Society for Geospatial Information Science
    • /
    • v.1 no.2 s.2
    • /
    • pp.143-152
    • /
    • 1993
  • A long-term water quality study has been initiated by the Korean Ministry of Environment(MOE) - The G-7 Project--in cooperation with two national research institutes, an University research tn and a consulting firm. This study includes the development of computer software for total water quality management system, so called ISWQM (Integrated System of Water Quality Management). ISWQM includes four major components: a GIS database; two artificial intelligence (AI) based expert systems to estimate pollutant loadings and to provide cost-effective wastewater treatment system for small and medium size urban areas; and computer programs to integrate the database and expert systems. ISWQM is to provide user-friendly Decision Support System (DSS) for water quality planners. A GIS was used to create spatial database which stores all the necessary data to n DSS. GIS was also used to integrate the four components of ISWQM from data creation to decision making through Graphic User Interface (GUI). The results from the first phase of this study showed that GIS would provide an effective tool to build DSS using expert system.

  • PDF

The Cost Saving Method on Each Building Phase by Analyzing the Cost Structure (비용구조분석에 의한 건축단계별 공사비용 절감방법)

  • Park, Keun-Joon
    • Journal of the Korea Institute of Building Construction
    • /
    • v.5 no.1 s.15
    • /
    • pp.97-103
    • /
    • 2005
  • Building costs means capital costs which include cost of land, costs of acquiring and preparing the site, construction costs, professional fees, furnishings, cost of financing the project. and cost of management required to run and maintenance the building for use. There are several phases that determine the building costs : design phase, construction phase, and operation & maintenance phase. So, the cost of work could be set against the examining the full range of complexities that a building program might contain. To solve this problem, it needs to compute building cost systematically. This is still in the development stage, awaiting the organization of rational cost data base. The method of cost saving by cost control could be constituted by detailed knowledge of building costs for all possible combinations of components and subsystems that can be assembled into integration model of cost factor on each phase of project development. The model of cost saving in each building phase is available for procedures of cost control of building systems.

A Methodology for Ontology-based Knowledge Acquisition and Structuring in an Industry-Academic-Government Project ″Go Japan!″

  • Hideki-Mima;Yoon, Tae-Sung
    • Proceedings of the CALSEC Conference
    • /
    • 2003.09a
    • /
    • pp.197-203
    • /
    • 2003
  • The purpose of the study is to develop an integrated knowledge structuring system for the domain of engineering, in which ontology-based literature mining, knowledge acquisition, knowledge integration, and knowledge retrieval are combined using XML-based tag information and ontology management. The system supports combining different types of databases (papers and patents, technologies and innovations) and retrieving different types of knowledge simultaneously. The main objective of the system is to facilitate knowledge acquisition and knowledge retrieval from documents through an ontology-based dynamic similarity calculation and a visualization of automatically structured knowledge. Through experimentations we conducted using 100,000 words economic documents reported in the "Go! Japan" project for analyzing Japanese industrial situation, and 100,000 words molecular biology Papers, we show the system is Practical enough for accelerating knowledge acquisition and knowledge discovery from the information sea.

  • PDF

A Study of the Integrated Cost Audit Model for the efficiency of IT project risk management with risk analyzing and using the function point in the IT project risk (사업위험 분석과 기능점수를 통한 사업원가 산정 및 정보시스템 감리점검모델 연구)

  • Yoon, Seong-Jeong;Han, Ki-Jun;Kim, Dong-Su
    • 한국IT서비스학회:학술대회논문집
    • /
    • 2009.11a
    • /
    • pp.176-180
    • /
    • 2009
  • 현재 우리나라 SI(Service Integration)에서 사업발주자 및 수행자는 소프트웨어사업 대가산정에 많은 어려움을 겪고 있다. 사업발주자는 관례적인 사업비 산정으로 일관하고, 사업수행자는 근거없이 받아들이는 것이 현실이다. 또한 감리 수행 시 사업비산정근거를 점검할 체계를 갖추지 못하고 있다. 이로 인해, 비용관리 위험 및 파생위험들을 초래할 수 있다. 이에, 사업비 산정과 위험에 대한 구체적인 인식과 연구가 필요하다.

