A Study on the Improvement of Construction Progress Management for EVMS (공정-원가 통합관리를 위한 진도관리 개선 방안)

  • Lee, Kyoo-Hyun;Park, Chan-Jung;Choi, In-Sung
    • Journal of the Korea Institute of Building Construction
    • /
    • v.2 no.3
    • /
    • pp.155-162
    • /
    • 2002
  • The Ministry of Construction-Transportation released a plan about EVMS in 1993 in order to prepare measures for an efficient public construction project, and prepared an enforcement proposal concretely in June for 2000 years, and have enforce a public project by an example with a target. Therefore, accurate analysis and evaluation about field progress are required for efficient management of a building construction, and must be established building construction management system for fast action about a problem However, unified management cannot be consisting because a work progress system is different from details estimate system within a country. and There is not still a definite standard in progress measurement for an application of EVMS. A purpose of this study is to present an improvement about a problem of progress measurement for an application of EVMS. The contents of a study, inquired into a progress measurement method and a standard to use in the field of a public construction and private construction and Checks a problem and presented an improvement item necessary for and is as follows. $\circled1$ must establishes a control account and progress measurement standard. $\circled2$ must manage progress in a activity viewpoint. $\circled3$ must use an accurate CPM process management technique.

AUTOMATED PROGRESS MEASUREHEMT FOR CONTRUCTION PROJECT

  • Seunghee Kang;Youngsoo Jung
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.1068-1074
    • /
    • 2009
  • The progress is widely used as a critical index for successful construction project management. In spite of the importance of progress measurement, the excessive management effort to collect and maintain detailed data has been highlighted as a major barrier to measurement of highly accurate progress. In order to reduce the required workload and to enhance accuracy, several researches have been conducted. These researches can be categorized into two groups. First group focuses on automated data collection utilizing advanced technologies only for limited construction tasks. The second group is a research area where the standard progress measurement methodologies encompassing entire construction tasks are investigated. Topics include the adjusting the level of details, standardizing work processes, and applying flexible WBS. However, the techniques for automated data collection are not fully investigated yet in the second group. Combining these two research areas can provide a solution for more effective progress management in terms of enhancing accuracy and optimizing workload. However, there has been no comprehensive research addressing these two research groups in an integrated manner. In this context, the purpose of this paper is to propose a methodology that identifies the most suitable measurement method and data acquisition technology (e.g., GPS, RFID, etc.) for entire construction tasks of a project. The proposed methodology in this paper will be able to facilitate the selection process of data acquisition technologies for entire construction tasks of a project and to support the overall enhancement of automated progress management.

  • PDF

Analysis of Construction Schedule Progress Management Practice (건설공사 진도관리의 현황 분석에 대한 연구)

  • Shin, Yoon-Kyung;Yun, Seok-Heon;Pack, Joon-Hong
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2010.05a
    • /
    • pp.207-211
    • /
    • 2010
  • As mega-sized and complex building construction projects are increased, the importance of project scheduling and control is emphasized. Project scheduling and control technic is not used widely yet in Korea, but interests in it is progressively increased. By now, most research projects mainly have focused on scheduling issues. Project progress management is also as much important as project scheduling issues. Current state about project progress management in Korea is analysed and way for improvements are suggested in this paper. At first, research projects undergone and practice are analysed and fields experts are survey about current state about project progress management. This study suggests the progress management method for quantitative and qualitative project progress analysis.

  • PDF

Project Management Information System Using Work Breakdown Structure (업무분할체계를 이용한 사업관리정보시스템)

  • 이정구
    • Proceedings of the Korea Society for Industrial Systems Conference
    • /
    • 1997.11a
    • /
    • pp.303-320
    • /
    • 1997
  • In A institute, project managers present quarterly project performance report according to institute's law. In quarterly project performance report, progress of project performance and budget expended should be written. Progress of project performance and progress of budget expended are key management factors in A institute. Because financial database system Is already constructed, progress of budget expended is got from information system. But the progress of project performance that project manager estimate subjectively can not be judged of its correctness because there is not project management information system that is able to calculate the progress of project performance systematically. In this study, we present the project management system assign all activities to every project participator according to their work share rate using WBS(Work Breakdown Structure) and calculate the progress of project performance systematically Also we construct project management information system for above project management system implementing.

  • PDF

Design and Implementation of Real-Time Progress Management System Using UML (Unified Modeling Language) - The Focus on Steel Structural Construction - (UML을 이용한 실시간 진도관리 시스템의 설계 및 구현 - 로봇 크레인 기반 철골공사를 중심으로 -)

  • Park, Jung-Lo;Kim, Kyung-Hwan;Kim, Jael-Jun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2009.05b
    • /
    • pp.163-166
    • /
    • 2009
  • All sorts of technique for schedule progress management is being developed recently, These can change and develop the abstractive concept model to a detailed model that describes the visual 3D image about a schedule plan. but, this technique is troublesome, because this requires the handwork by means of connection between 3D-CAD and scheduling Program. In this study, the process of real-time schedule progress control system using the integrated database by 3D-CAD object information system and schedule module is presented. This study present the process of a schedule progress management using UML, and the process of real-time schedule progress management using RFID system. Through this study, we want to realize the rapid generation of estimated schedule information and to simulate and analyze actual schedule information by real-time.

