• Title/Summary/Keyword: Power of test

Search Result 10,118, Processing Time 0.038 seconds

An Assessment of the Accuracy for Digital Radiography Image (디지털 방사선투과영상의 정밀성 평가에 관한 연구)

  • Park, Sang-Ki;Ahn, Yean-Shik;Gil, Doo-Song
    • Journal of Welding and Joining
    • /
    • v.27 no.2
    • /
    • pp.51-56
    • /
    • 2009
  • Film based radiography imaging technique has been applied to the non-destructive test in medical, aircraft, and power industries contributing to the development of the industries. However, the complex process for imaging and analysis has increasingly demanded the reformation of the radiography test. A digital radiography imaging technologies has been com out from the demand. This study was mainly focused on the assessment on the accuracy for the each image from digital radiography test and film radiography test was proven to crate a better image in sensitivity than film radiography test. In the IQI(Image quality indicator) transmission test, one or two more line can be seen in digital image than in film image. When applying to the boiler tube weld, film image is detectable to the 1.0mm depth flaw; and digital image to the 0.5mm depth flaw. As a result of this study, digital radiography technology is determined to enhance the image quality, compared to film radiography technologies

Testbed of Power MOSFET Aging Including the Measurement of On-State Resistance (전력용 MOSFET의 온-상태 저항 측정 및 노화 시험 환경 구축)

  • Shin, Joonho;Shin, Jong-Won
    • The Transactions of the Korean Institute of Power Electronics
    • /
    • v.27 no.3
    • /
    • pp.206-213
    • /
    • 2022
  • This paper presents setting up a laboratory-scale testbed to estimate the aging of power MOSFET devices and integrated power modules by measuring its on-state voltage and current. Based on the aging mechanisms of the component inside the power module (e.g., bond-wire, solder layer, and semiconductor chip), a system to measure the on-state resistance of device-under-test (DUT) is designed and experimented: a full-bridge circuit applies current stress to DUT, and a temperature chamber controls the ambient temperature of DUT during the aging test. The on-state resistance of SiC MOSFET measured by the proposed testbed was increased by 2.5%-3% after 44-hour of the aging test.

Advanced LDC Test Bed Using Energy Recovery Technique for HEVs

  • Kim, Yun-Sung;Jung, Dong-Wook;Lee, Byoung-Kuk
    • Journal of Electrical Engineering and Technology
    • /
    • v.8 no.4
    • /
    • pp.911-919
    • /
    • 2013
  • This paper reports the development of test bed with the energy recovering technique using two-step boost converter. The device is utilized for LDC aging test of Hyundai Motor's LPI AVANTE HEV in mass production. The developed power recycle type test bed is designed as 1.5 kW class to test up to the maximum load power of LDC and is also designed to supply scant power supply up to 500 W after power recycle. The theoretical design analysis and operational characteristics analysis results of test bed are reported, and its practicality and reliability are verified through the test result. Also, the finally developed test bed confirms approximately 79~85 % energy saving effect compared to the usual traditional aging test system.

The Performance Test of Digital PSS Using KEPCO Enhanced Pourer System Simulator(KEPS) (실시간 대규모 전력계통 해석용 시뮬레이터(KEPS)를 이용한 국산 디지털 PSS의 성능 시험)

  • 신정훈;김태균;추진부;백영식
    • The Transactions of the Korean Institute of Electrical Engineers A
    • /
    • v.51 no.12
    • /
    • pp.611-623
    • /
    • 2002
  • This paper introduce the real time digital simulator which is located in Korea Electric Power Research Institute. This paper also describes the methodology for the performance test of the PSS using KEPS. This test is to get a high degree of the confidence of the developed PSS before it is installed into the real power system. This has been performed in the form of closed-loop tests in which Simulator and PSS are connected and signals come and back interactively. Many tests have successfully done using KEPS which consists of 26 RTDS racks, under the large-scale power system. The simulated reduced KEPCO power system contains 88 generators and 295 buses. Through the AVR step, three phase fault and active power variation test, the effectiveness of developed PSS has been proved. This paper also presents the overview of KEPS and hardware of protype PSS.

Testing of hypotheses and detection of known signals under the integrated power the integrated power criterion (적분검파력 결정 기준에서의 가설 검정과 알려진 신호 검파)

  • 김선용;송익호;장태주;김광순
    • The Journal of Korean Institute of Communications and Information Sciences
    • /
    • v.21 no.3
    • /
    • pp.721-730
    • /
    • 1996
  • In this paper, a new test criterion for binary decision problems is proposed. The integrated power flunction over a parameter interval is first itroduced as an extension of the power function. The concept of the most integrated powerful (MIP) test based on the integrated power function is then introduced. The MIP criterion is to masimize the value of the integrated power function in any paricular parameter interval. As an applicationof the MIP test, the known signal detection problem is considered. The test statistic of the MIP detector for known signals is obtained and an approximation to the MIP test statistic is also considered.