  • PDF

A Critical Study of Local Cultural Policy by Village Mural (마을벽화로 본 지역문화정책 비판적 고찰)

  • Jeong, Yoonsoo
    • 지역과문화
    • /
    • v.7 no.3
    • /
    • pp.81-108
    • /
    • 2020
  • This study aims to critically consider the local cultural policies of the government and local governments by village mural. Village murals, which began to be painted in the late 1990s, have been a nationwide cultural phenomenon for decades. In particular, it was consistently used as an important element of various local cultural policies implemented by the government and local governments. The government and local governments have been working on the project for two purposes: 'improving the residential environment' and 'activating tourism' but it has largely focused on 'activating tourism'. This study grasped the concrete status of major village murals across the country through field surveys, one of the case study methods. Also, through the analysis of official documents, the government and local governments operating in the village mural project were analyzed for the policy basis and administrative management plan. As a result of on-site surveys, most of the village murals across the country had problems such as uniform subject matter, low level representation, and poor follow-up management. This is partly based on the experiences and abilities of organizations and artists who participated in the village mural project, but fundamentally, it is due to the projects of the government and local governments that focused on short-term visual tourism rather than long-term improvement of the residential environment. It was confirmed that the projects of the government and local governments were carried out through vertical integration and that there were problems in the actual work, such as requiring specific topics, subject matter, designs and colors. As a result, the village murals 'objectify' the residents and 'romanticized' the place, resulting in a unified visual representation. Therefore, this study suggests that the administration and accounting should be strictly managed, but in actual work, the vertical integration structure should be eased by simplifying various documents and procedures, as well as rich cultural understanding of the target place, selection of various topics, and original subject matter and expressions.

A Study of Introduction of CMMI on Design Process for Improving Collaboration (설계협업 프로세스의 개선을 위한 CMMI 도입 방안에 대한 연구)

  • Jun, Joon-Ki;Yi, June-Seong
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.436-440
    • /
    • 2008
  • Evaluating the work process of the organization is necessary to improve efficiency and make high quality of results. As size of construction projects are bigger, it is also applied to design firm. By applying efficient process, design team can reduce rework and waste. To make systematic process and keep a continuous progress, process evaluation is required. On this study, CMMI(Capability Maturity Model Integration) concept is benchmarked. Originally CMMI is suggested to evaluating capability of work process of Soft Ware developing organization by SEI(Software Engineering Institute). From CMMI system, direction of making evaluating method of design project performing team is drove. After worked out the evaluation method of capability maturity of process in design team, it could contribute making progress in the design process and satisfying client.

  • PDF

Worker Safety in Modular Construction: Investigating Accident Trends, Safety Risk Factors, and Potential Role of Smart Technologies

  • Khan, Muhammad;Mccrary, Evan;Nnaji, Chukwuma;Awolusi, Ibukun
    • International conference on construction engineering and project management
    • /
    • 2022.06a
    • /
    • pp.579-586
    • /
    • 2022
  • Modular building is a fast-growing construction method, mainly due to its ability to drastically reduce the amount of time it takes to construct a building and produce higher-quality buildings at a more consistent rate. However, while modular construction is relatively safer than traditional construction methods, workers are still exposed to hazards that lead to injuries and fatalities, and these hazards could be controlled using emerging smart technologies. Currently, limited information is available at the intersection of modular construction, safety risk, and smart safety technologies. This paper aims to investigate what aspects of modular construction are most dangerous for its workers, highlight specific risks in its processes, and propose ways to utilize smart technologies to mitigate these safety risks. Findings from the archival analysis of accident reports in Occupational Safety and Health Administration (OSHA) Fatality and Catastrophe Investigation Summaries indicate that 114 significant injuries were reported between 2002 and 2021, of which 67 were fatalities. About 72% of fatalities occurred during the installation phase, while 57% were caused by crushing and 85% of crash-related incidents were caused by jack failure/slippage. IoT-enabled wearable sensing devices, computer vision, smart safety harness, and Augment and Virtual Reality were identified as potential solutions for mitigating identified safety risks. The present study contributes to knowledge by identifying important safety trends, critical safety risk factors and proposing practical emerging methods for controlling these risks.

