Top-Down 공사용 선기초기둥의 특성 (Specificity of Prefounded Column for Top-Down Construction)

  • 강승룡;임홍철;김승원;박대영;김동건;송지윤;정미라
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2008년도 추계 학술논문 발표대회
    • /
    • pp.135-139
    • /
    • 2008
  • For deep basement construction of buildings downtown, the usage of Top-Down Method is increasing as much as ever from strong demand. One of the essential elements for the construction by Top Down Method is the pre-founded columns, which are installed in the ground and on which a building is installed. The fact that the pre-founded columns are placed in the ground makes them susceptible to its plumbness; this aspect distinguishes pre-founded columns from general columns. However, there are no criteria for erection tolerance. Therefore, field-measured-data concerning out-of-plumb of pre-founded columns in the construction field should be accumulated and investigated so that criteria and specifications for the erection tolerance of pre-founded columns may be established through the understanding of its aspects. In this paper, we investigate out-of-plumb of pre-founded columns for the construction case and analyze its aspects, and propose considerations for design and construction phase.

  • PDF

Top Down 공사에서의 CFT 선기초기둥 활용방안 (Use of Concrete Filled Tube as a Pre-founded Column for Top Down Construction)

  • 강승룡;임홍철;김승원;김동건;송지윤;정미라;이해출
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2008년도 춘계 학술논문 발표대회
    • /
    • pp.31-34
    • /
    • 2008
  • Construction of buildings downtown is increasing as much as ever with a strong demand. A Top-Down Method is suitable for its advantage in minimizing its disturbance to the neighborhood. In general, the Pre-founded Column, one of the most important aspects of the Top-Down Method, has been made with an H-Shape Steel Column. However, due to its structural and economical benefits, the usage of CFT(Concrete Filled Tube) columns in the place of Pre-founded Columns is increasing. To promote their applications, we analyze the merits of CFT columns by comparing them with I-Shape columns and propose further research.

  • PDF

Top Down 공사현장에 적용되는 현장타설 선기초기둥의 지지력에 관한 연구 (A Study on Bearing Capacity of Cast-In-Place Pre-Founded Columns in Top Down Construction Sites)

  • 변요셉;정경식;김종호;천병식
    • 한국지반환경공학회 논문집
    • /
    • 제12권12호
    • /
    • pp.55-61
    • /
    • 2011
  • 최근 최첨단 정보통신 산업의 발전과 비약적인 교통수단의 개선으로 인해 도심지의 개념이 점차적으로 확대되고 있으며, 지하공간이 대형화, 대심도화 되고 있어 구조물의 건설을 위한 지하굴착방식 또한 건설환경에 발맞춰 변화되게 되었다. 이 중 Top Down 공법은 건축계획과 연계하여 종래의 지하굴착 방식과는 다른 획기적인 방법이며, 그 중 기둥용 선기초기둥은 공사방식이나 공사기간, 공사비에서 매우 중요한 요소 중 하나이다. 따라서 본 연구에서는 이러한 건물 기둥용 선기초기둥에 대하여 현장 검증용 재하시험 결과를 기준으로 설계단계에서의 지지력 산정결과와 비교, 분석을 통해 각 검토방법별 적용성을 고찰해 보고자 하였다. 그 결과 대부분의 설계식은 재하시험 결과에 못미치는 보수적인 결과를 주는 것으로 나타났다. 또한 구조물기초 설치 후 영구하중에 대해 현장타설말뚝 두부에 작용하는 압축응력을 평가해 본 결과 전반적으로 기초와의 구속효과로 인해 작용응력이 감소하는 것으로 나타났다.

시공오차가 있는 선기초기둥에 공장제작보의 설치가 용이한 탑다운공사용 접합기술개발 (Development of Top-Down Connection System to Solve the Problem of Construction Tolerances in Installing Prefabricated Beams to Pre-founded Columns)

  • 김승원;정희원;박대영;김동건;박주현
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2011년도 춘계 학술논문 발표대회 2부
    • /
    • pp.25-30
    • /
    • 2011
  • Almost prefounded columns for top-down construction certainly have construction tolerances in plan and plumbness. Therefore, it is very difficult to connect prefabricated beams to prefounded columns at each floor level after excavation by usual top-down connection method and this usual connection method leads to long construction time, increasing cost and decreasing quality. This paper presents a new method for connecting prefabricated beam to prefounded column with GROUT-JACKET CONNECTION SYSTEM consisting of sleeve, bearing-shear bands and grout. Details and illustrations of the connections and applications by GROUT-JACKET CONNECTION SYSTEM for the top-down construction are also included in this paper.

  • PDF

시공단계를 고려한 피복충전형 콘크리트충전 각형기둥의 구조적 거동 분석 (Structural Behavior Analysis of Concrete Encased and Filled tube Square Column with Construction Sequence)

  • 김선희;염경수;최성모
    • 한국강구조학회 논문집
    • /
    • 제27권1호
    • /
    • pp.43-52
    • /
    • 2015
  • 구조물의 기둥은 층에 따라 받는 내력이 상이함에도 시공의 오차를 줄이고 구조설계의 편의를 위해 상부층부터 하부층의 기둥단면은 동일하게 설계되고 있다. 그럼에도 불가피하게 상하부의 기둥의 단면이 상이하는 경우가 발생된다. 예를들어 초고층 구조물 또는 증축 및 보수에 의해 기둥을 보강할 경우이다. 이렇듯. 선 기둥과 후 피복이 되는 기둥을 피복충전형 콘크리트 충전기둥이라 할 때, 가력조건이 다르므로 재하상태를 나뉘어 구조적 안정성을 확인할 필요가 있다. 그럼에도 국내외적으로 가력조건에 따른 합성기둥에 대한 내력과 변형연구는 전무한 상태에 있다. 따라서 본 연구에서는 구조실험을 통해 가력조건 및 콘크리트 강도, 피복두께 변화에 의한 피복충전형 콘크리트 각형 기둥의 내력과 거동을 분석하였다.

DEVELOPMENT OF CONCRETE FILLED TUBE AS A PILLAR PILE FOR TOP DOWN METHOD

  • Jee-Yun Song;Hong-Chul Rhim;Seung-Weon Kim
    • 국제학술발표논문집
    • /
    • The 3th International Conference on Construction Engineering and Project Management
    • /
    • pp.808-813
    • /
    • 2009
  • Top-down method is widely used for urban area construction for its advantages in reducing environmental problems such as dust and noise, and saving construction cost depending on given conditions of a construction site. Because the excavation and construction of super- and sub-structures of the building have to be proceeded simultaneously, a column has to be embedded prior to excavation. This column is called a pillar column or pre-founded column. Usually a wide flange section is used for these columns. To place the columns, usually the diameter of casing holes needs to be larger than the section of the wide flange itself in order to accommodate a couple of tremie pipes for pouring concrete. In this paper, a newly developed method of using circular pipe as an alternative to the existing wide flange section is discussed. The crucial part of the new method is to develop a connection between the circular column and concrete flat slabs. For shear force transfer from concrete slab to the concrete filled tube (CFT) column, shear jackets with studs and shear bands are proposed. The studs are welded on the jackets at shop and placed around the circular column on site. The shear bands are welded on the outer side of the CFT at shop and inserted into ground with the CFT. Test results and application of the method to a construction site are also provided in this paper.

  • PDF