• Title/Summary/Keyword: Process Productivity

Search Result 2,534, Processing Time 0.028 seconds

Fed-Batch Sorbose Fermentation Using Pulse and Multiple Feeding Strategies for Productivity Improvement

  • Giridhar, R.;Srivastava, A.K.
    • Biotechnology and Bioprocess Engineering:BBE
    • /
    • v.5 no.5
    • /
    • pp.340-344
    • /
    • 2000
  • Microbial oxidation of D-sorbitol to L-sorbose by Acetobacter suboxydans is of commercial importance since it is the only biochemical process in vitamin C synthesis. The main bottleneck in the batch oxidation of sorbitol to sorbose is that the process is severely inhibited by sorbitol. Suitable fed-batch fermentation designs can eliminate the inherent substrate inhibition and improve sorbose productivity. Fed-batch sorbose fermentations were conducted by using two nutrient feeding strategies. For fed-batch fermentation with pulse feeding, highly concentrated sorbitor (600g/L) along with other nutrients were fed intermittently in four pulses of 0.5 liter in response to the increased DO signal. The fed-batch fermentation was over in 24h with a sorbose productivity of 13.40g/L/h and a final sorbose concentration of 320.48g/L. On the other hand, in fed-batch fermentation with multiple feeds, two pulse feeds of 0.5 liter nutrient medium containing 600g/L sorbitol was followed by the addition of 1.5 liter nutrient medium containing 600g/L sorbitol at a constant feed rate of 0.36L/h till the full working capacity of the reactor. The fermentation was completed in 24h with an enhanced sorbose productivity of 15.09g/L/h and a sorbose concentration of 332.60g/L. The sorbose concentration and productivity obtained by multiple feeding of nutrients was found to be higher than that obtained by pulse feeding and was therefore a better strategy for fed-batch sorbose fermentation.

  • PDF

A Study on Effects of Software Process Improvement for Competitive Advantage (소프트웨어 프로세스 개선 노력이 국내 SI 업체의 경쟁우위에 미치는 영향에 관한 연구)

  • 김성희;이경아;이주헌
    • Journal of Information Technology Applications and Management
    • /
    • v.9 no.3
    • /
    • pp.113-127
    • /
    • 2002
  • The effort for software process improvement is lately surging its interest though it does not satisfy both developer and receiver In terms of low productivity, quality, delay and increasing cost. According to current research, software process improvement contributes to improvement of productivity, its Duality, reduction of development time and cost, and the prediction of the time limit for delivery, which means software process improvement affects competitive advantage among developers. The latest research is whether the investment for information technology substantially had effect on improvement of productivity. That is, software process improvement and maturity of software industries has influence upon economic efficiency and as a result, it plays an important role in whole industries. This research is that how does software process improvement using CMM (Capability Maturity Model) and SPICE (Software Process Improvement and Capability dEtermination) have a effect on factors of software engineering, and how does it have influence upon competitive advantage among SI firms. For this research, reusability, customizability, participation, and review & inspection are set to independent variable and process flexibility and process predictability are set to mediate Variable. Finally, competitive advantage among SI firms Is set to dependent variable. The targets for survey are laborers who work for SI firms. The result of this research is as follows: 1 ) Reusability, Customizability and participation is not rejected but review and Inspection is rejected in process flexibility which has significant level 0.05. 2) Reusability, Customizability and participation is not rejected but review and inspection Is rejected in process predictability which has significant level 0.05. 3) Process flexibility is not rejected and process predictability Is rejected in the competitive advantage of 51 industries which has significant level 0.05

  • PDF

Multiple Regression Technique for Productivity Analysis of the Jointed Plane Concrete Pavement (JPCP)

  • Yoo, Wi-Sung
    • Korean Journal of Construction Engineering and Management
    • /
    • v.9 no.6
    • /
    • pp.268-276
    • /
    • 2008
  • In highway construction projects, concrete pavement productivity has been challenged with constructors and decision-makers; at present there are few methods available to accurately evaluate the factors impacting on it. Any inefficient method to analyze it leads to the excessive schedule, higher rehabilitation costs, shorter service life, and reduction of ride quality. To implement these negative outcomes, constructors or decision-makers need a systematic tool that can be used to categorize the factors related to construction productivity. This paper applies multiple regression technique for productivity analysis of the Jointed Plane Concrete Pavement (JPCP), identifies the significant factors, and provides a predictive model assisting in monitoring and managing the productivity of the JPCP construction process. The completed and progressive projects are employed to derive and assess the proposed model. The results are analyzed to illustrate its capabilities.

