• Title/Summary/Keyword: Progress Management System

Search Result 701, Processing Time 0.034 seconds

Development of automatic alert populating system of earth structures based on sensor monitoring (센서 모니터링을 활용한 토류구조물 상황전파 자동화 시스템 개발)

  • Kim, Yong-Su;Ahan, Sang-Ro;Jung, Jae-Hyun;Han, Sang-Jea;Jung, Seung-Yong
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2009.03a
    • /
    • pp.667-672
    • /
    • 2009
  • Gathering information and systemization of infrastructure disaster management is to reduce uncertainties in making decisions and maximize the number of alternations. The key objects of a sensor-based progress report and propagation automation systems are to provide objective data, realize and support decision making and deliver them to a certain area, department, manager and other people rapidly. The major findings and results of this study are as follows. 1) Application of international standard-based alerting protocol(CAP; Common Alerting Protocol). 2) Development of database of existing progress report and propagation manual in order to achieve networking of safety management on major social infrastructure of the nation. 3) Development middleware application programs to progress report and propagation data using SMS, FAX, EMS, VMS, MMS.

  • PDF

Attributed AND-OR Graph : A Semantics for Formal Model Management for Digital Systems Design (Attributed AND-OR Graph : 디지털 시스템 설계에 있어 모델 관리를 위한 정형론)

  • Kim, Jun-Kyoung;Kim, Tag-Gon
    • Proceedings of the Korea Society for Simulation Conference
    • /
    • 2005.05a
    • /
    • pp.34-39
    • /
    • 2005
  • The progress of silicon technology enables to implement a highly complex digital system on a given chip area. However, even the modern design environment is not so efficient to catch up with the progress of process technology. Design reuse is a promising approach to designing such a complex system in an efficient way. However, the rigidness and inflexibility of a model has been an obstacle to design reuse. This paper proposes a high-level model management methodology by introducing attributed AND-OR graph(AOG), a (formal semantics for representing the possible structure of a model. Using the formalism enables a designer to extract, extend and reuse the pre-modeled and pre-verified design. A complete process of constructing a cache operational model, extending the model and extracting executable models is exemplified to show effectiveness of the proposed framework.

  • PDF

Development of Active 5D CAD System for Replaning Progress Schedule According to Change of Project Cost (사업비 변동에 따른 공정계획 재수립을 위한 능동형 5D CAD 시스템 개발)

  • Kim, Hyeonseung;Kang, Leenseok
    • Korean Journal of Construction Engineering and Management
    • /
    • v.17 no.5
    • /
    • pp.54-61
    • /
    • 2016
  • The initial planned annual cost is frequently adjusted under the construction process in construction projects. If the annual cost is reduced than the initial planned cost, the number of possible activities is also reduced from initial planned progress schedule. In such cases, project manager need to replan the progress schedule with possible activities within changed annual cost. However, most project manager will proceed as planned schedule without any change. After the project cost has been exhausted, there are many cases to stop the operation of the construction site. This study developed active 5D CAD system that can replan the progress schedule within changed annual cost and simulate the cost status according to the changed schedule for cost visualization. This system can be used as a decision-making tool in the replaning progress schedule and will be able to increase the practical usability of 5D CAD system.

A Study on the effects of Factors of Family Leisures on Family Intra-system Dynamics (가족여가 유형이 가족체계 역동성에 미치는 영향 연구 -자녀교육기의 도시가정을 중심으로-)

  • 지영숙;이태진;최보아
    • Journal of Families and Better Life
    • /
    • v.20 no.4
    • /
    • pp.189-196
    • /
    • 2002
  • The purpose of this study is to investigate the effects of factors of family leisures on family intra-system dynamics and quality of family life. A total 309 questionnaires was analyzed from married men and women of school-age families. Factors of family leisures were classified in 'education oriented', 'hobby oriented', social oriented'and 'family oriented'in the study ahead.(Refer to Journal of korean Home Management association Vol. 19(2).) The major results of this research were as follows. First, family intra-system dynamics was classified 'individual progress', 'sentimental stability','interaction'and 'management efficiency'. Second, the group that participated more in 'social oriented'and less in 'family oriented'activities had higher level of 'individual progress'. The group that participated less in 'social oriented'and more in 'education oriented'activities had higher level of 'sentimental stability'The group that participated more in 'education oriented'activities had higher level of 'interaction'and 'management efficiency '. Based on the results as above, we suggest people need to overcome 'a mental panic'through the family leisure. And we need to develop concern with family leisure as a practical loaming.

A study on the development of the nuclear R&D performance monitoring system (원자력연구개발 목표관리시스템 개발)

  • 박준원;최현호;원병출
    • Proceedings of the Korean Operations and Management Science Society Conference
    • /
    • 1996.04a
    • /
    • pp.217-220
    • /
    • 1996
  • This study presents a R&D performance monitoring system (RDMS) that is applicable for managing nuclear program in KAERI. The prime goal of RDMS is to furnish project manager with reliable and accurate information on status of progress, performance and resource allocation, and attain traceability and visibility of project implementation for effective project management. In this study, the work breakdown structure (WBS) as the governing factor for integration of scope, schedule, resource data was derived, and the above parameters were loaded personal computer. A RDMS is comprised of about 12,000 R&D activities of the 16 goverment-led projects. The Primavera software was used to monitor the progress, evaluate the performance and analyze the resource distribution to activities.

