• Title/Summary/Keyword: Project Integration Management

Search Result 331, Processing Time 0.03 seconds

Intelligent Information Technologies for Integrated Management Systems of Enterprises with A Complex Scheme of Gas-Extraction and Processing

  • Matvienko, Evgeny V.;Adilov, F.T.;Ivanyan, A.I.
    • Journal of Multimedia Information System
    • /
    • v.2 no.3
    • /
    • pp.249-254
    • /
    • 2015
  • This article considers the development of an integrated control and safety management system (ICSS) and its interfaces with an automated enterprise management system (AEMS) in light of the establishment of industrial enterprises with intelligent model of centralized management on the example of Kandym GPP.

Applying Workflow Management System to CPC (CPC에서의 Workflow 응용)

  • 전희철
    • CDE review
    • /
    • v.8 no.1
    • /
    • pp.58-65
    • /
    • 2002
  • Collaborative product commerce(CPC) involves many people working together with heterogeneous and distributed software applications. For such an environment, Workflow Management System(WFMS) can be useful for coordination of people, software agents and processes. It provides diverse services including automatic work muting, project management continuous process improvement and application integration. However, there are some limitations to apply WFMS to CPC environment due to inflexibility and lack of design support facilities. This paper identifies the problems and addresses possible approaches to overcome the difficulties.

  • PDF

Earned Value based Construction Project Control System (Earned Value 기반 프로젝트 관리체계 및 사례연구)

  • Lee Yoo-Seob;Cho Chang-Yon;Oh Kyu-Hoan;Kim Jung-Hun
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.123-130
    • /
    • 2002
  • Project plan and control is a highly skilled task which is vital for business success, and Project control systems are important for successful project execution. To support construction process management effectively, an integrated cost and schedule control function is required to collect quality data in a timely manner and to provide quality historical data for future planning of new projects. In Korea construction industry, the development and implementation cases of a project control system which to efficiently support construction project planning and controlling processes, have been increased to ensure a project success and the profitability of a construction company. To contribute to improving practical effectiveness of a project control system, the paper reviewed and analyzed the current trends and functional features of current project control systems. And it also described the pending issues and their solutions faced on previous project control systems.

  • PDF

Earned Value based Construction Project Control System (EV기반 공사관리시스템 기능의 비교분석 연구)

  • Lee Yoo-Seob
    • Korean Journal of Construction Engineering and Management
    • /
    • v.5 no.1 s.17
    • /
    • pp.168-174
    • /
    • 2004
  • Project plan and control is a highly skilled task which is vital for business success, and Project control systems are important for successful project execution. To support construction process management effectively, an integrated cost and schedule control function is required to collect quality data in a timely manner and to provide quality historical data for future planning of new projects. In Korea construction industry, the development and implementation cases of a project control system which to efficiently support construction project planning and controlling processes, have been increased to ensure a project success and the profitability of a construction company. To contribute to improving practical effectiveness of a project control system, the paper reviewed and analyzed the current trends and functional features of current project control systems. And it also described the pending issues and their solutions faced on previous project control systems.

Enhancing Project Integration and Interoperability of GIS and BIM Based on IFC (IFC 기반 GIS와 BIM 프로젝트 통합관리 및 상호 운용성 강화)

  • Kim, Tae-Hee;Kim, Tae-Hyun;Lee, Yong-Chang
    • Journal of Cadastre & Land InformatiX
    • /
    • v.54 no.1
    • /
    • pp.89-102
    • /
    • 2024
  • The recent advancements in Smart City and Digital Twin technologies have highlighted the critical role of integrating GIS and BIM in urban planning and construction projects. This integration ensures the consistency and accuracy of information, facilitating smooth information exchange. However, achieving interoperability requires standardization and effective project integration management strategies. This study proposes interoperability solutions for the integration of GIS and BIM for managing various projects. The research involves an in-depth analysis of the IFC schema and data structures based on the latest IFC4 version and proposes methods to ensure the consistency of reference point coordinates and coordinate systems. The study was conducted by setting the EPSG:5186 coordinate system, used by the National Geographic Information Institute's digital topographic map, and applying virtual shift origin coordinates. Through BIMvision, the results of the shape and error check coordinates' movement in the BIM model were reviewed, confirming that the error check coordinates moved consistently with the reference point coordinates. Additionally, it was verified that even when the coordinate system was changed to EPSG:5179 used by Naver Map and road name addresses, or EPSG:5181 used by Kakao Map, the BIM model's shape and coordinates remained consistently unchanged. Notably, by inputting the EPSG code information into the IFC file, the potential for coordinate system interoperability between projects was confirmed. Therefore, this study presents an integrated and systematic management approach for information sharing, automation processes, enhanced collaboration, and sustainable development of GIS and BIM. This is expected to improve compatibility across various software platforms, enhancing information consistency and efficiency across multiple projects.

Economic Evaluation of Early Detection System for Warranty Issues (품질보증 이슈 조기감지 시스템의 경제성 평가)

  • Jung, Sung-Hwan
    • Journal of Korean Society for Quality Management
    • /
    • v.40 no.1
    • /
    • pp.39-48
    • /
    • 2012
  • An early detection system for warranty issues periodically collects customers' claim data and automatically reports alarms about emerging issues based on statistical algorithms. It helps companies to reduce an issue definition time and save the handling cost of warranty claims. This paper provides an evaluation framework to validate the economic effect of an early detection system project. For this purpose, we present economical index of a project with explicit formulas such as ROI(return on investment), PP(payback period), NPV(net present value), PI(profitability index) and IRR(internal rate of return) and analyze the sensitivities of the index according to the variation of project input parameters. The proposed analysis framework is expected to be used for evaluating economic values of various system integration projects.

