A MONITORING METHOD OF PROJECT PROGRESS WITH RFID TECHNOLOGY

  • Soungho Chae ; Naruo Kano
    • International conference on construction engineering and project management
    • /
    • 2005.10a
    • /
    • pp.491-496
    • /
    • 2005
  • In this paper, the authors explained the overview of a method for detecting location of worker for development of a monitoring system for project progress management using RFID technology. Data is the RSSI (Receive Signal Strength Indication) from RFID tag attached to the worker installing a rolling shutter, and was obtained from antennas and RFID readers set around the construction site. Neural network was done using RSSI collected and the area where worker is performing a task, and an estimation model of the working area was prepared. The network had a range of the percentage of correctly classified from 62% to 92%. The authors suggested the method to make estimate by using integrated networks prepared in respect of RFID readers, and showed the percentage of correctly classified of 84.3%. According to the result, the authors confirmed the possibility of the monitoring system with RFID technology, and mentioned the factors necessary to develop for further practical use.

  • PDF

A Decision Making Support Model of Work Item-based Adaptation Strategy for RFID-based Construction Logistics and Progress Management (RFID 기반의 건설 물류 및 진도관리 통합체계를 위한 공종별 적용전략 의사결정모델)

  • Koo, Do-Hyung;Yoon, Su-Won;Chin, Sang-Yoon
    • Korean Journal of Construction Engineering and Management
    • /
    • v.10 no.1
    • /
    • pp.3-15
    • /
    • 2009
  • As building construction projects have been more higher and bigger in scale, the needs for cost reduction, productivity improvement, and reducing of work terms have rapidly increased in recent years. There has been, accordingly, a great emphasis on the necessity of logistics and progress management by well-organized system developed based on the appliance of different management theories. Although highly developed IT technology has contributed to the efficiency and effectiveness in information research and project management, RFID has been merely applied to a single progress or a few types of materials in current management studies, not to the overall process of the projects. This research proposes a consistent and systemized approach for decision making in adopting RFID technology in a construction project to support construction logistics and progress management. With a decision making model that consists of process model and template developed in this research, risks in cost, time, and error in building RFID-based construction logistics and progress management could be minimized.

Development of a Project Schedule Simulation System by a Synchronization Methodology of Active nD Object and Real Image of Construction Site

  • Kim, Hyeon Seung;Shin, Jong Myeong;Park, Sang Mi;Kang, Leen Seok
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.344-348
    • /
    • 2015
  • The image data of the web camera is used to identify the construction status of the site in a remote office and it can be used for safety management. This study develops a construction schedule simulation system based on the active nD object linked with real image data of web camera from the construction site. The progress control method by 4D object uses a method that the progress of each activity is represented with different colors by progress status. Since this method is still based on a virtual reality object, it is less realistic description for practical engineers. Therefore, in order to take advantage of BIM more realistic, the real image of actual construction status and 4D object of planned schedule in a data date should be compared in a screen simultaneously. Those methodologies and developed system are verified in a case project where a web camera is installed for the verification of the system.

  • PDF

The Design & Effect Analysis of Project Objective Management Information System for National R&D cooperated by Industries, Universities and Government-supported research institutes (국가 산.학.연 협력 연구개발을 위한 과제목표관리 정보시스템의 설계 및 효과 분석)

  • Sohn, Kwon-Joong;Yoo, Wang-Jin;Lee, Cheol-Gyu
    • Journal of Technology Innovation
    • /
    • v.16 no.1
    • /
    • pp.107-139
    • /
    • 2008
  • We studied how to achieve successful implementation of massive research and development projects requiring collaboration among industries, universities and government-supported research institute. We have set up an engineering process innovation model to be deemed most adequately for all practical purposes, relying on the theoretical studies on the merits and analysis of the effect of the information system based on Milestone Management, Work Breakdown Structures and Web, which is known to be effective for research project (schedule) management and the objective management, and implemented a real-world web-based project objective management system. After a review of various R & D Project Schedule Management methods, we found that this information system was very compatible with project objective management. This project objective management information system carries out research and development projects effectively and efficiently, getting together in cyber-space and sharing information, and has been equipped with an Early Warning Subsystem to allow for pre-analysis and timely response to potential problems arising from the course of the project. The system also contains an Executive Information System that in real time, automatically provides the management information required by managers with the rate of project progress (achievement, fulfillment and delay). Lastly, actual progress can be cross-checked through both on-line objective management on the web-based information system and design review meeting held on site, to improve the efficiency and validity of the information system. Moreover, overall effect was analyzed through questionnaires on how well the system and generated information meet requirements and on the ultimate impact of the system upon objective management and communication. The questionnaire on the system effect revealed that the information system was useful to objective management and communication, and that the quality of the system was more than acceptable as well.

