• 제목/요약/키워드: Precast concrete beam

검색결과 211건 처리시간 0.022초

신구콘크리트 계면의 인장강도에 관한 실험 연구 (An Experimental Study on the Tensile Strength between O1d and New Concrete)

  • 양인환;김학수;조서경
    • 한국콘크리트학회:학술대회논문집
    • /
    • 한국콘크리트학회 2001년도 가을 학술발표회 논문집
    • /
    • pp.433-438
    • /
    • 2001
  • In recent years, the construction methods of precast prestressed concrete beam bridges by using tendon have been increasingly proposed. The properties of flexural tensile strength between precast prestressed concrete beam and cast-in-place concrete is an important factor that affects the structural performance. This paper aims at evaluating the tensile strength between old and new concrete. Tensile strength gain, with age after placing new concrete was evaluated. Test results show that the tensile strength between old and new concrete is much smaller than that of monolithic concrete. Also, it is shown that the curing condition of concrete has the tremendous effect on tensile strength.

  • PDF

L형 프리캐스트 콘크리트 벽패널로 채운 기존 철근 콘크리트 골조 구조물의 휨 거동 분석 (Analysis on the Flexural Behavior of Existing Reinforced Concrete Frame Structures Infilled with L-Type Precast Wall Panel)

  • 유승룡;주호성;손국원
    • 복합신소재구조학회 논문집
    • /
    • 제6권2호
    • /
    • pp.52-62
    • /
    • 2015
  • This study aims at developing a new seismic resistant method by using precast concrete wall panels for existing low-rise, reinforced concrete beam-column buildings such as school buildings. Three quasi-static hysteresis loading tests were performed on one unreinforced beam-column specimen and two reinforced specimens with U-type precast wall panels. Top shear connection of the PC panel was required to show the composite strength of RC column and PC wall panel. However, the strength of the connection did not influence directly on the ultimate loading capacities of the specimens in the positive loading because the loaded RC column push the side of PC wall panel and it moved horizontally before the shear connector receive the concentrated shear force in the positive loading process. Under the positive loading sequence(push loading), the reinforced concrete column and PC panel showed flexural strength which is larger than 97% of the composite section because of the rigid binding at the top of precast panel. Similar load-deformation relationship and ultimated horizontal load capacities were shown in the test of PR1-LA and PR1-LP specimens because they have same section dimension and detail at the flexural critical section. An average of 4.7 times increase in the positive maximum loading(average 967kN) and 2.7 times increase in the negative maximum loading(average 592.5kN) had resulted from the test of seismic resistant specimens with anchored and welded steel plate connections than that of unreinforced beam-column specimen. The maximum drift ratios were also shown between 1.0% and 1.4%.

관통형 연결재로 연결된 PC 보-기둥 맞댐 접합의 내진성능에 관한 실험적 연구 (Seismic Performance of Precast Beam-Column Joints with Thru-Connectors)

  • 박순규;김민희
    • 콘크리트학회논문집
    • /
    • 제22권4호
    • /
    • pp.441-450
    • /
    • 2010
  • 건식공법이 가능하도록 기존의 접합 방식과 차별화 되는 PC 보-기둥 접합부를 개발하여 실용화하기 위한 기초 연구이다. 연속된 PC 기둥 양편에 위치한 보의 접합 단부를 고강도 관통형 연결재로 긴장하여 연결하는 'PC 보-기둥 맞댐 접합(BCJ_TB : precast beam column joints connected with thru-connects)'을 고안하고 실험적 연구를 수행하여 강도저하, 초기강성, 강성저하, 에너지소산능력 등의 내진성능을 분석하였다. 실험 결과에 기둥에서는 손상이 발생하지 않고 보 단부에서 압축파괴가 발생하는데, 이는 비부착 연결재의 초기긴장과 비부착 효과에 의하여 보 단부 콘크리트에 압축응력이 증가하기 때문인 것으로 분석되었다. 보 접합 단부에 CFRP로 구속 효과를 준 접합부의 성능이 상대적으로 우수하였고 네오프렌 패드로 보 기둥 접합면을 연결한 것이 다른 것에 비하여 초기강성을 제외하고는 우수한 내진성능을 보이는 것으로 분석되었다. 비부착 연결재를 사용한 접합부의 파괴모드를 개선하기 위하여 보 단부 콘크리트의 압축 성능을 향상시키고, 연결재의 변위를 적절히 조절할 수 있는 방법이 요구된다.

