• Title/Summary/Keyword: Power system operation

Search Result 5,497, Processing Time 0.074 seconds

A Testing Method of Current Deferential Relay Using RTDS (실시간 디지털 시뮬레이터를 이용한 전류차동계전기 개발시험)

  • Kim, Tae-Won;Hong, Sun-Chun;Jang, Byung-Tae;Shin, Jeong-Hoon
    • Proceedings of the KIEE Conference
    • /
    • 1999.07c
    • /
    • pp.1397-1400
    • /
    • 1999
  • The function of newly developed equipments must be verified in real power system before they put into operation. However, it is hard to test them in real power system due to the possibility of abnormal operation. In this paper, test method for new relays is developed in order to simulate their function in real power system using RTDS (Real Time Digital Simulator) and the simulation results show the capability of method.

  • PDF

Analysis on Recloser-Fuse Coordination in a Power Distribution System linked Small Scale Cogeneration System with Superconducting Fault Current Limiter (소형 열병합발전 시스템이 연계된 배전계통에 초전도 전류제한기 적용시 리클로져-퓨즈 협조 분석)

  • Kim, Myoung-Hoo;Kim, Jin-Seok;Moon, Jong-Fil;Lim, Sung-Hun;Kim, Jae-Chul;Lee, Joon-Kyu
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.59 no.3
    • /
    • pp.499-505
    • /
    • 2010
  • This paper analyzed that the coordination of recloser-fuse when a superconducting fault current limiter (SFCL) is installed to a power distribution system linked small scale cogeneration system. As a rule, the recloser to properly protect against both permanent and temporary fault is installed to upstream of fuse. Therefore, in a power distribution system linked small scale cogeneration system, the fault current is increased by adding fault current of small scale Cogeneration system when a permanent fault occurs, and the fuse could melt during the first fast operation of the recloser because of more sufficient heat from the increased current. However, when SFCLs are applied into a power distribution system linked small scale cogeneration system, the coordination of recloser-fuse could be accomplished due to decreased fault current as the effect of the impedance value of the SFCL. Therefore, to solve these problems, we analysed the operation of recloser-fuse coordination in a power distribution system linked small scale cogeneration system with SFCL using PSCAD/EMTDC.

A Design of Advanced Distribution Management System Based on IT/OT Convergence (IT/OT Convergence 기반의 Advanced Distribution Management System의 설계)

  • Lim, Il-Hyung;Lee, Seung-Joo;Park, Jong-Ho;Shin, Yong-Hak
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.65 no.5
    • /
    • pp.753-759
    • /
    • 2016
  • Power automation system to operate power distribution systems can be distinguished by distribution SCADA with remote monitoring and control; and distribution automation system with basic functions such as service restoration to the distribution SCADA; and distribution management system which is operated by various applications in order to enhance distribution system operation performance based on the distribution automation system. In the technological change, a technical boundary of information technology (IT) and operation technology (OT) is being blurred by that new concepts such as interoperability. In addtion, IT/OT convergence has been proposed by the improvement of ICT and power system technology. At the viewpoint, advanced distribution management system (ADMS) to have the new concepts and to increase distribution system operation efficiency through global information and functions from the other systems has been proposed. In order to implement the ADMS, IT and OT have to be employed together on the ADMS; and the concept-based IT/OT convergence concept has been presented. Therefore, this paper introduces ADMS and IT/OT convergence and proposes a design of IT/OT convergence based ADMS system design with configurations and functions.

The Optimal Power Flow Algorithm Considering Load Power Factor Limits (부하역률 제약조건을 고려한 최적 급전 알고리즘)

  • 김광욱;조종만;김진오
    • The Transactions of the Korean Institute of Electrical Engineers A
    • /
    • v.53 no.9
    • /
    • pp.494-499
    • /
    • 2004
  • This paper presents to compute the power economic dispatch, an optimal power flow (OPF) computation algorithm, considering the load power factor limits constraint in developed. Efficient reactive power planning enhances economic operation as well as system security. Accordingly, an adequate level of power factor limits for the load busesshould be evaluated for economic operation. In this paper, the ranges of acceptable load power factors are portrayed as bandwidths of load power factor expressed as a function of load level. The load power factor limits are included and described into the OPF's objective function. The method Proposed is applied to IEEE 26 bus system.

Operation Algorithm of Hybrid Power System for Power Supply in a Remote Island (낙도 전력공급을 위한 복합발전시스템의 운전제어 알고리즘)

  • Kim, E.S.;Kim, S.K.;Lee, C.S.
    • Proceedings of the KIEE Conference
    • /
    • 2001.10a
    • /
    • pp.293-295
    • /
    • 2001
  • In this paper, a control algorithm of a stand-alone type photovoltaic/wind/diesel hybrid power system for operation in a remote island, is proposed in detail. Power controllers are used to combine two different power outputs of photovoltaic and wind-power generations into DC output, which is converted into AC power to meet load while charging the storage battery for later use. In the event that the whole power load cannot be met by photovoltaic and wind power only, power stored in the battery cell is supplied and if even this power run out, diesel generator will be applied. Certain portion of diesel power is used to cover the load and the other to charge the battery.

