Park Jeong Wha;Kim Kwang Soo;Sim Chungwook;Yoon Chul-Soo
Proceedings of the KSR Conference
/
2004.06a
/
pp.1168-1173
/
2004
Bridges and tunnels mainly compose the structural system of Kyung-bu high-speed railway in Korea and the prestressed concrete box girder bridges are applied for the most part of bridge structures. Precast full span construction method was practiced in the construction of many prestressed concrete box girder bridges in Kyung-bu high speed railway for the high quality, great construction speed, low construction cost and construction safety. However, there have been no application of this method in continuous bridges until now. Therefore, a new advanced precast full span construction method is developed using pre-tensioning for precast and post-tensioning in alternating the simple span into a continuous bridge system. since the high-speed railway trains can cause dynamic problems in a continuous bridge. This study shows the structural behavior and the construction process of the new advance method.
Journal of Construction Engineering and Project Management
/
v.2
no.3
/
pp.40-47
/
2012
Construction management is essential for a achieving any pre-determined objective. It is however seen that in spite of construction management, majority of the project do not keep up their original time schedule and their completion cost is also higher as compared with the estimated cost The main reason for overrun in time and cost is that the planning at the outset of the project was not adequate or method of planning was not a refined one. In this research work, I showed the overall conditions of construction work and management in Sylhet city of Bangladesh and found many drawbacks in the construction management after completing my research. I found several factors affecting proper construction management and I have provided brief results. I have also provided some recommendations after my research work.
Proceedings of the Korean Institute of Building Construction Conference
/
2018.11a
/
pp.128-129
/
2018
With the increase of tall building construction, efforts for enhancing constructability are required from the pre-construction stage. Therefore, in this study, we proposed an evaluation method of constructability performance by performing construction engineering activities at the design phase. Based on some results of previous studies, we estimated the importance of design factors and categories influencing the constructability in each engineering activity related to temporary work and then presented a method for evaluating the constructability performance of design alternatives.
Journal of The Geomorphological Association of Korea
/
v.24
no.1
/
pp.13-24
/
2017
This study analyzes altitude changes of riverbed at 6 bridges in the upper and lower reaches of Yeongju Dam in Naeseong River, from 2009 to 2016 just before and after the dam construction. For 5 years from November 2010 to December 2015 when the dam was under construction, approximately 0.091m of the riverbed altitude in average more than twice before the dam construction was lowered, because of the effects of riverbed excavation for riverside maintenance in the upper reaches and transport limitation of flow and sediment by the dam in the lower reaches. Between November 2009 and December 2016 when the dam was in pre-construction and post-construction stages, respectively, the most sites in this study in the upper and lower reaches showed lowering in the riverbed altitudes. On the other hand, the riverbed around Hoeryongpo closed to the river mouth seems to be influenced by channel changes in Nakdong River rather than by the dam construction.
The purpose of this study is to develop a device to replace the pre-boring method, which is generally constructed, to prevent pile damage caused by tension cracks that reason from tension waves generated during PHC pile construction on soft ground. Tension cracks are caused by tension waves from the hammer striking during the PHC pile hitting on the soft ground, which in turn leads to faulty construction. In order to prevent the occurrence of tension waves generated during driving, apply separate driving force increasing device to prevent the generation of tension waves, and pile damage as well. Also, it is an eco-friendly construction method that reduces smoke and noise by improving construction speed, reducing construction costs, and able to small equipment when developing equipment. This development equipment is a piece of effective equipment that can pioneer the Saemangeum reclamation area, the South-east Asian construction market, where the Deep soft ground is distributed.
Because the regulation for a noise and a vibration in our country has been being reinforced more and more, a more environment-friendly pile construction method than a current low-noise and low-vibration method was needed for the close construction in the downtown area. In this study, the characteristics of a screw concrete pile method for noise and vibration-free method was explained, and it's vertical bearing capacity was studied in the base of the static pile load test data of the screw concrete piles. Constructed by two methody; a pre-digging shoe type construction method and a toe-jetting shoe type construction method. The vertical load bearing capacity of a screw pile constructed by the former was more about 70% than that of a screw pile constructed by the latter.
