Proceedings of the KIEE Conference (대한전기학회:학술대회논문집)
- 2005.07b
- /
- Pages.1681-1683
- /
- 2005
System Development of a 100 kW Molten Carbonate Fuel Cell IV(System commisioning for operation
100 kW급 용융탄산염 연료전지 시스템 개발 IV(MCFC 시스템 시운전)
- Lim, Hee-Chun (Korea Electric Power Research Institute(KEPRI), KEPCO) ;
- Ahn, Kyo-Sang (Korea Electric Power Research Institute(KEPRI), KEPCO)
- Published : 2005.07.18
Abstract
The molten carbonate fuel tell(MCFC) is endowed with the high potential especially in future electric power generation industry by its own outstanding characteristics. KEPCO(KEPRI) started a 100 kW MCFC system development program in 1993 and has been executed 100kW system develpilot plant successfully completed first phaseopment by 2005 on the basis of successful results of 25kW system development. In this program, the components and mechanical structure for 100 kW stack and system construction were completed on last year and now system pre-commissioning was being executed. A 100 kW MCFC power plant was constructed at the site of Boryeong Thermal Power Plant. A 100 kW MCFC system has characterized as a high pressure operation mode,
Keywords