  • PDF

A Study on TFP and Source of Turnover Growth of Trade Ports in Korea (총요소생산성과 한국항만 물동량 증가의 원동력에 관한 연구)

  • Jin, Han-Xin;Huo, Yan;Lee, Chang-Ho
    • Journal of the Korea Safety Management & Science
    • /
    • v.12 no.4
    • /
    • pp.191-198
    • /
    • 2010
  • This paper selects length of berth, area of yard, unloading capacity and number of berth as the input indexes, and cargo turnover as output index to research the source of turnover growth of 22 main ports in Korea. We gains the following results: in general, the trade ports in Korea are the stage of expansion period, the sources of turnover growth depends on the growth of factor inputs and could not be supported by TFP and technical progress. Especially in the west and east coast, TFP and technical progress is the block to the turnover growth. Four major factors to the increase of TFP are following: competition between ports, reform of property system, harbor-hinterland economic and international trade, modeling, imitation and innovation in management, technology and system.

Development of Construction Process Safety Information Management System for Safety Accident Prevention (안전사고 예방을 위한 건설업 공정 안전 정보 관리 시스템 개발)

  • Jun Hyun Jong;Yang Kwang Mo;Kang Kyung Sik
    • Journal of the Korea Safety Management & Science
    • /
    • v.7 no.1
    • /
    • pp.11-23
    • /
    • 2005
  • It is difficult to put it into practice in that it requires bearing too much burden to draw out the planning itself in a case of large construction work. Consequently in this paper we select evaluation criteria by construction progress, classify into several categories, and regard potential danger which often occurs, as a evaluation criterion. Further step is to allow workers or collaborated companies to express their expert opinions or experiences and to encourage quality and process control and autonomous safety control by applying PSM(Process Safety Management) method using AHP(Analytic Hierarchy Process) and to development of PSIM(Process Safety Information Management) evaluation method in the construction. The reason why PSIM method should be quantitative and substantial progress is because it contributes Korean constructing companies to enhancing their safety control ability and to taking an equal stance just like developed countries, thereby strengthening their competitive edges.

A Study on the Using of BIM Data and Template for Construction Progress Management (건설공정관리를 위한 BIM데이터와 템플릿 활용 방안)

  • Oh, Kun-Soo;Park, So-Hyun;Song, Jung-Woo
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.17 no.8
    • /
    • pp.157-163
    • /
    • 2016
  • BIM is currently applied in some domestic construction firms, but it is not being actively utilized due to changes in working environments and qualms about new studies. In order to utilize a BIM model in the design phase, process information is needed during construction, but the input system and utilization method of the process information's state are not complete. Therefore, we propose a BIM template for construction progress management that can show basic BIM information as the construction progresses in an easy and convenient way. This method will facilitate the adoption of BIM and enhance the productivity of construction companies. To this end, we designed a progress explorer for step-by-step progress and work schedules, and we generated three-dimensional views and a progress list by applying unit information (primary units, part units, and detail units) of the work breakdown structure (WBS) to the parameters. To use the BIM template, work progress information is input to the BIM modeling objects through Dynamo. We also used Dynamo for quick and easy calculation of the quantity of materials needed for construction work. To test the BIM template, we applied it to an actual project and evaluated its visibility and a progress list. The results showed that the proposed BIM template facilitates progress management of a project and can thus facilitate the adoption of BIM and improve the productivity of construction companies.

Visualization of wildfire based on FIRMS API (FIRMS API를 이용한 GIS기반 산불 확산정보의 시각화)

  • Lee, Byung Hyun;Son, Min Woo;Kim, Byung Sik
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2022.05a
    • /
    • pp.454-454
    • /
    • 2022
  • Residents near the fire site are more anxious as they rely only on media information and the government's evacuation order due to the lack of information to understand the progress of the wildfire. Therefore, in the event of a wildfire, we try to understand the inconvenience of not being able to know the progress of the fire and solve it. This makes it possible to check the progress of wildfires and the spread of debris using the system interface (API) and weather data of the thermal infrared satellite image data (NASA FIRMS, Fire Information for Resource Management System), and finally, the purpose of this study. The results are provided through the Web including GIS-based visualization to provide decision-making reference information for evacuation in the event of a forest fire from the perspective of residents.

  • PDF

A study on the Project Process Management System (PPMS) for the effective management of R&D projects (연구개발(R&D) 프로젝트의 효과적 관리를 위한 과정모형에 관한 연구)

  • 김홍범
    • Korean Management Science Review
    • /
    • v.12 no.3
    • /
    • pp.45-60
    • /
    • 1995
  • This study examines a normative model of project management systems, PPMS, to provide information for directing R&D activity in order to increase R&D productivity. The PPMS (Project Process Management System) is a disciplined and systematic framework to manage R&D projects effectively and efficiently under the assumption of a strategic decision making and long-range planning. The purpose of PPMS is to provide for the management of research organization at different levels an effective management tool; first, for the planning system which deals with rational selection and authorization of R&D projects, second, for the control system which concerns monitoring and controlling the execution of R&D projects, and finally, for the evaluation system which attains evaluation of the performance results of R&D projects and determination of the necessary follow-up. A view for the future development of project management within the context of a project-performing organization is also elaborated to exhibit the progress and phase description of the project management system.

  • PDF