  • PDF

Intelligent Cyber Education System Model using Fuzzy Theory -Centering around Learning Achievement Evaluation Function- (퍼지이론을 이용한 지능형 가상교육 시스템 모델 -학습성취도 평가모듈 중심으로-)

  • Weon Sung-Hyun;Seo Sang-Gu
    • Management & Information Systems Review
    • /
    • v.14
    • /
    • pp.79-99
    • /
    • 2004
  • Cyber education system service is in the field of software service which is highlighted after the latter half of 1990'. But the progress of this service is impeded by the lack of back office which contributes to the evaluation of learning achievement and the management of learning progress. This article points out the problem of current back office which is the most important in the cyber education system, and focuses on the new intelligent learning achievement evaluation module. First, we define the cause and effect between the learning stages using by fuzzy implication which is the important part of fuzzy theory. Next, we suggest the model which generates the results of the learning achievement evaluation. This model, suggested by this article, may contribute to the development of the cyber education system by improving the current on-line education service.

  • PDF

A Study on the Application to PSM (Process Safety Management) Policy in the Construction (건설현장의 PSM(Process Safety Management) 제도 적용에 관한 연구)

  • 양광모;전현정
    • Journal of the Korea Safety Management & Science
    • /
    • v.5 no.4
    • /
    • pp.21-30
    • /
    • 2003
  • In this paper, we select evaluation criteria by construction progress, classify into several categories, and regard potential danger which often occurs, as a evaluation criterion. Further step is to allow workers or collaborated companies to express their expert opinions or experiences and to encourage quality and process control and autonomous safety control by applying PSM method. The reason why PSM method should be quantitative and substantial progress is because it contributes Korean constructing companies to enhancing their safety control ability and to taking an equal stance just like developed countries,' thereby strengthening there competitive edges. Boost of safety control system by PSM method will make an enormous contribution to preventing construction accidents on the site by establishing and securing an autonomous safety control system.

A Case Study about Improvement and System of Management in Park, Japan (일본의 도시공원의 운영관리체계와 개선에 관한 사례적 고찰)

  • 이기철
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.21 no.2
    • /
    • pp.80-90
    • /
    • 1993
  • This study was a case about improvement and system of management in park of Japan. Technique of Maintenance make a rapid progress. In the other hand, management was fall behind. Because of, its was not accept change of consciousness and variety of social factor. That is, not make clearly system of administration(organization, budget, etc.) for qualitative improvement of park. Besides, not make accumulation data of management and technique of maintenance. In future, need many study about system of management.

  • PDF

Fundamental Study of 4D CAD Application by Using Augmented Reality for Civil Engineering Project (증강현실(Augmented Reality)의 토목시설물 4D체계 활용을 위한 기초적 연구)

  • Kang, Leen-Seok;Moon, Hyoun-Seok;Kim, Hyun-Soo;Choi, Hyung-Lae;Kim, Chang-Hak
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.658-661
    • /
    • 2008
  • This study aims to suggest a methodology for developing the AR-4D CAD system which can improve construction progress control process by using augmented reality(AR) technology for civil engineering project. This study reviews practical application of AR process in 4D CAB system and suggests the detailed requirements, information flow system and integrated interface function for developing AR-4D CAD system. Through these methods, this research classifies main functions of AR-4D CAD system that can visualize construction progress control data, and suggests an operation scenarios of the system.

  • PDF

A Study on the Improvement of Construction Progress Measurement Based on Earned Value Concept (EV기반 RC 공사 진도율산정 개선방안)

  • Choi Tae-Young;Jung Hye-Won;Koo Kyo-Jin;Hyun Chang-Taek
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.307-310
    • /
    • 2003
  • Construction projects include risks due to uncertain factors, so it's important to repeatedly evaluate the performance of on-going work in all aspects of the projects. But construction projects are usually managed focusing on the results of projects. Moreover, cost and schedule are managed separately even though the efficiency of integrated management is very high. Recently many researches about cost and schedule integration methods are in progress according to the increasing of interest and EVMS (Earned Value Management System). Though researchers comment and propose many methods, it's hard to find example to apply it to the real project. So, the purpose of this study is to improve a method of construction Progress measurement Based on Earned value Concept by integration of cost and schedule management. It investigates the previous studies, interviews and performs a case study.

  • PDF