Journal of Korean Society of Industrial and Systems Engineering
/
v.34
no.4
/
pp.89-97
/
2011
Traditional quality control for manufacturing or service sector is not suitable for the quality control of a project as the project is one-time task constrained by time, cost, and quality. To meet the internal and external customers' requirements, quality costs approach to the project will be effective. Hence, we propose PONC (price of nonconformance) estimation procedure and a mathematical model, which are focused on activity-based prevention in the execution step and warranty step of EPLC (extended project life cycle). This procedure and model will help project manager develop preventive action plan for project quality costs minimization from nonconformance risk activities and PONC estimates information.
Journal of the Korea Institute of Building Construction
/
v.8
no.1
/
pp.49-56
/
2008
According to the recent trends which are the diversity of customer requests and the multi-function of buildings, A construction company's business has converted from the producer-oriented approach to the consumer-oriented approach. Therefore, each construction company is continuously trying to improve the quality level as a way of corresponding to customer needs in these changing situations. The quality is one of the main management targets which judge the success of a project along with the schedule, the cost and the safety. As construction companies execute the quality management which they aimed at, it should be completed within the optimum schedule and the limit of the budget. Accordingly, the importance of the construction site management to complete a project is continuously increasing. The construction site management is the systematic method to perform the project goals such as the quality improvement, the cost saving and the safety management, which organically operate one another, by procuring the manpower, the material and the machine in the right time. Specially, as the construction industry has based on the construction site, the establish of systematic construction site management, which can effectively correspond sudden changes of the construction business environment, is essential to maximize the construction productivity. On top of that, the necessity of the quality management method is increasing to accommodate customer needs more spontaneously in the construction site. These endeavors could guarantee their competitive power.
Chung, In-Keun;Kwak, Soo-Il;Birnbaum-More, Philip H.
Asia pacific journal of information systems
/
v.11
no.3
/
pp.63-89
/
2001
The purpose of this research is to develop strategic alternatives for the high-tech products development by comparatively studying characteristics of the industry and R&D structures in Korea and the US. Some of the environmental, strategic, organizational and project teams' characteristics are studied. Data were collected from Korea and US high-tech companies through interviews and questionnaires and event analysis method was used to analyze them. The findings are as follows: First, when the level of market concentration is high, cycle time tends to be longer. Therefore, if there are many competitors in the market, new products development should be swift due to competitive pressures. Second, the developmental strategy should be directed toward the existing customers to speed up new products development. That is, a defensive strategy would result in a shorter cycle time and response time compared to a strategy directed to a niche market. Third, when the level of formalization is high, cycle time tends to be shorter. This means that formal procedures for new products idea development or new products development policies shorten new products development time.
Proceedings of the Korean Society of Precision Engineering Conference
/
2003.06a
/
pp.1266-1269
/
2003
Many studies have indicated that most of a product's cost is fixed early in its lift cycle, before the original design cycle is complete. This implies that we should consider various aspects of product lift cycle at the design stage. This means the need of collaboration in design stage. Because the Internet provides instant access to a wealth of design information, the Internet is used by the collaborative design team members as a medium to share data, information and knowledge, and in some cases for product data management and project management by integrating the Web with appropriate technologies. This paper presents a real-time collaborative design system for powerful interaction performance, based on the Internet and Web technologies. Using The system use the client/server architecture and the purpose of the system is to provide a method that enables real-time view, review and modification of the 3D model through the Internet.
Kim, Tae-Hoon;Shin, Yoon-Seok;Cho, Seong-Soo;Kang, Kyung-In
Proceedings of the Korean Institute of Building Construction Conference
/
2007.11a
/
pp.115-118
/
2007
A tall building construction is needed to reduce the construction duration for project profitability. Reducing the cycle time of typical floor in the structural frame work which have the largest duration in the whole construction, greatly affects construction duration. Nowadays, some projects are accomplished in the 3 day cycle. In order to accomplish efficiently 3 day cycle, productivity information of similar projects is supported. Therefore, this study proposed labor productivity and application by slab formwork to construct by the 3 day cycle. In order to perform an analysis, we selected 3 cases and analyzed the labor productivity on the basis of the amount of slab forms, labors, and durations. Then, we performed the questionnaire to analyze the application by formwork of tall building construction engineers. This study will contribute to establish a reasonable scheduling in structural frame work of a new similar project.
