The application study of preventive maintenance during normal operation for APR1400 nuclear power plants considering risk

  • Jung-Wun Kim;YoungJu Lee;Weon Gyu Shin
    • Nuclear Engineering and Technology
    • /
    • 제56권10호
    • /
    • pp.4327-4334
    • /
    • 2024
  • Preventive Maintenance(PM) for safety component during power operation at nuclear power plants, On-Line Maintenance(OLM) refers to intentionally entering the Limited Condition of Operation(LCO) specified in the Technical Specification(TS) for safety-related systems and components in order to perform preventive maintenance within the Allowed Outage Time (AOT). This study assessed the feasibility of conducting OLM at the domestic APR1400 nuclear power plant. It focused on preventive maintenance duration and risk perspectives. A total of 78 FEGs were developed for 4450 facilities, considering system functions and preventive maintenance scope during output operation for eight safety-related systems. Additionally, maintenance items included in FEGs were selected, designated as targets for OLM, and their maintenance durations were evaluated and compared with AOT for each maintenance item. As a result, the Auxiliary Feedwater and Essential Chilled Water systems were identified as systems allowing OLM. Furthermore, utilizing the Risk Monitoring System (RIMS), the increased risk value due to the unavailability of target equipment during preventive maintenance was analyzed to determine whether it falls within the acceptable range. Regarding the temporary risk increase caused by OLM, it was observed that in all systems, it falls within Zone III according to NUMARC93-01 standards, allowing for normal equipment arrangement for OLM. However, according to the risk increase standards rate in domestic nuclear power plants, when maintaining the A-train in four systems including Component Cooling Water, they are all evaluated as 'Orange,' indicating that measures for risk mitigation are necessary for OLM to be feasible. When considering extending AOT up to 1.6 times the maintenance time, the risk increase falls within Zone III according to permissible change in risk standards, indicating that AOT extension might be feasible based solely on risk changes. To apply OLM within the permissible risk management scope in domestic nuclear power plants, regulatory policies need to allow voluntary LCO entry for preventive maintenance, necessitating clear determination by regulatory agencies using risk-informed policies. While OLM seems viable concerning maintenance duration and quantitative risk aspects, for inducing regulatory policy changes, comprehensive OLM guidelines are necessary, including risk management strategies.

예방보전이 불완전할 때 최적 주기적 예방보전 계획 (Optimal Periodic Preventive Maintenance Schedule When Preventive Maintenance is Imperfect)

  • 김대경;신상욱;임재학
    • 품질경영학회지
    • /
    • 제35권4호
    • /
    • pp.140-146
    • /
    • 2007
  • In this paper, we consider a periodic imperfect preventive maintenance(PM) policy in which the system's failure rate after each PM remains unchanged. The system undergoes only minimal repairs at failures between PMs. Exact mathematical formula of the expected cost rate per unit time is derived. Optimal number of PMs and optimal maintenance period are derived by minimizing the expected cost rate per unit time. A numerical example is provided to illustrate the proposed approach under Weibull lifetime distribution.

대여장비의 신뢰도 기반 예방보전 정책을 통한 최적 의사결정 과정 개발 (Developing the Optimal Decision-Making Process through Preventive Maintenance Policy Based on the Reliability Threshold for Leased Equipment)

  • 배기호;이주현;박성환;안선응
    • 한국신뢰성학회지:신뢰성응용연구
    • /
    • 제17권3호
    • /
    • pp.246-255
    • /
    • 2017
  • Purpose: This study proposes the optimal PM (preventive maintenance) policy of leased equipment for lessee's decision-making using two types of reliability condition. Methods: We consider reliability threshold based PM model. Equipment reliability is estimated and used as condition variable. The effect of repair for maintenance is imperfect and represented by age reduction factor. Results: We provide two PM policies. Policy 1 is focused on minimized total cost. This policy guarantees reliability threshold until last maintenance action. Policy 2 focus on maintaining reliability threshold during leased period. The proposed approach provides optimal reliability threshold under number of PM. Through result, we finally construct decision-making process for lessee using reliability threshold and end of reliability. Conclusion: This study provides two PM policy for lessee's decision-making. Through numerical example, we get a result of optimal reliability threshold, number of PM, optimum alternative under lessee's reliability condition.

Optimal Schedules of Periodic Preventive Maintenance Model with Different PM Effect

  • Lim, Jae-Hak
    • International Journal of Reliability and Applications
    • /
    • 제9권1호
    • /
    • pp.113-122
    • /
    • 2008
  • In this paper, we consider a periodic preventive maintenance policy in which each preventive maintenance reduces the hazard rate of amount proportional to the failure intensity, which increases since the system started to operate. And the effect of preventive maintenance at each preventive maintenance epoch is different. The expected cost rate per unit time for the proposed model is obtained. We discuss the optimal number N of the periodic preventive maintenance and the optimal period x, which minimize the expected cost rate per unit time and obtain the optimal preventive maintenance schedule for given cost structures of the model. A numerical example is given for the purpose of illustrating our results when the failure time distribution is Weibull distribution.