Proceedings of the Korean Institute of Building Construction Conference
/
2023.11a
/
pp.19-20
/
2023
The pre-qualification system related to floor impact noise is considered ineffective, and thus, the introduction of a post-verification system is being prepared. This is because the performance, which was notarized in the qualification test due to various reasons, was not uniformly confirmed on building construction fields. Industry practitioners perceive that this is due to the influence of factors such as the flatness, levelness and/or thickness of the floor. However, it is very difficult to confirm such facts in a short period of time on the fields, and since the practical application of technology to measure and evaluate quantitatively and the establishment of a system are insufficient, it cannot be said to be a problem that can be brought to the surface. In fact, even when considering the conventional measurement of the dynamic modulus of elasticity, measurements are performed under controlled variables, such as placing a 200mm×200mm buffer material on a flat test-floor. However, in the fields, it is common to lay down larger productions(for example, 900mm×600mm) on the bare floor where significant variables are not controlled, and to construct finishing layers corresponding to the pre-qualified floor system without separately confirming the realization of the dynamic modulus of elasticity in the field conditions. In this study, spatial information of the bare floor on the field was measured and evaluated through a laser scanner. Technical methods for assessing the smoothness, flatness, and thickness of construction surfaces were reviewed, providing key insights for grading the quality of construction based on these criteria. Through further detailed and thorough investigations, it is expected that results suitable for practical application and systematization will be derived.
When planning gripper TBM, which is highly applicable to urban areas, the excavation characteristics are not considered. In addition the excavation stability and constructability are degraded by installing reinforcements in the adjacent construction site considering the relaxation load theory of the pre-existing NATM. In this study, a rationalization plan for the support was proposed considering the excavation characteristics of gripper TBM when planning reinforcements for adjacent pre-existing construction. The effect of excavation on the surrounding ground was analyzed by conducting three-dimensional stability analyses considering the construction stage for each excavation phase. In NATM, relaxation phenomenon is concentrated in tunnel face due to non-supporting time occurring simultaneously with excavation, but gripper TBM supports the ground around the tunnel face through the cutter head and skin plate, simultaneously causing ground relaxation behind the skin plate. Considering these excavation characteristics, problems in reinforcement planning for adjacent construction at the study site were pointed out. A performance improvement plan for a reasonable supporting system was proposed.
Kim, Sang-Seok;Jang, Yong-Gu;Choi, Su-Geun;Kang, In-Joon
Journal of Korean Society for Geospatial Information Science
/
v.13
no.3
s.33
/
pp.69-77
/
2005
Most of the evaluations of environmental effect of construction of road do not run parallel with the evaluation of the propriety of the business, but it just reviews how to reduce contamination before the beginning of the construction work. This reveals the limitation of the induction of environment friendly development from the fundamental. In this study, a function of GIS spatial analysis for 9 elements of pre-evaluation of environmental effect has been introduced, and a GIS decision making system for environmental effect of a road has been established for an integrated evaluation by using individual evaluation result. By using GIS decision making system for pre-evaluation of environmental effect that has been developed in this study and the GIS data that has been collected, it would be possible to decrease time and money for evaluation as well as fulfill the requirement of objectivity. Therefore, it would be possible to apply for pre-evaluation of environmental effect when deciding on the route of the road at the beginning stage of the construction work. Also, through the system developed in this study, the construction body could easily induce a mutual agreement with the residents by the visual evaluation material, which might result in an evaluation of environmental effect while decreasing time and money at the beginning stage of the construction.
Recent application researches on external pre-stressing method of composite structures have been conducted to explore its advantages. An external pre-stress could improve mechanical behavior and maintenance, and is economically efficient. In this paper, the Incremental Deformation Method (IDM) was proposed to analyze the elasto-plastic flexural behavior of externally pre-stressed composite bridge with consideration for the material's nonlinearity. This method was verified with experimental results.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.