• Title/Summary/Keyword: Pre-Founded Columns

Search Result 6, Processing Time 0.1 seconds

Specificity of Prefounded Column for Top-Down Construction (Top-Down 공사용 선기초기둥의 특성)

  • Kang, Seung-Ryong;Rhim, Hong-Chul;Kim, Seung-Weon;Park, Dae Young;Kim, Dong-Gun;Song, Jee-Yun;Jeong, Mee-Ra
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2008.11a
    • /
    • pp.135-139
    • /
    • 2008
  • For deep basement construction of buildings downtown, the usage of Top-Down Method is increasing as much as ever from strong demand. One of the essential elements for the construction by Top Down Method is the pre-founded columns, which are installed in the ground and on which a building is installed. The fact that the pre-founded columns are placed in the ground makes them susceptible to its plumbness; this aspect distinguishes pre-founded columns from general columns. However, there are no criteria for erection tolerance. Therefore, field-measured-data concerning out-of-plumb of pre-founded columns in the construction field should be accumulated and investigated so that criteria and specifications for the erection tolerance of pre-founded columns may be established through the understanding of its aspects. In this paper, we investigate out-of-plumb of pre-founded columns for the construction case and analyze its aspects, and propose considerations for design and construction phase.

  • PDF

Use of Concrete Filled Tube as a Pre-founded Column for Top Down Construction (Top Down 공사에서의 CFT 선기초기둥 활용방안)

  • Kang, Seung-Ryong;Rhim, Hong-Chul;Kim, Seung-Weon;Kim, Dong-Gun;Song, Jee-Yun;Jeong, Mee-Ra;Lee, Hai-Chool
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2008.05a
    • /
    • pp.31-34
    • /
    • 2008
  • Construction of buildings downtown is increasing as much as ever with a strong demand. A Top-Down Method is suitable for its advantage in minimizing its disturbance to the neighborhood. In general, the Pre-founded Column, one of the most important aspects of the Top-Down Method, has been made with an H-Shape Steel Column. However, due to its structural and economical benefits, the usage of CFT(Concrete Filled Tube) columns in the place of Pre-founded Columns is increasing. To promote their applications, we analyze the merits of CFT columns by comparing them with I-Shape columns and propose further research.

  • PDF

A Study on Bearing Capacity of Cast-In-Place Pre-Founded Columns in Top Down Construction Sites (Top Down 공사현장에 적용되는 현장타설 선기초기둥의 지지력에 관한 연구)

  • Byun, Yoseph;Jung, Kyoungsik;Kim, Jongho;Chun, Byungsik
    • Journal of the Korean GEO-environmental Society
    • /
    • v.12 no.12
    • /
    • pp.55-61
    • /
    • 2011
  • Recently, a concept of the downtown area was progressively extended by improvement of rapid transportation system and development of the most advanced telecommunication industries. And underground has become bigger in addition deeper, Excavation methods which construct a structure were changed according to construction environments. Top Down methods which are continuous with architectural plan differ from existing excavation methods innovatively, pre-founded column is an important factor for construction methods, duration, expenses. Therefore, this study considers application by investigative methods according to comparison, analysis on loading test result of on site inspection and estimated results of bearing capacity for structure pre-founded column. As a result, almost designing eclipse appeared prior value which didn't arrive result of load test. Also, evaluate permanent load for the compressive stress acting on head of cast-in-place after basic structure was installed. Then, applying stress generally is reduced by confining effect with foundation.

Development of Top-Down Connection System to Solve the Problem of Construction Tolerances in Installing Prefabricated Beams to Pre-founded Columns (시공오차가 있는 선기초기둥에 공장제작보의 설치가 용이한 탑다운공사용 접합기술개발)

  • Kim, Seung-Weon;Jung, Hee-Weon;Park, Dae-Yung;Kim, Dong-Gun;Park, Joo-Hyun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2011.05b
    • /
    • pp.25-30
    • /
    • 2011
  • Almost prefounded columns for top-down construction certainly have construction tolerances in plan and plumbness. Therefore, it is very difficult to connect prefabricated beams to prefounded columns at each floor level after excavation by usual top-down connection method and this usual connection method leads to long construction time, increasing cost and decreasing quality. This paper presents a new method for connecting prefabricated beam to prefounded column with GROUT-JACKET CONNECTION SYSTEM consisting of sleeve, bearing-shear bands and grout. Details and illustrations of the connections and applications by GROUT-JACKET CONNECTION SYSTEM for the top-down construction are also included in this paper.

  • PDF

Structural Behavior Analysis of Concrete Encased and Filled tube Square Column with Construction Sequence (시공단계를 고려한 피복충전형 콘크리트충전 각형기둥의 구조적 거동 분석)

  • Kim, Sun Hee;Yom, Kong Soo;Choi, Sung Mo
    • Journal of Korean Society of Steel Construction
    • /
    • v.27 no.1
    • /
    • pp.43-52
    • /
    • 2015
  • Constructions of buildings downtown are increasing as much as ever with a strong demand. Top-Down Method is suitable for its advantage in minimizing its disturbance to the neighborhood. Pre-founded when applied to CFT Column on-site welded is required for splicing. To complement the welded built-up square composite Column was developed. Top-down process will be pouring concrete in accordance with a step-by-step process. Thus, Pre-founded Column and cover concrete to determine the stress condition. Therefore, Concrete filled steel square tubular columns encased with precast concrete were studied. Five Centrally loaded Columns were tested to investigate the axial load carrying capacity. we analyzed the strength and behavior of CET Column by Loading conditions and concrete strength, thickness of cover concrete through structure experiments.

DEVELOPMENT OF CONCRETE FILLED TUBE AS A PILLAR PILE FOR TOP DOWN METHOD

  • Jee-Yun Song;Hong-Chul Rhim;Seung-Weon Kim
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.808-813
    • /
    • 2009
  • Top-down method is widely used for urban area construction for its advantages in reducing environmental problems such as dust and noise, and saving construction cost depending on given conditions of a construction site. Because the excavation and construction of super- and sub-structures of the building have to be proceeded simultaneously, a column has to be embedded prior to excavation. This column is called a pillar column or pre-founded column. Usually a wide flange section is used for these columns. To place the columns, usually the diameter of casing holes needs to be larger than the section of the wide flange itself in order to accommodate a couple of tremie pipes for pouring concrete. In this paper, a newly developed method of using circular pipe as an alternative to the existing wide flange section is discussed. The crucial part of the new method is to develop a connection between the circular column and concrete flat slabs. For shear force transfer from concrete slab to the concrete filled tube (CFT) column, shear jackets with studs and shear bands are proposed. The studs are welded on the jackets at shop and placed around the circular column on site. The shear bands are welded on the outer side of the CFT at shop and inserted into ground with the CFT. Test results and application of the method to a construction site are also provided in this paper.

  • PDF