Recently, there has been growing interest in utilizing cogeneration(COGN) system which has high energy efficiency due to the lacking of energy resource, but insertion of cogeneration system into existing power distribution system can cause several problems such as voltage variations, reenergizing of feeder isolated by fault, increasing fault current because of reverse power of COGN. Also these problems increase the complexity of control, protection, and maintenance of power distribution systems. Hence, some problems according to COGN interconnection operation to power distribution system must be taken into account so that operation and security of power distribution system is not disturbed. This paper deals with momentary voltage variations and fault analysis caused by interconnection operation of COGN.
Park, Se-Jun;Yun, Jeong-Phil;Yoon, Pil-Hyun;Ji, Woon-Seok;Lim, Jung-Yeol;Cha, In-Su
Proceedings of the KIEE Conference
/
2004.04a
/
pp.187-191
/
2004
Photovoltaic and wind power generation have an advantage of unpolluted and unlimited amount of energy resource. Since there is such an advantage in these energies, But photovoltaic system and wind system cannot always generate stable output with ever-changing weather condition. In this paper, the auxiliary power generator for hybrid system(photovoltaic 500[W], wind power generation 400[W]) was suggested. the auxiliary power generator that uses elastic energy of spiral spring to photovoltaic system was also added for present system. when output of photovoltaic system gets lower than 24[V], power was continuously supplied to load through the inverter by charging energy of spiral spring operates in DC generator.
The Journal of Korean Institute of Communications and Information Sciences
/
v.34
no.4A
/
pp.316-323
/
2009
Power allocation of soft frequency reuse(SFR) to increase cell edge user throughput by reducing inter-cell interference is proposed for coordinated cellular systems. SFR is the effective technique to increase cell edge user throughput, however, it costs the degradation of total system throughput. The cost increases when SFR operated in distributed resource controlled systems fails to be fast adaptive in the change of user distribution. The proposed scheme enables coordinated cells to control transmit power adaptively depending on user distribution so that it minimizes the loss of system throughput introduced from SFR while it guarantees enhancement of cell edge user throughput. Through system level simulation considering neighboring two cells, evaluation result for adaptive power allocation is shown compared with static power allocation.
In recent years there has been a growing interest in renewable energy systems due to the environmental problem and the economic benefits of fuel savings. Such systems are usually connected to the existing power grid for "fuel displacement" purpose as well as of earning some "capacity credit". Wind power generation system(WPGS) is one of the most useful energy resource using natural environment. So far, it was very difficult to simulate the dispersed generation system including WPGS using EMTP or EMTDC because the source of the dispersed generation system has a particular wind power characteristic equation. In this paper, a novel simulation method of WPGS has proposed and a new wind turbine component for EMTDC is also developed. The wind power characteristic equation of wind turbine is used in order to realize the WPGS in EMTDC simulation. And the real field data of weather conditions is interfaced to EMTDC using Fortran program interface method. Consequently the simulation of WPGS using field data is realized in this paper and shows acceptable results.
In this paper, we propose a minimal power data path allocation algorithm for low power circuit design. The proposed algorithm minimizes switching activity for input variables in scheduled CDFG. Allocations are further divided into the tasks of register allocation and module allocation. The register allocation algorithm execute that it eliminate spurious switching activity in functional unit and minimize the numbers of multiplexer. Also, resource allocation method selects a sequence of operations for a module such that the switching activity is reduced. Therefore, the algorithm executes to minimize the switching activity of input values, sequence of operations and number of multiplexer. Experimental results using benchmarks show that power is reduction effect from 13% to 17% power consumption, when compared with the Genesis-lp high-level synthesis system.
This study concerns about wireless power generation that uses the energy harvester with EAP actuator. The UWSN(Underwater Wireless Sensor Network) has been considered many times by many researches. Because the information of underwater is getting important to secure the resource or to predict the meteorological phenomena. But the sensor node in the UWSN is driven by the acoustic wave to communicate with other sensor node. And this acoustic wave usually spends a 100 times energy than the RF(Radio Frequency) wave due to transfermation medium(sea water). Therefore the power source of the sensor node is very important that is needed to improve in the UWSN. For this purpose, the energy harvester is made by the acrylic elastomer in this study. And the electrode is modified with an aluminum impurity to improve the efficiency of energy harvester. After that, the modified energy harvester is experimented to confirm the improvement of the energy efficiency.