  • PDF

Daily Maximum Electric Load Forecasting for the Next 4 Weeks for Power System Maintenance and Operation (전력계통 유지보수 및 운영을 위한 향후 4주의 일 최대 전력수요예측)

  • Jung, Hyun-Woo;Song, Kyung-Bin
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.63 no.11
    • /
    • pp.1497-1502
    • /
    • 2014
  • Electric load forecasting is essential for stable electric power supply, efficient operation and management of power systems, and safe operation of power generation systems. The results are utilized in generator preventive maintenance planning and the systemization of power reserve management. Development and improvement of electric load forecasting model is necessary for power system maintenance and operation. This paper proposes daily maximum electric load forecasting methods for the next 4 weeks with a seasonal autoregressive integrated moving average model and an exponential smoothing model. According to the results of forecasting of daily maximum electric load forecasting for the next 4 weeks of March, April, November 2010~2012 using the constructed forecasting models, the seasonal autoregressive integrated moving average model showed an average error rate of 6,66%, 5.26%, 3.61% respectively and the exponential smoothing model showed an average error rate of 3.82%, 4.07%, 3.59% respectively.

Design and Verification of Advanced Distribution Management System using Information and Communication Convergence Technology (ICT융복합 기술을 이용한 차세대 배전계통 운영 시스템 설계 및 검증)

  • Kim, Dongwook;Park, Youngbae;Chu, Cheolmin;Jo, Sungho;Seo, Inyong
    • Journal of Korea Society of Digital Industry and Information Management
    • /
    • v.15 no.4
    • /
    • pp.19-29
    • /
    • 2019
  • Recently, with the rise of environmental issues and the change of government policy (Renewable Energy 3020 Implementation Plan), a large amount of renewable energy such as solar and wind power is connected to the power system, and most of the renewable energy is concentrated in the power distribution network. This causes many problems with the voltage management and the protection coordination of the grid due to the its intermittent power generation. In order to effectively operate the distribution network, it is necessary to deploy more intelligent terminal devices in the field to measure the status of the distribution network and develop various operation functions such as visualization and big data analysis to support the power distribution system operators. In addition, the failover technology must be supported for the non-stop operation of the power distribution system. This paper proposes the system architecture of new power distribution management system to cope with high penetration of renewable energy. To verify the proposed system architecture, the functional unit test and performance measurement were performed.

Functional Properties of Stand-alone Microgrid EMS Application (에너지 자립섬 EMS 어플리케이션의 기능적 특성)

  • Lee, Ha-Lim;Chun, Yeong-Han;Chae, Wookyu;Park, Jungsung
    • KEPCO Journal on Electric Power and Energy
    • /
    • v.2 no.1
    • /
    • pp.115-119
    • /
    • 2016
  • For many past years, research in the operation of stand-alone Microgrid, which provides electric power generated from renewable energy sources and energy storage system instead of diesel generators, has been a major issue in order to prepare the exhaustion of fossil fuel and to protect environment, in island grids. Samso Island, known as the world's first stand-alone Microgrid in Denmark, is connected to the mainland grid through AC system, which has different technical conditions with Korea's isolated power system. Korea's first stand-alone Microgrid has been built in Ga-sa island, Chun-la-nam-do, based on Energy Management System (EMS) operation, and other islands are under construction to follow the next step. These stand-alone Microgrid's has large capacity of Battery Energy Storage System (BESS) and the proportion of the renewable energy sources are large, which makes it necessary to use a Microgrid-Energy Management System (MG-EMS) to operate the grid effectively and economically. However, since the main subject of MG-EMS is different from EMS, specific characteristics and functions must be different as well. In this paper, the necessary characteristics and functions are explained for a general MG-EMS compared to a large power system EMS.

System Development of a 100 kW Molten Carbonate Fuel Cell IV(System commisioning for operation (100 kW급 용융탄산염 연료전지 시스템 개발 IV(MCFC 시스템 시운전))

  • Lim, Hee-Chun;Ahn, Kyo-Sang
    • Proceedings of the KIEE Conference
    • /
    • 2005.07b
    • /
    • pp.1681-1683
    • /
    • 2005
  • The molten carbonate fuel tell(MCFC) is endowed with the high potential especially in future electric power generation industry by its own outstanding characteristics. KEPCO(KEPRI) started a 100 kW MCFC system development program in 1993 and has been executed 100kW system develpilot plant successfully completed first phaseopment by 2005 on the basis of successful results of 25kW system development. In this program, the components and mechanical structure for 100 kW stack and system construction were completed on last year and now system pre-commissioning was being executed. A 100 kW MCFC power plant was constructed at the site of Boryeong Thermal Power Plant. A 100 kW MCFC system has characterized as a high pressure operation mode, $CO_2$ recycle, and externally reforming power generation system. The 100 kW MCFC system consisted with stacks which was made by two 50 kW sub-stacks, 90 cells with 6,000 cm2 active area and BOP including a reformer, a recycle blower, a catalytic burner, an inverter, and etc. The system will be operated under 3 atm pressure condition and expected to last over 5,000 hours by the end of this year.

  • PDF

The Development of Low Cost Power Components Measurement and Record System for Monitoring Electrical Equipment Operation Status (전력설비 동작 상태 감시를 위한 저가형 전력 성분 측정 및 기록 시스템의 개발)

  • Jeon, Jeong-Chay;Oh, Hun
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.16 no.7
    • /
    • pp.4855-4862
    • /
    • 2015
  • This paper proposes low price power component measurement and record system for preventing electrical safety accident and supporting accident cause analysis by periodically monitoring and recording the operation status of electrical equipments. The proposed system was designed by mainly using parts to measure accurate power component but reduce cost. Especially, low cost and high effectiveness system implementation was possible by using MAXIM 78M6631 to calculate power components in the definition of IEEE Standard 1459-2010 related power quality. The measurement performance of the developed system is tested by using standard devices such as YOKOGAWA power analyzer WT1600. The test results showed that accuracy of the developed system is less than 0.5 % and the developed system is tested in a real area to verify the operation reliability and remote monitoring performance of the system over 6 months.