International conference on construction engineering and project management
/
2013.01a
/
pp.21-27
/
2013
Construction safety is a predominant hindrance in in-situ workflow and considered an unresolved issue. Current methods used for safety optimization and prediction, with limited exceptions, are paper-based, thus error prone, as well as time and cost ineffective. In an attempt to exploit the potential of BIM for safety, the objective of the proposed methodology is to automatically predict hazardous on-site conditions related to the route that the dozers follow during the different phases of the project. For that purpose, safety routes used by construction equipment from an origin to multiple destinations are computed using video cameras and their cycle times are calculated. The cycle times and factors; including weather and light conditions, are considered to be independent and identically distributed random variables (iid); and simulated using the Arena software. The simulation clock is set to 100 to observe the minor changes occurring due to external parameters. The validation of this technology explores the capabilities of BIM combined with simulation for enhancing productivity and improving safety conditions a-priori. Preliminary results of 262 measurements indicate that the proposed methodology has the potential to predict with 87% the location of exclusion zones. Also, the cycle time is estimated with an accuracy of 89%.
Proceedings of the Korean Institute Of Construction Engineering and Management
/
autumn
/
pp.102-112
/
2001
It has been passed $5\~6$ years since Construction Management introduced in Korea, but a few government projects have been presented as CM instances. We performed CM service, on behalf of the foreign Client, in the Insa-dong construction, I-Project. Even though there were many limits in cost, time and other aspects, we have attained satisfaction of the Client and successful businesses of all the construction parties as adopting the advanced management methods. Many advanced construction methods have been applied for the purpose of time reduce, cost save and quality assurance as well as to the webbased project management has been imported to overcome the limits of time and place. They have actualized to increase the productivity of the project by managing the floor to floor cycle and quality systemically pursuant to ISO 9002, and by adopting Real-name construction and completion system (or individual activity. While carrying out this project, it is possible to establish mutual reliability and understanding enable to resolve the issues occurring in the early stage due to insufficient understanding of CM, lack of communications and team work, indistinct work scope through continuos training and conferences. Additionally, we became to share business targets among the parties and promoted the project in confidence. We wish that the success of I- project to be rated as a standard model of CM in Korea.
Korea officially joined the ALMA (Atacama Large Millimeter/submillimeter Array) project on August 17, 2014. Korea was allowed to apply for the Cycle 2 call-for-proposal before joining the project. Korea submitted 17 proposals, and 4 of them were selected as high-priority. The fund of an 11-year Korean ALMA project in the KASI (Korea Astronomy and Space Science Institute) was approved. The project team formulated an ARC (ALMA Regional Center) node at the KASI and already started its supporting activities for the Korean Astronomical Society. The team also set up a future development plan for ASTE (Atacama Submillimeter Telescope Experiment) and ALMA. A couple of engineers are now doing concept design of a multi-beam receiver system for the ASTE, Because of the ALMA participation, Korea could also access open-use time of ASTE and Mopra telescopes organized by Japan. As of this writing, EACOA (East Asia Core Observatories Association) is now under discussion on making an organization called "East Asian Observatory" and the possible operation of JCMT (James Clerk Maxwell Telescope). I will briefly mention the future prospect of these activities.
Seo, Yeung-Su;Jung, Hun;Park, Hae-Woo;Yu, Chun-Gun;Lee, Jun-Hyuk;Kang, Byung-Wook
한국정보컨버전스학회:학술대회논문집
/
2008.06a
/
pp.59-62
/
2008
When performing a project, the most important thing is building a result with planned quality within development period. Particularly, if the project is delayed or has no good quality in the case of the mobile game development project which is sensitive to the release time and quality, it is immediately connected to the failure of the project. Extreme Programming is a methodology that divides the development cycle into smaller units for reducing the risk factor of the project in which the development period is important. In this paper, we suggest the Expanded Extreme Programming for mobile game development environment in which the development period and quality are important
In this paper, an integrated management software is developed to promote the business competitive power. The interoperability among the software accounts for an ever growing performance of petrochemical plant project. If the interoperability is built up, company has taken advantages of quality, schedule, cost, and safety by active communication. The advantage of an integrated management software is examined in three aspects. In efficiency aspect, It takes advantage of the saving about the various information and the standard of project performance procedure. In quality, the integration gave aid to a quality improvement through team collaboration and data management within project life cycle. In cost, poor communications between systems waste 30% of project costs. If information could be inputted once and used by all, reductions in delivery time up to 40% were possible. Therefore, 10% savings of engineering cost was also possible.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.