• Title/Summary/Keyword: Production and Delivery

Search Result 524, Processing Time 0.026 seconds

An integrated Single Vendor-Single Buyer Production Inventory System Incorporating Warehouse Sizing Decisions (창고 크기의사결정을 포함한 단일 공급자구매자 생산재고 통합관리 시스템)

  • An, Heungjo;Lee, Hyunsoo
    • Journal of Korean Institute of Industrial Engineers
    • /
    • v.40 no.1
    • /
    • pp.108-117
    • /
    • 2014
  • This study considers warehouse sizing decisions in an integrated single vendor-single buyer production inventory system by incorporating new decision variables and constraints associated with warehouse size into the formulations. Two typical inventory control policies proposed in the literature (i.e., Identical Delivery Quantity and Deliver What is Produced) have been investigated with consideration of warehouse investment costs. The numerical study shows that Deliver What is Produced is less flexible than Identical Delivery Quantity, resulting in the conclusion that the latter would be preferable when considering warehouse investment costs.

A Study to keep the Concrete Quality when pouring concurrently the Concrete with Different Mixing Ratio - Based on Gunsan D Project (배합비가 상이한 콘크리트의 혼합 타설시 품질확보에 관한 연구 -군산 D PROJECT를 중심으로-)

  • Kim, Kyung-Hoon;Lee, Sang-Hak
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2017.05a
    • /
    • pp.82-83
    • /
    • 2017
  • The samll-medium sized cities do not have enough infrastructure for the construction work, especially in terms of concrete supply. This research surveyed the capacity of remicon companies in Gunsan related with production and delivery. Their production capacity is bigger than the daily quantity required, however the delivery capacity is not enough to supply the daily quantity required and it is inevitable to use the several remicon using different admixture. It might cause the harm to the structure. This research studied the way to remove the quality risk when using different admixture at the same time.

  • PDF

Virus-like Particle (VLP) Mediated Antigen Delivery as a Sensitization Tool of Experimental Allergy Mouse Models

  • Juhyung Kim;Jeein Oh;Chon-Sik Kang;Youn Soo Choi
    • IMMUNE NETWORK
    • /
    • v.20 no.4
    • /
    • pp.35.1-35.13
    • /
    • 2020
  • Antigen delivery systems play critical roles in determining the quality and quantity of Ab responses in vivo. Induction of protective antibodies by B cells is essential in the development of vaccines against infectious pathogens, whereas production of IgE antibodies is prerequisite for investigation of allergic responses, or type 1 hypersensitivity reactions. Virus-like particles (VLPs) are efficient platforms for expression of proteins of interest in highly repetitive manners, which grants strong Ab responses to target antigens. Here, we report that delivery of hen egg lysozyme (HEL), a model allergen, through VLP could provoke strong HEL specific IgE Ab responses in mice. Moreover, acute allergic responses were robustly induced in the mice sensitized with VLPs that express HEL, when challenged with recombinant HEL protein. Our data show that antigen delivery in the context of VLPs could function as a platform for sensitization of mice and for subsequent examination of allergic reactions to molecules of interest.

Case studies : Security issues of IT products in terms of supply chain (사례 위주로 본 공급자망을 중심으로 한 IT제품 보안 위험)

  • Choi, Woongchul
    • Journal of Korea Society of Digital Industry and Information Management
    • /
    • v.12 no.4
    • /
    • pp.89-96
    • /
    • 2016
  • Before an IT product is used, there is a sequence of the process such as the components supply-demand of the product, their assembly and production, their logistics and delivery, and then finally, the product can be used by a user. During this sequence of the process, there can be many security exposures and risks. In this paper, we show, by examining security cases of various IT products, that there are many security exposures in the process of IT products from their production to their delivery to end users and in their use, and also show how critical the security exposures are. Even though there are various security theories, technologies and security controls, there is still weak link from the production of an IT product to its use, and this weak link can lead to security vulnerabilities and risks. This paper tries to call attention to the importance of the execution of the security control and the control components. We examine the practical cases to find out how the security control is paralyzed, and to show how it is compromised by asymmetric security resources. Lastly, from the cases, we examine and review the possible domestic security issues and their countermeasures.

Order Promising Rolling Planning with ATP/CTP Reallocation Mechanism

  • Chen, Juin-Han;Lin, James T.;Wu, Yi-Sheng
    • Industrial Engineering and Management Systems
    • /
    • v.7 no.1
    • /
    • pp.57-65
    • /
    • 2008
  • Available-to-promise (ATP) exhibiting availability of manufacturing resources can be used to support customer order promising. Recently, one advanced function called Capable-to-promise (CTP) is provided by several modern APS (advanced planning system) that checks available capacity for placing new production orders or increasing already scheduled production orders. At the customer enquiry stage while considering the order delivery date and quantity to quote, both ATP and CTP are allocated to support order promising. In particular, current trends of mass customization and multi-side production chain derive several new constraints that should be considered when ATP/CTP allocation planning for order promising - such as customer's preference plants or material vendors, material compatibility, etc. Moreover, ATP/CTP allocation planning would be executed over a rolling time horizon. To utilize capacity and material manufacturing resource flexibly and fulfill more customer orders, ATP/CTP rolling planning should possess resource reallocation mechanism under the constraints of order quantities and delivery dates for all previous order promising. Therefore, to enhance order promising with reliability and flexibility to reallocate manufacturing resource, the ATP/CTP reallocation planning mechanism is needed in order to reallocate material and capacity resource for fulfilling all previous promised and new customer orders beneficially with considering new derived material and capacity constraints.