반복하중을 받는 프리캐스트 콘크리트 건식 보-기둥 연결부의 거동분석 (Analysis on the Behaviors of Precast Concrete Beam-Column Connections Subject to Cyclic Loading)

  • 송형수;유승룡
    • 콘크리트학회논문집
    • /
    • 제18권4호
    • /
    • pp.497-506
    • /
    • 2006
  • 본 연구에서는 주상복합건물에 적용가능한 건식공법에 의한 프리캐스트 콘크리트 보-기둥 연결부에 대하여 실험을 통하여 분석하였다. 현재 국내에 활용하고 있는 프리캐스트 콘크리트 보-기둥 연결부와 현재 미국에서 사용되고 있는 DDC 연결부, 그리고 DDC 연결부와 개선된 연결부에 포스트텐션을 도입한 시험체를 제작하였고, 실험을 통하여 그 거동을 평가하였다. 실험 결과 보-기둥 연결부에 DDC 시스템을 적용하게 되면 연결부의 강도와 연성능력의 향상을 기대할 수 있었으나 파괴 메커니즘이 보에 에너지를 분산시키지 않고, 연결부에서 사인장 균열에 의하여 에너지를 소산시키게 되어 연결부가 파괴되는 단점이 나타났다. 개량 DDC 연결부는 기둥에 사인장균열이 발생하지 않고 보다 연성적인 파괴거동을 보여주었다. 또한 보-기둥 연결부에 포스트텐션의 도입은 연결부 강도의 증가는 크게 기대할 수 없었으나 자가조정(self-centering) 등을 통하여 연결부의 안정성 및 연성능력에 기여하는 것으로 나타났다.

볼트 접합 및 프리스트레스를 적용한 프리캐스트 콘크리트 보-기둥 외부접합부의 내진실험 (Seismic Experiment of Precast Concrete Exterior Beam-Column Joint Using Bolt Type Connection and Prestressing Method)

  • 이동주;이주동;오태수;강현구
    • 콘크리트학회논문집
    • /
    • 제26권2호
    • /
    • pp.125-133
    • /
    • 2014
  • 이 연구에서는 볼트접합 및 프리스트레스를 적용한 프리캐스트 콘크리트 보-기둥 외부접합부의 내진 및 구조적 성능을 평가하였다. 총 5개의 보-기둥 외부접합부 실험체를 제작하고 보 단부에 변위제어 방식으로 반복하중을 가하며 실험을 수행하였다. 이 연구의 결과를 근거로 다음과 같은 결론을 얻을 수 있었다. 완전 건식공법이 적용된 PC 접합부는 완전 습식공법이 적용된 RC 접합부보다 에너지소산이나 핀칭현상에 있어서 불리한 거동을 보였지만 이는 설계과정에서 의도된 현상이며, 횡변형 능력에 있어서는 우수한 결과를 보였다. 또한 층간변위비 4%까지 횡하중 저항성능의 손실이 발생하지 않았고 매설용너트에 항복이 집중되는 메커니즘을 보이는 점으로 미루어 볼 때 개발된 접합부는 외부접합부 횡저항시스템으로서 적합한 것으로 사료된다. 추가적인 프리스트레스는 PC 접합부의 과도한 핀칭현상 방지 및 접합부 균열제어에 효과적이었으며 PC 접합부의 전체적인 내진성능을 향상시켰다.

In-situ Production Analysis of Composite Precast Concrete Members of Green Frame

  • Lim, Chae-Yeon;Joo, Jin-Kyu;Lee, Goon-Jae;Kim, Sun-Kuk
    • 한국건축시공학회지
    • /
    • 제11권5호
    • /
    • pp.501-514
    • /
    • 2011
  • Recently, there have been many cases in which the difficulty of repair and replacement of principal elements in the bearing wall structure for apartment buildings, which is a major part of apartment buildings in Korea, has led to the reconstruction of buildings rather than their remodeling. To address this problem, the Korea government now allows a floor area ratio of up to 20 %, and has relaxed the building height limits to encourage the use of a rahmen structure instead of a bearing wall structure. However, since reinforced concrete rahmen structures have many problems, including higher floor height and greater construction cost, a great deal of research into rahmen composite precast concrete structures have been conducted. Green Frame, one of the developed prototypes, is expected to provide economic benefits through in-situ production for precast concrete column and beam. For in-situ production of composite precast concrete members, a detailed plan for production, curing, and installation is needed. However, it needs to be confirmed that the space is sufficient to produce the precast concrete members on-site before planning those activities. Therefore, this study proposes in-situ production analysis of composite precast concrete members of Green Frame with the evaluation of structural safety and available area on the parking structure. The result of this study shows that the in-situ production of precast concrete members is possible through a case study.