Technical Parameter Selection Method of the System Development - Focusing on the Military R&D Project - (시스템개발에서의 기술적성과측정 파라미터 선정 방법 - 국방 R&D 사업 중심으로 -)

  • You, Yi-Ju;Kim, Jin-Hoon;Park, Young-Won
    • Journal of the Korean Society of Systems Engineering
    • /
    • v.5 no.1
    • /
    • pp.49-56
    • /
    • 2009
  • This research attempts to acquire technical performance measure information based on identifying the Critical To Quality(CTQ) parameters of user requirement by using Quality Function Deployment(QFD) methodology in the initial phase of a defense R&D project. This results will contribute to the integration of technical progress to the Work Breakdown Structure(WBS) based project performance tracking. It also improve the bridging of systems engineering activities to the project management and the project decision making process.

  • PDF

A Development of the Design modification function for road construction project Cost management (도로분야 공사비정보 관리를 위한 설계변경 기능 개발)

  • Moon, Jin-Seok;Yoon, Hoi-Su;Kim, Sung-Jin;Han, Choong-Han
    • Proceedings of the Korean Information Science Society Conference
    • /
    • 2012.06b
    • /
    • pp.16-17
    • /
    • 2012
  • 국토해양부는 지방국토관리청의 도로공사와 관련하여 발생하는 공사비 정보의 교환 및 공유를 목적으로 작업분류체계 기반의 공사비 관리 항목을 추가하여 전자설계도서 작성 납품 지침을 개정하였다. 이를 반영하고 문제점 개선 및 활성화를 위하여 5개 지방국토관리청에서 관리중인 10개 도로건설공사를 시범적용 사업으로 지정하여 발생하는 공사비 정보를 디지털 수량산출정보로 관리하고 있다. 시범사업을 진행하면서 건설공사에 발생하는 설계변경 업무를 전자화하여 관리하는 기능을 개발하고 추가 적용하였다. 이를 통해 건설사에서 생성한 설계변경 정보를 건설사와 발주처가 동일한 형태로 공사비 정보를 공유 및 관리 가능하도록 하였다.

Appraising the Performance of Construction Projects during Implementation in Kenya, 1963-2018: A Literature Review Perspective

  • Ong'ondo, Cyrus Babu;Gwaya, Abednego Oswald;Masu, Sylvester
    • Journal of Construction Engineering and Project Management
    • /
    • v.9 no.2
    • /
    • pp.1-24
    • /
    • 2019
  • Poor project performance has been noted as the bane in the construction industry globally. This paper sought to investigate, by way of literature, the performance patterns of construction projects in Kenya since independence (1963-2018). This was informed by reports of undesirable project performance in the industry. This descriptive study used available studies previously done in this subject area. In sum, literature is replete with evidence on a myriad of challenges facing the execution of projects. The study established that generally, the project performance is poor and has assumed a chronic trajectory spanning over five decades. On average, the findings reveal that 35-60% of projects initiated in Kenya face cost overruns while time overrun is most severe with 35-73% projects overrunning their schedule. In addition, the findings problematize the issue of plurality of performance measurement regimes in the construction industry. Here, it was observed that no singular construct exists to objectively measure the various facets that constitute the 'health' of a project. This paper has contributed to the body of knowledge by examining the performance patterns in Kenya for over fifty years while at the same time identifying the bottlenecks inherent in projects execution. Importantly, the conceptual performance efficiency framework derived in the current study presents a paradigm shift in the monitoring and evaluation of projects. To this end, an in-depth analysis is recommended on the interaction of efficiency enablers in the buildup of performance efficiency index (PEI). Similarly, a further inquiry is recommended on the integration and impact of the proposed framework in the management of projects.

Framework and Tool for Quantitative Six Sigma Project Management (정량적 식스 시그마 프로젝트 관리를 위한 프레임워크와 도구)

  • Park, Hyun-Cheol;Ryu, Ho-Yeon;Baik, Jong-Moon
    • Journal of KIISE:Software and Applications
    • /
    • v.35 no.4
    • /
    • pp.234-244
    • /
    • 2008
  • Since the advent of Six Sigma in 1980's, Six Sigma is widely used in various industry areas, such as manufacturing, financial, government, and service, and proves its innovation ability and value by providing lots of success stories. Several researches have been conducted to adopt Six Sigma for Software Development and Software Quality Assurance-Software Six Sigma. Although the wide use of Six Sigma, there is no software tool to support the execution of Six Sigma Project. For this reason, the Quantitative Six Sigma Project Management is required to support for measuring and analyzing Six Sigma Projects, storing and reporting the results from Six Sigma Projects, and managing Six Sigma Projects through the whole process of, DMAIC or DMADV. In this paper, we introduce the design and implementation of a Quantitative Six Sigma Project Management Framework and Tool. The execution of Six Sigma Project based on Six Sigma Project Management Tool benefits the quantification, the systematization, and the integration.