  • PDF

The Basic Study of Integration for Family Welfare Delivery System : Focused on Healthy Family Support Centers and Multicultural Family Support Centers (가족복지전달체계 통합을 위한 기초연구 : 건강가정지원센터와 다문화가족지원센터를 중심으로)

  • Lee, Seong-Mie;Song, Hyerim;Ra, Hui-Mun;Park, Jeong-Yoon
    • Journal of Families and Better Life
    • /
    • v.30 no.5
    • /
    • pp.1-15
    • /
    • 2012
  • The purpose of this study is various discussion and alternatives focusing on integration of center for enhancing family policy delivery system and family support service the long term. The subject is managers who work at Healthy Family Support centers and Multicultural Family Centers. And they are responded non-structural questionnaire. The results were follows: First, 82.4% respondents of healthy support center and 50% respondents were in favor of integration. Second, reason of integration are conformance for social integration, the efficiency of center operations, the adequacy of program for various family, doing program with the goal of both centers of the similarity, complementary, and user convenience, prevent duplication and missing of services and so on, If the amount charged against the project of the center dissimilarity of institutions, including the operating direction was different. Third, the Center for the meaning of integration are name, organization, reorganization or consolidation of functions, was regarded as entrusted to corporate consolidation. Fourth, the consolidation that occurs during problem solving to ensure the succession of budgeting and human resources and program alternative for dressing up, commissioning center was the difference as problem solving.

A Study on Project Information Integrated Management Measures Using Life Cycle Information in Road Construction Projects (도로건설사업의 생애주기별 정보를 이용한 건설사업정보 통합관리방안 연구)

  • Kim, Seong-Jin;Kim, Bum-Soo;Kim, Tae-Hak;Kim, Nam-Gon
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.20 no.11
    • /
    • pp.208-216
    • /
    • 2019
  • Construction projects generate a massive amount of diverse information. It takes at least five years to more than 10 years to complete, so it is important to manage the information on a project's history, including processes and costs. Furthermore, it is necessary to determine if construction projects have been carried out according to the planned goals, and to convert a construction information management system (CALS) into a virtuous cycle. It is easy to ensure integrated information management in private construction projects because constructors can take care of the whole process (from planning to completion), whereas it is difficult for public construction projects because various agencies are involved in the projects. A CALS manages the project information of public road construction, but that information is managed according to CALS subsystems, resulting in disconnected information among the subsystems, and making it impossible to monitor integrated information. Thus, this study proposes integrated information management measures to ensure comprehensive management of the information generated during the construction life cycle. To that end, a CALS is improved by standardizing and integrating the system database, integrating the individually managed user information, and connecting the system with the Dbrain tool, which collectively builds artificial intelligence, to ensure information management based on the project budget.

Land Development Project Area Underground Facility Management A Plan Using GIS (GIS를 활용한 택지개발사업지구 지하시설물 관리방안)

  • 김감래;이재기;임건혁
    • Proceedings of the Korean Society of Surveying, Geodesy, Photogrammetry, and Cartography Conference
    • /
    • 2003.10a
    • /
    • pp.329-334
    • /
    • 2003
  • The aim of this study is propriety review for underground facility surveying on development area of land for housing and efficient management. Because of integration information administration system construction of the nation and development of information technology, construction of Urban information system(UIS) to manage systematically city space is increasingly necessary We manage systematically attribute information for each lot in the development area of land lot housing that it Is connected with NGIS in order to drive gradual computerization of underground facilities and arrange the base of facility management. Review arrangement methods on development area of land for housing makes it to check safety accident of urban and to leading base of urban information. Thus, this study draw the most suitable way through analysis of driving methods and expectation effect from above facts.

  • PDF