• Title/Summary/Keyword: Preliminary Feasibility

Search Result 391, Processing Time 0.034 seconds

A Study of Noise Elect for Selecting Eco-friendly Railways (철도노선 선정에 미치는 소음에 관한 연구)

  • Park, Byung-Eun;Kim, Myeong-Gyu;Han, Sung-Woo;Kim, Dong-Gi;Park, Kwang-Heyun
    • Proceedings of the Korean Society for Noise and Vibration Engineering Conference
    • /
    • 2006.11a
    • /
    • pp.244-247
    • /
    • 2006
  • Railway is superior to the other land transportation systems in aspects of energy efficiency and environmental problems. Energy efficiency and environmental problems are not considered during a preliminary feasibility study. Investment for railway is low because of low B/C in the economical efficiency analysis during the preliminary feasibility study. The body of this paper studies the data which can reflect environmental problems an assessment of environmental impact. Investment for railway would be higher when main environmental elements are considered before the choice of the railway lines.

  • PDF

A Study of the Benefit Cost of The Railway Nosie (철도소음의 편익비용 추정)

  • Park, Byung-Eun;Jang, Bong-Hee;Han, Sung-Woo;Kim, Dong-Gi;Park, Kwang-Heyun
    • Proceedings of the Korean Society for Noise and Vibration Engineering Conference
    • /
    • 2006.05a
    • /
    • pp.1465-1468
    • /
    • 2006
  • Railway is superior to the other land transportation systems in aspects of environmental problems. Environmental problems are not considered during a preliminary feasibility study. Investment for railway is low because of low B/C(benefit/cost)ratio in the economical efficiency analysis during the preliminary feasibility study. The body of this paper studies the railway noise which can reflect environmental problems an assessment of environmental impact. The body of this paper studies the presumption of The Benefit Cost of railroad noise arresting it will be able to reflect the evaluation environmental matter of the effect which it gives to an environment.

  • PDF

A Case Study on the Cost-Effectiveness Analysis for the Feasibility Study of Public Project Related to Personal Information Protection (개인정보보호 관련 공공사업의 타당성 조사를 위한 비용효과분석 사례 연구)

  • Jo, Illhyung;Kim, Jin;Yoo, Jinho
    • Knowledge Management Research
    • /
    • v.20 no.3
    • /
    • pp.91-106
    • /
    • 2019
  • In the era of the 4th Industrial Revolution, the importance of information protection is increasing day by day with the advent of the 'hyper-connection society', and related government financial investment is also increasing. The source of the government's fiscal investment projects is taxpayers' money. Therefore, the government needs to evaluate the effectiveness and feasibility of the project by comparing the public benefits created by the financial investment projects with the costs required for it. At present, preliminary feasibility study system which evaluates the feasibility of government financial investment projects in Korea has been implemented since 1994, but most of them have been actively carried out only in some fields such as large SOC projects. In this study, we discuss the feasibility evaluation of public projects for the purpose of information security. we introduce the case study of the personal information protection program of Korean public institutions and propose a cost-effectiveness analysis method that can be applied to the feasibility study of the information protection field. Finally, we presented the feasibility study and criteria applicable in the field of information security.

A Study on Refinement of Benefit Evaluation Methods for Preliminary Feasibility Study of Port Construction (항만건설 예비타당성 조사의 편익 산정 개선에 대한 연구)

  • Shin, Seungsik
    • Journal of Korea Port Economic Association
    • /
    • v.31 no.4
    • /
    • pp.17-38
    • /
    • 2015
  • The purpose of this study is to suggest new methods for evaluating the benefits of a preliminary feasibility study for port construction. For this purpose, this study analyzes the problem of barge loading and unloading systems, and suggests new methods such as using neighboring same kinds of ports first. The study also estimates the benefits for ports that have been evaluated by the existing theory, using the newly suggested methods. The result suggests that there is a possibility to reduce the level of economic feasibility for both general and container-exclusive ports by applying the newly suggested methods.