Productivity growth in Korean Railway Transport (우리나라 철도수송의 생산성 변화)

  • Kim, Hyun-Woong;Kook, Kwang-Ho;Moon, Dae-Seop
    • Proceedings of the KSR Conference
    • /
    • 2009.05a
    • /
    • pp.378-381
    • /
    • 2009
  • This paper investigates the productivity growth in Korean railway transport. The productivity growth is calculated by a process of measuring of pure efficiency change index(PECI), scale efficiency change index(SECI), and technical change index(TCI), using Data envelopment analysis (DEA) method. The data cover the period 1999$\sim$2006; 1999$\sim$2003 are the pre-structural reform years and the post-structural reform years are 2004$\sim$2006. The framework for the analysis is Malmquist Productivity Index (MPI) of the to investigate the impacts of structural reform on productivity growth, respectively. The inputs considered are the length of operating line, the number of staff, the number of coach and wagon, and the outputs are the trains movement of passenger and freight, and the traffic of passenger and freight. Results indicate that Korean railway experienced a annual productivity growth of approx. 3% after the structural reform.

  • PDF

Productivity and Task Difficulty Improvement of PCB Soldering Process by Changing Work Interface (PCB Soldering 공정의 작업 인터페이스 변경에 따른 작업난이도 및 생산성 향상)

  • Lee, Sung-Koon;Park, Peom
    • Journal of the Ergonomics Society of Korea
    • /
    • v.29 no.6
    • /
    • pp.943-949
    • /
    • 2010
  • When PCB soldering is performed with microscope due to the electronic components' microminiaturization, workers' awkward upper body postures and difficulties being in focus among lens, object and eyes are one of reasons for productivity decline. The object of this study is to investigate the level of difficulties of work and the extent of productivity improvement by changing work interfaces from the work using microscope to the work using LCD monitor. Independent variables was usage of microscope and image system and dependent variables were upper body segments including neck, shoulder, back, and waist, task convenience and eye fatigue. The Visual Analogue Scale (10cm) was used for questionnaire and one way ANOVA (two levels) and two sample t-test were conducted. In addition, RULA rating was conducted for working postures. The result showed that interface changes of LCD monitor, suggested by productivity comparison per one Man Hour, highly contributed to work convenience and productivity improvement.

Development of Simulation Model for Earthwork Considering Factors Affecting Construction Productivity (생산성 영향요인을 고려한 건설현장 토공사 시뮬레이션 모델 개발)

  • Sa, Sewon;Lee, Chanwoo;Cho, Hunhee;Kang, Kyeong-In
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2021.05a
    • /
    • pp.149-150
    • /
    • 2021
  • Earthwork is the starting work of construction process, which has the greatest impact on the productivity of the construction project among the works. However, it is difficult to derive accurate productivity becuase the earthwork plan is affected by geological condition of the jobsite. Therefore, a simulation model for productivity analysis of earthwork was developed using CYCLONE modeling method in this study. In this paper, simulation model was made considering the impact factors of earthwork productivity. The proposed model can be utilized for sensitivity analysis in future studies.