With the advent of high technologies such as the 4th Industrial Revolution and artificial intelligence and big data, efforts are being made to solve urban problems and improve the quality of life by applying new technologies in the smart city field. In addition, as carbon neutrality has emerged as an important issue due to global warming, smart city energy platform technologies such as urban energy management, efficiency improvement, and carbon reduction are in the spotlight. In order to effectively manage urban energy, energy resource information such as electricity, water, gas, hot water, heating, etc. must be collected from the management system of various energy utilities and managed on the central platform. The centrally integrated data is delivered to external city management systems that require city energy information through an energy platform. This study developed a CIM profile for smart city energy monitoring required to provide energy data to external systems. Electric data model were designed using the CIM class of IEC 61970, and water, gas, and heat data model were designed in compliance with the UML-based design ideas of IEC 61970.
Donghwan Shin;Hyeongwon Lee;Hoon Jung;Joonyoung Choi;Jongyoung Jo
New & Renewable Energy
/
v.19
no.4
/
pp.61-71
/
2023
The necessity of energy utilization using livestock manure has been proposed with the decrease in domestic agricultural land. Livestock manure solid fuel has been investigated as a promising energy resource owing to its convenient storage and use in agricultural and livestock fields. Additional electricity production is possible through the integration of a biomass combustion boiler with the organic Rankine cycle (ORC). In this study, a mathematical system model of the cattle manure solid fuel boiler integrated with the ORC was developed to analyze the components' performance under variable operating conditions. A sensitivity analysis was conducted to confirm the electrical efficiency of the ORC turbine and the applicability of this system. The minimum required waste heat recovery rate was derived considering the system marginal price and levelized cost of electricity of the ORC. The simulation results showed that, in Korea, more than 77.98% of waste heat recovery and utilization in ORC turbines is required to achieve economic feasibility through ORC application.
The Jeju-Korea power system is a small-sized network with a system demand ranging from a autumn minimum of 350MW to a summer peak of 716MW. Because Jeju island is well exposed to north-east winds with high speed, applications to connect to Jeju power system are flooded. Considering physical/environmental constraints, Jeju Self-governing Province has also target for the wind power capacity of 1,350MW by 2020. It amounts to two or three times of Jeju average-demand power and wind power limit capacity announced by Korea Power Exchange (KPX) company. Wind farm connection agreements will be signed to maximize utilization of wind resource. In spite of submarine cable HVDC connected to Korea mainland, Jeju power system is independently operated by frequency and reserve control. This study reevaluates wind power limit based on the KPX criteria from 2016 to 2020. First of all wind power generation limit are affected by off-peak demand in Jeju power system. Also the possibility capacity rate of charging wind power output is evaluated by using energy storage system (ESS). As a result, in case of using 110MWh ESS, wind power limit increases 33~55MW(30~50% of ESS), wind power constraint energy decreases from 68,539MWh to 50,301MWh and wind farm capacity factor increases from 25.9 to 26.1% in 2020.
Journal of electromagnetic engineering and science
/
v.6
no.2
/
pp.117-122
/
2006
This paper presents the impacts of Ultra-wideband(UWB) applied in the communication applications using frequency band from 3.1 GHz to 10.6 GHz on Broadband Wireless Access(BWA) based on orthogonal frequency division multiplexing(OFDM) using frequency band of 3.5 GHz. It proposes low duty cycle(LDC) for enabling UWB to mitigate strong interference to BWA. The effects of interference mitigation are evaluated and analyzed in the environment of UWB coexistence with BWA. UWB with LDC scheme will be given to bring higher transmit power level corresponding to Federal Communications Commission(FCC) provisional limit for enabling UWB operation at 3.5 GHz bands.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.