A Study on Meta Analysis of Preliminary Feasibility for Government R&D Programs to Improve Planning Project of the Government Funded Research Institutes (정부출연연구기관 주요사업 연구기획 강화를 위한 예비타당성조사 사업 메타분석연구)

  • Lee, Jong-Won
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.18 no.11
    • /
    • pp.445-453
    • /
    • 2017
  • The Korean government's recent R&D policy has focused on encouraging government-funded research institutes (GRIs) to develop mid-term, long-term, and large-scale R&D projects. It is necessary to prepare thoroughly for the new R&D strategy, but there is no systematic accumulation of planning expertise, and there has been continued demand for good examples of research planning. Therefore, this study analyzes the reports of preliminary feasibility for government R&D programs through a meta-analysis of detailed evaluation items and contents to help researchers enhance their project-planning ability. The evaluation items that can be applied to R&D planning for GRI were reviewed, and twelve detailed evaluation items were selected through content analysis. The results of this study could contribute to practical R&D project planning and the improvement of evaluations.

Exploration of Life-cycle Management for Government R&D Program: the Case of Preliminary Feasibility Study on R&D Program (국가연구개발사업의 전주기 관리방안 탐색: 연구개발 부문 예비타당성조사 제도를 중심으로)

  • Ahn, Sang-Jin;Park, Eun-Ji;Lee, Yoon Been
    • Journal of Korea Technology Innovation Society
    • /
    • v.17 no.1
    • /
    • pp.124-145
    • /
    • 2014
  • Market failure occurs when Pareto efficiency is not achieved through market mechanism. In order to solve this problem, government intervene market; paying great attention to the optimum state of resource allocation. However, as the size of government investment in R&D goes up, many professionals emphasize the importance in efficient management system. This work is the result of exploratory study to look into life-cycle management of governmental R&D program. Literature reviews and empirical research on governmental R&D programs elicit improvements for effective life-cycle management of governmental R&D program as follows: consistent discrimination between capital expenditure and recurring expenditure, dual management system by spending properties, implementing total cost management system in capital expenditure, and discrimination between preliminary feasibility study with confirming total program cost in recurring expenditure.

Economic Analysis of Zero Energy Building in South Korea - focusing on Cost-Benefit analysis considering Social Cost - (공사비 변화에 따른 제로에너지건축물 경제성 분석 - 사회적비용을 고려한 비용편익 분석을 중심으로 -)

  • Kim, Jae-Moon
    • Journal of the Architectural Institute of Korea Structure & Construction
    • /
    • v.36 no.3
    • /
    • pp.147-157
    • /
    • 2020
  • With the increasing obligation to reduce greenhouse gas emissions to the building sector, the government has been gradually expanding its obligation to zero-energy buildings since 2020. Since the ZEB certification took effect in 2017, 48 preliminary and main certifications have been completed as of March 2019, and most of them are public buildings or even certified, but have earned Grade 5 of ZEB. This means that compared with the number of annual building permits registered in Korea, the figure is insignificant, and that it receives little if not mandatory. Therefore, this study investigated empirical cases of ZEB additional construction cost and conducted cost benefit analysis according to changes in ZEB additional construction cost based on a preliminary feasibility analysis project recently conducted by the KDI. In addition, considering the public buildings, the social costs were considered, and the cost-benefit analysis method was the same as the KDI's preliminary feasibility analysis method. The analysis shows that if the ratio of ZEB additional construction cost is more than 5 percent, it is analyzed that there is no economic feasibility, and considering that the ratio of additional construction cost in the cases of ZEB in Korea is 17 percent to 38 percent, it will not be easy to obtain ZEB certification in terms of cost. Finally, to narrow these differences in cost and economic aspects, the overseas low energy and ZEB incentive examples proposed measures such as the concept of subsidy payment in Illinois and the compensation of social costs to private ZEB.

Development of bonding processes for micro-optical and thermo-fluidic components (광/열유체 부품의 접합공정 개발)

  • 김정호;이지혜;유중돈;최두선
    • Proceedings of the Korean Society of Precision Engineering Conference
    • /
    • 2002.10a
    • /
    • pp.137-140
    • /
    • 2002
  • The main objectives in the first year include selection of the MEMS bonding methods and feasibility study of selected methods. The ultrasonic bonding method is chosen for MEMS packaging, and the processes to provide localized heating are proposed. The ultrasonic bonding process is analyzed using a lumped model. Preliminary experiments using the eutectic solder and copper pin were performed to verify possibility to MEMS packaging. The preliminary results show possibility of the ultrasonic bonding method for MEMS packaging.

  • PDF