Kim, Joorak;Park, Chang-Reung;Park, Kijun;Kim, Joo-Uk
Journal of the Korean Institute of Electrical and Electronic Material Engineers
/
v.29
no.4
/
pp.250-254
/
2016
Currently, power conversion system which converts AC to DC Power is applied in domestic urban railway. The diode rectifier is used in most of them. However the diode rectifier can not control the output voltage and can not regenerate power as well. On the other hand, PWM (pulse width modulation) converter using IGBT (isolated gate bipolar transistor) can control output voltage, allowing it to reduce the output voltage drop. Moreover the Bi-directional conduction regenerates power which does not require additional device for power regeneration control. This paper compared the simulation results for the DC power supply system on both the diode rectifier and the PWM converter. Under the same load condition, simulation circuit for each power supply system was constructed with the PSIM (performance simulation and modeling tool) software. The load condition was set according to the resistance value of the currently operating impedance of light rail line, and the line impedance was set according to the distance of each substations. The train was set using a passive resistor. PI (proportional integral) controller was applied to regulate the output voltage. PSIM simulation was conducted to verify that the PWM Converter was more efficient than the diode rectifier in DC Traction power supply system.
There are many difficulties to supply constant power to marine facilities which operate in the sea. Especially, there is a limit to stand alone power supply systems due to the influence of weather conditions. That's why a hybrid power supply system is required to overcome these problems. This paper will describe an Electronic Anti-Fouling System (EAFS) to maximise the power efficiency for a solar - wave hybrid power generation system. A main factor reducing the efficiency of a Wave Energy Converter (WEC) is due to the attachment of aquatic life forms. Therefore the aim of this research is to develop a simulation programme to enable the design of more efficient EAFS for hybrid power generation systems and to provide valuable data for production of more efficient EAFS.
This paper presents a power supply system with pre-regulator using zero voltage switching (ZVS) interleaving two-transistor forward converter for high input voltage and high power application. A SMPS has a advantage that a good efficiency, small size and light weight but has a noise problem. A linear power supply system has a advantage that a good stability, low ripple and noise but has a disadvantage that a big size, low efficiency and heat problem. To alleviate these problems, we propose an power supply system using dual ZVS interleaving two-transistor forward pre-regulator. The proposed converter is verified on a 1kW, 50kHz experimental prototype.
Proceedings of the Korea Society of Information Technology Applications Conference
/
2005.11a
/
pp.233-235
/
2005
Non-contact power supply (NCPS), as a clean and safe energy supply concept has been applying wildly. Comparing with the conventional transformer the non-contact transformer has a large air gap between the long primary winding and the secondary winding. Due to it, the non-contact transformer has increased leakage inductance and reduced magnetizing inductance. So the high frequency series resonant converter has been widly used on the non-contact power supply system for transferring the primary power to the secondary one, from what a high influence voltage can be gained on the secondry coil even though the large air gap exists. However, it still has the disadvantages of the load sensitive voltage gain characteristics when load is changing. In this paper, we propose a fuzzy logic controller to adjust the frequency of the inverter to track the resonat which is changing when the load is change.
In this paper, the design of Power supply for high power magnetron system is stuied. For magnetron drive, three kinds of power supply is required for main high voltage, magnet and heating filament. Detail design was accomplished with basic simulation and real system is developing based on basic design.
The Transactions of the Korean Institute of Electrical Engineers D
/
v.54
no.11
/
pp.654-659
/
2005
An improved power supply for APD(Avalanche Photo Diode) with a received optical power monitoring circuit allows the received optical power increase temporary without of the degradation of the electrical signal. For the cost reduction and simple fabrication, an improved power supply has been proposed that it was designed for driving a APD as a receiving device of a wireless optical transmission system. It was demonstrated that it was possible to improve a dynamic range by compensating the temperature coefficient of the APD up to 1.0 V/$^{\circ}C$ through the power supply. Also, for an efficient transmission at the receiver end, a simple structure of a single cylindrical micro-lens configuration was used in conjunction with the laser diode to partially compensate a laser beam ellipticity. For this purpose, an astigmatism introduced by the micro-lens is utilized for the additional compensation of the beam ellipticity at the receiver end. In this paper, it is demonstrated that an efficient beam shaping is realized by using the proposed configuration consisting of the single lens attached to the laser diode.
Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
/
v.30
no.2
/
pp.49-56
/
2016
In this paper, a prototype of power supply with a power factor correction is proposed. As a unique feature the proposed power supply, a status monitoring circuit is embedded on the switching power supply. The status monitoring circuit analyzes the functionality of the system and saves the key components of the power supply in the case of malfunctions. The results of various fault tests are reported to verify the operation and performance of the proposed method. This paper discusses the experimental results of the monitoring module and provides the technical information to monitor, predict, and troubleshoot the system against the potential failure of power supplies for real applications.
The Transactions of the Korean Institute of Electrical Engineers P
/
v.54
no.2
/
pp.101-107
/
2005
The reduced power quality due to some of disturbances on power system has great influence on the efficient and life of load for bad with serious economic loss. The response of load about disturbance needs to analysis quantitatively in detail to improve load characteristics. In this research, a power supply device is developed to supply disturbed power similar to that of power system. The developed device can output a voltage and frequency from 180[V] to 240[V], 55[Hz] to 65[Hz] respectively. The most outstanding feature of this device is a function to be performed steady and dynamic state characteristic experiment on load or appliances. Also, this device is designed to include high accuracy ouput and simple measurement.
The Transactions of the Korean Institute of Electrical Engineers A
/
v.48
no.5
/
pp.517-523
/
1999
The Start-up transformers or on-site stand-by transformers are installed for the start-up and shut-down of generator and emergency status in unclear power plant. The on-site power supply configuration using these transformers must be detemined by considering configuration requirements, site characteristics, reliability and availability severely because it is remarkably important for safety and benefit of plant. The start-up or stand-by power supply configuration has been determined considering only safety requirements and construction cost up to now in Korea. I study various reliability estimating methods for the prediction of availability, and estimate the unavailability for the start-up power supply system of two 1,000㎿ unclear power plants. I also detemine the reliability and unavailability and unavailavility of equipment, system and configuration using FTA method.
The Transactions of The Korean Institute of Electrical Engineers
/
v.67
no.2
/
pp.186-193
/
2018
Generally, it is difficult to operate moveable-weir due to the expensive cost of the facility management and manpower consumption. Also, when it is installed in a remote area, there is a problem that the cost of connection for power system increases as well as the operating cost. Therefore, this paper proposes an optimal design algorithm to replace an existing power system with an Eco-friendly power supply system for movable-weir using PCS, PV module and lithium-ion battery. Also, this paper proposes a modeling method of environment-friendly power supply system for a movable-weir based on the PSCAD/EMTDC S/W and implements 5[kW] prototype environment-friendly power supply system. As a result of the performance test using the S/W modeling and the prototype system, it is confirmed that the proposed system has stable characteristics in the independent operation mode and the interconnection mode.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.