  • PDF

VRML based Realtime RFID+4D Progress Management System Development (VRML기반 실시간 RFID+4D 진도관리 시스템 개발)

  • Park, Jae-Hyun;Yoon, Su-Won;Choi, Cheol-Ho;Chin, Sang-Yoon
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2010.05b
    • /
    • pp.99-102
    • /
    • 2010
  • Today's construction is higher and more complex. So types and amounts of needed materials for construction project are increasing and those are occurred problems in construction site such as insufficient working space, confusion of materials handling order and working circulation. Because of those problems, research of progress management system using RFID+4D has been studied, but it is impossible to manage progress and material statement in real-time. So this study analyzed problems of current research and suggested VRML based RFID+4D Progress Management System. This Study focused on system basic concept and interface is designed for system development. This research is still progressing, so it has to do more development and research. However, it could be expected construction management efficiency and automation of management tasks.

  • PDF

Automated Progress Measurement and Management using Face Recognition (안면인식(Face Recognition)을 활용한 진도관리 자동화)

  • Kim, Namjoon;Jung, Youngsoo
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2013.05a
    • /
    • pp.160-161
    • /
    • 2013
  • Progress measurement is one of key tasks for cost and schedule management in construction management. However, there has been shortage of effort to implement for automated progress measurement. This paper proposes to use a face recognition (FR) technology for automated progress measurement and management in construction sites. The FR technology can acquire detailed progress data that includes the in and out information of labors by location. The expected effectiveness of the proposed system is to provide accurate labor information for progress measurement by utilizing automated data acquisition technology (DAT) with high-speed reading face. In addition, it could be applied to real-time safety and quality management by using the camera images.

  • PDF

A Standard Method for Progress Measurement in a Petrochemical Plant EPC Project (석유화학 플랜트 EPC 사업의 진도율 산정표준의 제안)

  • Cho, Hong-Yeon;Yoo, Hoseon
    • Plant Journal
    • /
    • v.7 no.4
    • /
    • pp.77-87
    • /
    • 2011
  • In proportion to continuing growth of overseas plant market and the trend of its mega scale of the project, the importance of management is significantly emphasized for the successful execution of the project. And it is recognized that progress control is the most important management item amongst the others in the management. Progress control is importance of progress measurement for performance measurement and process control of project, but it is hardly obtainable securing the objectivity in the progress measurement since the progress measurement are being applied differently in accordance with the project conditions and the experience level of the person in charge for the progress control. This study has conducted as following to propose a standard method for progress measurement in a petrochemical plant protect. Domestic and overseas plant projects are investigated variously with the applied method of progress measurement, and the deduced problem of progress measurement. And then standard method for progress measurement of engineering, procurement, construction and commissioning has been proposed according to comparison and analysis of practices in domestic & overseas plant project, procedures for progress control in the globally reputed petrochemical client, company rules and recommendation of the expert in progress control.

  • PDF

A Method to Build Daily Progress Management Model based on BIM Estimate Data in Construction Phase (BIM 기반의 시공단계 견적데이터를 활용한 일일 진도관리모델 구축 방안)

  • Jung, Jun-Ho;Chin, Sang-Yoon
    • Korean Journal of Construction Engineering and Management
    • /
    • v.12 no.5
    • /
    • pp.23-34
    • /
    • 2011
  • Reliable progress management at construction requires integrated information of cost and schedule, and information is used as a basis for project performance measurement. However, separate handling of cost and schedule information at construction projects makes objective measurement more difficult and decreases management productivity due to additional works for breaking down bill of quantities into corresponding activities. Recently, research related to BIM addresses issues on effective progress management based on BIM with incorporation of daily progress management. Therefore, the objective of this paper is to propose information model for daily progress rate and budgeted cost of work performed by utilizing BTM-based quantity and location information.

Improvement of Cost-Schedule integration based Progress Management through PMIS (비용-일정통합기반 진도관리 개선방안)

  • Yoon, You-Sang;Suh, Sang-Wook;Jang, Gyu-Seong;Choi, Jang-Shik
    • Korean Journal of Construction Engineering and Management
    • /
    • v.14 no.5
    • /
    • pp.144-152
    • /
    • 2013
  • Recently construction projects become more bigger. So construction companies have being performed cost and schedule management task by using PMIS. In engineering and construction phase, progress management which occur the most frequent information I/O(input and output) should be managed effectively by PMIS. Although most information by PMIS manage efficiently, cost-schedule information for progress management is difficult to be managed due to recurrent information input. thus when changed by price fluctuation and change order, progress management could not connnect cost information with schedule information. So it caused inaccuracy of progress measurement and data increase in PMIS. To solve this problem, This study suggests improved module for progress management through integration of cost-schedule using quantity take-offs as progress measurement method.