  • PDF

Formwork Productivity Analysis Model for Cost-efficient Equipment Operations

  • Hyunsu Lim;Taehoon Kim;Hunhee Cho;Kyung-In Kang
    • International conference on construction engineering and project management
    • /
    • 2013.01a
    • /
    • pp.226-230
    • /
    • 2013
  • In the tall building construction, the slab formwork largely impacts on construction cost. Because productivity of a slab formwork is influenced by a number of and the efficiency of equipment, using the equipment-based construction method, an appropriate equipment input planning is crucial for the productivity. Meanwhile, the general equipment input planning is conducted by intuition based on experience due to the lack of equipment productivity data. Thus, this study develop a simulation model to analyze table formwork productivity and to propose an optimum equipment input plan that reflects the construction process, based on the full consideration of the economic factors. This study developed a simulation model by using CYCLONE and the data for the model was collected by measuring the duration of each unit activity in the tall building where table forms were applied. It is expected that a simulation model helps users to make better decision on the equipment input planning of slab formwork.

  • PDF

Productivity Analysis of the Prefabrication Stage for Layered Modular Housing Units (적층식 모듈러 공동주택 공장제작 단계의 생산성 분석)

  • Seok Kim;Suyeul Park;Moonsun Park
    • Journal of the Korean Society of Industry Convergence
    • /
    • v.27 no.2_2
    • /
    • pp.403-414
    • /
    • 2024
  • The aim of this study is to evaluate the productivity of multilayered modular housing units during the prefabrication phase. Additionally, it shows the results of productivity analysis conducted using the Web Cyclone technique. Initially, an review of literature and prior studies helped outline the comprehensive manufacturing process of laminated modular apartments, examining the range of minimum, average, and maximum work durations along with workforce size. Subsequently, the productivity of the multilayered apartments' prefabrication was assessed using the Web Cyclone technique, focusing on the workflow, duration, and personnel involved. This analysis also included a comparison of productivity against the initial plan based on the outcomes of a sensitivity analysis.

The Estimation of The Productivities of Institutions under Ministry of Oceans and Fisheries (해양수산부 산하기관의 생산성 추정에 관한 연구)

  • KIM, Tae-Hyun;KIM, Jong-Cheon;PARK, Cheol-Hyung
    • Journal of Fisheries and Marine Sciences Education
    • /
    • v.28 no.1
    • /
    • pp.186-197
    • /
    • 2016
  • This study applied the parametric bootstrapping method to analyze whether there was a change in the production efficiency of institutions under Ministry of Oceans and Fisheries. This study used input and output oriented productivity simultaneously. In particular, the productivity was estimated through 95% confidence interval derived by 2000 times re-sampling process. The results of the study showed us a reduction in overall total factor productivity by 24% between 2009 and 2013, and 7% of decreases in productivity annually. A recent conditions of an external economic shocks brought a 28% downward shift of production function. In this study, public institutions were divided into three types, which were public, quasi-government, and other public institutions. There were approximately 13%, 1%, and 5% decreases in total factor productivity per each. In analyzing the productivity each of 14 institutions, approximately DMU4 and DMU6 had 4%, and 5% increases in productivity per each. While DMU14 showed us no changes in productivity, all of the other 10 DMUs were estimated the decreases in productivities.

The Development of Probabilistic Time and Cost Data: Focus on field conditions and labor productivity

  • Hyun, Chang-Taek;Hong, Tae-Hoon;Ji, Soung-Min;Yu, Jun-Hyeok;An, Soo-Bae
    • Journal of Construction Engineering and Project Management
    • /
    • v.1 no.1
    • /
    • pp.37-43
    • /
    • 2011
  • Labor productivity is a significant factor associated with controlling time, cost, and quality. Many researchers have developed models to define methods of measuring the relationship between productivity and various parameters such as the size of working area, maximum working hours, and the crew composition. Most of the previous research has focused on estimating productivity; however, this research concentrates on estimating labor productivity and developing time and cost data for repetitive concrete pouring activity. In Korea, "Standard Estimating" only entails the average productivity data of the construction industry, and it is difficult to predict the time and cost spent on any particular project. As a result, errors occur in estimating duration and cost for individual activities or projects. To address these issues, this research sought to collect data, measure productivity, and develop time and cost data using labor productivity based on field conditions from the collected data. A probabilistic approach is also proposed to develop data. A case study is performed to validate this process using actual data collected from construction sites. It is possible that the result will be used as the EVMS baseline of cost management and schedule management.