A study on the Smoothed Production( II )

생산평준화에 관한 연구(II)

  • 김학철 (현대정보기술주식회사) ;
  • 송수정 (명지대학교 산업공학과) ;
  • 김태호 (명지전문대학 공업경영학과) ;
  • 나승훈 (명지대학교 공업경영학과) ;
  • 강경식 (명지대학교 산업공학과)
  • Published : 1996.03.01

Abstract

Applying JIT(Just-In-Time) production system to strength competitiveness power and renovate managent has problems. This study is proposed to solve one of the problems, that mother company has different production system with subcontractor, in order to connect production system of mother company with subcontractor. In the view of the Pull System, production system of mother company, it is possible that the more smoothed production planning is established by developing the algorithm the smoothed production planning preserving the LOTproduction system and comparing the existing research. Also, in the view of subcontractor taking Push System, the possibility of keeping delivery and improving productivity is proved using simulation technique by changing Job shop to GT Cell production system because demand is fluctuating.

Keywords