볼트 접합형 철근 이음장치 개발을 위한 요구조건 분석 (Requirement analysis for Development of the Bolt-type Rebar Coupler)

  • 임채연;주진규;이군재;김선국
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2011년도 추계 학술논문 발표대회
    • /
    • pp.169-170
    • /
    • 2011
  • In the connection of green frame, the bottom rebar of the precast concrete beam needs joint or anchorage to ensure structural integrity. However, given the characteristics of composite precast concrete joint, enough length over which rebar can be anchored or lap-spliced is not secured. In addition, due to issues with constructability, cost or quality, it is difficult to apply welding or mechanical connection techniques. Therefore, this study analyze the requirement for a bolt-type rebar coupler as a solution for the coupling issue between the lower rebars of green frame beam. The requirement for bolt-type rebar coupler proposed herein will provide basic data for development studies of the rebar coupler.

  • PDF

보-기둥구조 PC공동주택 시공관리를 위한 골조공사 ADM공정표 작성 (Writing ADM Network Diagram of Frame Work for the Precast Concrete Public Apartment Building Construction Management)

  • 김기호;김민준;김진원;이동건;손정락;이범식
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2022년도 가을 학술논문 발표대회
    • /
    • pp.221-222
    • /
    • 2022
  • In this study, the work flow of the construction process was analyzed based on construction monitoring for a building of the middle size beam-column system Precast Concrete(PC) apartment building supplied by LH, and the Arrow Daigram Method(ADM) network diagram of its construction was written. The results of this study are judged to be able to improve productivity by using the PC structure apartment building construction plan to calculate a reasonable construction period and prepare a process management method for the PC structure frame construction.

  • PDF

합성 PC부재의 Steel-joint Connection Method 개발 기초연구 (A basic study of steel-joint connection method of composite precast concrete members)

  • 김근호;이동훈;김선국
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2013년도 춘계 학술논문 발표대회
    • /
    • pp.10-11
    • /
    • 2013
  • Green Frame is a column-beam system formed by composite precast concrete column and beam connected with steel buried in both members. During the installation of Green columns, the columns of Green Frame, covering 3 floors per each piece and beams, the eccentricity can be observed due to the construction error and the weight of beam itself. Such eccentricity may have a little influence on a single frame, yet, it can develop critical issues to the installation of subsequent beams or beams on the upper floors in the context of a building as a whole that has multiple frames. These issues lead to delay in frame installation, decrease of productivity and increase of cost, etc. Therefore, this study presents a steel-joint connection method in order to solve the issues. The steel-joint connection method exists on slope plane and reinforcing plate in steel frame buried in composite PC members. Through this method, the issues can be resolved without requiring additional equipment or manpower.

  • PDF

Flexural Behavior of Continuous Composite Bridges with Precast Concrete Decks

  • Chung, Chul-Hun
    • 콘크리트학회논문집
    • /
    • 제15권4호
    • /
    • pp.625-633
    • /
    • 2003
  • For the construction of open-topped steel box girder bridges, prefabricated concrete slab could offer several advantages over cast-in-situ deck including good quality control, fast construction, and elimination of the formwork for concrete slab casting. However, precast decks without reinforcements at transverse joints between precast slabs should be designed to prevent the initiation of cracking at the joints, because the performance of the joint is especially crucial for the integrity of a structural system. Several prestressing methods are available to introduce proper compression at the joints, such as internal tendons, external tendons and support lowering after shear connection. In this paper, experimental results from a continuous composite bridge model with precast decks are presented. Internal tendons and external tendons were used to prevent cracking at the joints. Judging from the tests, precast decks in negative moment regions have the whole contribution to the flexural stiffness of composite section under service loads if appropriate prestressing is introduced. The validity of the calculation of a cracking load fur serviceability was presented by comparing an observed cracking load and the calculated value. Flexural behavior of the continuous composite beam with external prestressing before and after cracking was discussed by using the deflection and strain data.