Research on Risk Quantification of PC Components Production Scheduling Based on DBR

  • Shuyan Ji;Yuechuan Wang;Yingmin Li
    • International conference on construction engineering and project management
    • /
    • 2024.07a
    • /
    • pp.63-69
    • /
    • 2024
  • In order to improve the production and supply level of PC components and reduce the impact of risk accidents on production, this article hopes to solve the risk accident problems faced in industrial construction production by introducing mature constraint theories applied in the manufacturing industry. Firstly, this article introduces the widely used constraint theory and DBR method in traditional manufacturing industry; Secondly, based on the constraint theory DBR method, a pull production mechanism is established for the constraint buffering and material delivery of PC components, and risk accidents are defined and estimated; Then calculate and set buffer zones to reduce their risks and ensure the full utilization of bottleneck resources; The ultimate goal is to reduce production scheduling risks and improve production supply levels.

Current Status of Meal Box Service Management for Children from Low-income Families During Summer Vacation (여름방학 중 결식아동 도시락 제공 기관의 운영관리 실태)

  • Yoon, Bo-Rham;Yoon, Ji-Hyun;Shim, Jae-Eun;Kwon, Soo-Youn
    • Korean Journal of Community Nutrition
    • /
    • v.14 no.2
    • /
    • pp.206-215
    • /
    • 2009
  • The purpose of this study was to investigate the current status of foodservice management in organizations delivering meal boxes for low-income children during summer vacation. A survey was conducted with persons in charge of meal box production and service of these organizations via mail. Out of 114 questionnaires distributed nationwide, 100 were analyzed(87.8% analysis rate). Over half(53%) of the organizations delivered meal boxes consisting of rice and side dishes while the rest delivered side dishes only. About 81% of the organizations received KRW 3,000 per meal from their local governments and the rest received KRW 3,500. Only 28% of organizations had employed a dietitian. Over one-third(38%) of the respondents were unaware of the official nutritional standard of the foodservice program for low-income children during vacation. Most of the organizations(94%) had menu planned in advance. The average percentage of food cost was 84.1%. Over 40% of the organizations did not keep food samples for sanitation test(43%) and did not take any measures for keeping food temperature during delivery(45%). The organizations delivering rice and side dishes were more likely to be located in cities rather than rural areas and received higher reimbursement rate. The organizations receiving reimbursement of KRW 3,500 or hiring a dietitian were more likely to use standardized recipes, keep food samples for sanitation test, or take measures for keeping food temperature during delivery compared to the counterparts. Respondents reported that increasing reimbursement rate was the most necessary for improving the quality of meal box. This study results showed that the meal box delivery service for low-income children was not properly managed during the vacation, with regards to menu planning and food production. It is recommended that reimbursement rate for meal boxes should be adjusted depending on meal box types and local conditions.

A Simulation Analysis on the Assembly System of Mobile Bath Vehicles (이동식 목욕차량의 조립시스템에 대한 시뮬레이션 분석)

  • Chung, Hoyeon
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.44 no.2
    • /
    • pp.93-101
    • /
    • 2021
  • The purpose of this study is to analyze the adequacy of production capacity of the assembly process system of mobile bath vehicle's top box panel and process design through a simulation analysis. Towards this end, the layout of the facility designed with pre-verification job using a simulation modeling and an experiment, and facility, logistics process, and personnel input method were made into a simulation model, and the design system's adequacy was evaluated through an experiment. To produce 120 mobile bath vehicles annually, it was analyzed that 14 general workers and seven skilled workers were adequate through the experiment. It was also identified that three painting process lines carried out through outsourcing were adequate. Production lead time was 201.7 hours on average and it was 230 hours maximum. To meet customer delivery service level of 95% within the deadline when establishing a customer order and vehicle delivery plan, it was analyzed that more than 215 hours of lead time is needed minimum. If the process cycle time is reduced to 85% upon system stabilization and skillfulness improvement, it was analyzed that annual output of 147 vehicles can be achieved without additional production line expansion.

A study on the Smoothed Production( II ) (생산평준화에 관한 연구(II))

  • 김학철;송수정;김태호;나승훈;강경식
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.19 no.37
    • /
    • pp.221-231
    • /
    • 1996
  • Applying JIT(Just-In-Time) production system to strength competitiveness power and renovate managent has problems. This study is proposed to solve one of the problems, that mother company has different production system with subcontractor, in order to connect production system of mother company with subcontractor. In the view of the Pull System, production system of mother company, it is possible that the more smoothed production planning is established by developing the algorithm the smoothed production planning preserving the LOTproduction system and comparing the existing research. Also, in the view of subcontractor taking Push System, the possibility of keeping delivery and improving productivity is proved using simulation technique by changing Job shop to GT Cell production system because demand is fluctuating.

  • PDF

A Study on the Improvement of Productivity and Surface Roughness in Mold Machining using the Optimization of Cutting Force (절삭력 최적화를 이용한 금형의 생산성 및 표면조도 향상에 관한 연구)

  • Jeon, Eon-Chan;Lee, Su-Yong;Lee, Woo-Hyun;KIm, Dong-Hoo;Chun, Jung-Do
    • Journal of the Korean Society of Manufacturing Technology Engineers
    • /
    • v.20 no.6
    • /
    • pp.824-829
    • /
    • 2011
  • The mold is widely used for mass production in present industry. Also, product cycle time is faster, for this request, high productivity improvement in mold machining is required. And, In case of mold manufacturing company, the delivery shortening is required to quickly manufacture new product. Therefore, we aim for the delivery shortening though the method of machining time shortening in mold machining. On this paper, first, we made the NC-code of Insert die-casting as the object model using PowerMill. And then, analyzed cutting force by Toolpath in Insert mold machining using Production Module of Advantedge which is cutting force analysis program. After that, we came up with the optimum conditions of productivity improvement throughout the analysis result of before and after optimization of cutting force, machining time variation, and surface roughness by changing min tangential force to 80, 85, 90% of max tangential force.