  • PDF

Optimization of Cost and Downtime for Periodic PM Model Following the Expiration of Warranty

  • Jung, Ki-Mun
    • Journal of the Korean Data and Information Science Society
    • /
    • 제19권2호
    • /
    • pp.587-596
    • /
    • 2008
  • This paper develops the optimal periodic preventive maintenance policies following the expiration of warranty: renewing warranty and non-renewing warranty. After the warranty period is expired, the system undergoes the PM periodically and is minimally repaired at each failure between two successive PMs. Firstly, we determine the expected cost rate per unit time and the expected downtime per unit time for the periodic PM model. Then the overall value function suggested by Jiang and Ji(2002) is applied to obtain the optimal PM period and the optimal PM number. Finally, the numerical examples are presented for illustrative purpose.

  • PDF

Stochastic analysis of a non-identical two-unit parallel system with common-cause failure, critical human error, non-critical human error, preventive maintenance and two type of repair

  • El-Sherbeny, M.S.
    • International Journal of Reliability and Applications
    • /
    • 제11권2호
    • /
    • pp.123-138
    • /
    • 2010
  • This paper investigates a mathematical model of a system composed of two non-identical unit parallel system with common-cause failure, critical human error, non-critical human error, preventive maintenance and two type of repair, i.e. cheaper and costlier. This system goes for preventive maintenance at random epochs. We assume that the failure, repair and maintenance times are independent random variables. The failure rates, repair rates and preventive maintenance rate are constant for each unit. The system is analyzed by using the graphical evaluation and review technique (GERT) to obtain various related measures and we study the effect of the preventive maintenance preventive maintenance on the system performance. Certain important results have been derived as special cases. The plots for the mean time to system failure and the steady-state availability A(${\infty}$) of the system are drawn for different parametric values.

  • PDF

주기적인 예방보전정책의 베이즈 접근방법 (A Bayesian Approach to Periodic Preventive Maintenance Policy)

  • 한성실;정기문;권영섭
    • 품질경영학회지
    • /
    • 제29권3호
    • /
    • pp.39-48
    • /
    • 2001
  • Preventive maintenance(PM) is an action taken on a repairable system while it is still operating, which needs to be carried out in order to keep the system at the desired level of successful operation. In this paper, we consider a Bayesian approach to determine an optimal periodic preventive maintenance policy. When the failure time is Weibull distribution with uncertain parameters, a Bayesian approach is established. Some numerical examples are presented for illustrative purpose.

  • PDF

Integrating Machine Reliability and Preventive Maintenance Planning in Manufacturing Cell Design

  • Das, Kanchan;Lashkari, R.S.;Sengupta, S.
    • Industrial Engineering and Management Systems
    • /
    • 제7권2호
    • /
    • pp.113-125
    • /
    • 2008
  • This paper presents a model for designing cellular manufacturing systems (CMS) by integrating system cost, machine reliability, and preventive maintenance (PM) planning. In a CMS, a part is processed using alternative process routes, each consisting of a sequence of visits to machines. Thus, a level of 'system reliability' is associated with the machines along the process route assigned to a part type. Assuming machine reliabilities to follow the Weibull distribution, the model assigns the machines to cells, and selects, for each part type, a process route which maximizes the overall system reliability and minimizes the total costs of manufacturing operations, machine underutilization, and inter-cell material handling. The model also incorporates a reliability based PM plan and an algorithm to implement the plan. The algorithm determines effective PM intervals for the CMS machines based on a group maintenance policy and thus minimizes the maintenance costs subject to acceptable machine reliability thresholds. The model is a large mixed integer linear program, and is solved using LINGO. The results point out that integrating PM in the CMS design improves the overall system reliability markedly, and reduces the total costs significantly.

A Bayesian Approach to PM Model with Random Maintenance Quality

  • Jung, Ki-Mun
    • Journal of the Korean Data and Information Science Society
    • /
    • 제18권3호
    • /
    • pp.689-696
    • /
    • 2007
  • This paper considers a Bayesian approach to determine an optimal PM policy with random maintenance quality. Thus, we assume that the quality of a PM action is a random variable following a probability distribution. When the failure time is Weibull distribution with uncertain parameters, a Bayesian approach is established to formally express and update the uncertain parameters for determining an optimal PM policy. Finally, the numerical examples are presented for illustrative purpose.

  • PDF

Quasi-renewal 이론을 이용한 발전설비의 불완전한 유지보수 예방정비 계획 (Imperfect Preventive Maintenance Plan of Generation Unit Using Quasi-renewal Theory)

  • 김형준;변융태;김진오;이준경
    • 전기학회논문지
    • /
    • 제57권5호
    • /
    • pp.735-740
    • /
    • 2008
  • Recently, the research of PM (Preventive Maintenance) method on the RCM(Reliability-Centered Maintenance) of the system equipment is being actively advanced for a few years. For the most of the current power equipment maintenance, the state of the equipment after maintenance is assumed to be becoming 'as good as new ones' state. However, the state of the power equipment is maintained like the states of the between 'as good as new ones' and 'as bad as old ones' by imperfect maintenance that implies the life decrease of the equipment by frequent breakdown, the error of maintenance process, and so on. So, the Maintenance method considering the real case has to reflect Imperfect maintenance than perfect maintenance. This paper suggests the Preventive Maintenance method by using Quasi - Renewal Theory for the gas turbine equipment as deliberating the imperfect maintenance for the real cases.