  • PDF

A Study on the Performance Evaluation of Transmission Suspension Insulators (송전용 현수애자의 성능평가에 관한 연구)

  • Song, Il-Geun;Kim, Chan-Yeong
    • The Transactions of the Korean Institute of Electrical Engineers C
    • /
    • v.49 no.7
    • /
    • pp.406-411
    • /
    • 2000
  • This paper presents the results of performance confirmation tests for domestic 20 [Ton] transmission suspension insulators which will be widely utilized in transmission lines. The new test methods such as power arc test, steep-front-of-wave flashover voltage test, and etc. which have been only utilized for the distribution insulators were applied in transmission suspension insulators. The properties of metal and cement used in the 20 [Ton] transmission insulators were also evaluated by the various analysis techniques. Based on the results, we evaluated the performance of the transmission suspension insulators.

  • PDF

Research for Installation and Operation of High Temperature Superconducting Cable System (고온 초전도 케이블 시스템 설치 밀 운전을 위한 연구)

  • Choi, Hyung-Sik;Sohn, Song-Ho;Hwang, Si-Dole
    • Proceedings of the KIEE Conference
    • /
    • 2005.07a
    • /
    • pp.653-657
    • /
    • 2005
  • The commercial contract was made firstly in the world for one set of high temperature superconducting(HTS) cable system between buyer, Korea Electric Power Research Institute and seller, Sumitomo Electric Industries, Ltd. in August 2004. After fabrication, test and examination, the HTS cable system will be installed at the KEPRI's test field in Gochang, Jeonbuk province from the time of July 2005. KEPRI is preparing measurement and test facilities for field test of the HTS cable system and carrying out researches into the design and construction of superconducting cable test building, evaluation of cooling performance, measurement of AC loss, analysis of the quench phenomena due to excess current and means of linking the HTS cable system to the existing electric power supplying system. The constitution of, the method to install and the plan of test operation of the HTS cable system will be presented in this paper.

  • PDF

Analysis of Maximum Generating Power Drop of PV Module Under the Continuous Artificial Light Irradiation Test Condition (연속 광조사 조건에서의 태양전지모듈의 연간 최대출력 저하율 변화 예측 분석)

  • Kim, Kyungsoo;Yun, Jaeho
    • Current Photovoltaic Research
    • /
    • v.6 no.3
    • /
    • pp.69-73
    • /
    • 2018
  • PV system is consisted with PV module, inverter and BOS(balance of system). To have robustic operation more than 20 years, the expected and guaranteed durability and reliability of products should be met. Almost components of PV system are qualified through IEC standards at test laboratory. But the qualification certificate of product does not ensure long-term nondefective operation. PV module's expected life time is nowadays more than 20 years and annual maximum power degradation ratio would be less than -1%. But the power degradation ratio is basically based on real data more than several years' record. Developing test method for ensuring annual maximum power degradation ratio is very need because there are many new products every month with new materials. In this paper, we have suggested new test method under continuous artificial light irradiation test condition for analyze expected maximum power drop ratio.

Test of Normality Based on the Normalized Sample Lorenz Curve

  • Kang, Suk-Bok;Cho, Young-Suk
    • Communications for Statistical Applications and Methods
    • /
    • v.8 no.3
    • /
    • pp.851-858
    • /
    • 2001
  • Using the normalized sample Lorenz curve which is introduced by Kang and Cho (2001), we propose the test statistics for testing of normality that is very important test in statistical analysis and compare the proposed test with the other tests in terms of the power of test through by Monte Carlo method. The proposed test is more power than the other tests except some cases

  • PDF

A Study on the Hot Spot Temperature in 154kV Power Transformers

  • Kweon, Dong-Jin;Koo, Kyo-Sun;Woo, Jung-Wook;Kwak, Joo-Sik
    • Journal of Electrical Engineering and Technology
    • /
    • v.7 no.3
    • /
    • pp.312-319
    • /
    • 2012
  • The life of a power transformer is dependent on the life of the cellulose paper, which influenced by the hot spot temperature. Thus, the determination of the cellulose paper's life requires identifying the hot spot temperature of the transformer. Currently, however, the power transformer uses a heat run test is used in the factory test to measure top liquid temperature rise and average winding temperature rise, which is specified in its specification. The hot spot temperature is calculated by the winding resistance detected during the heat run test. This paper measures the hot spot temperature in the single-phase, 154kV, 15/20MVA power transformer by the optical fiber sensors and compares the value with the hot spot temperature calculated by the conventional heat run test in the factory test. To measure the hot spot temperature, ten optical fiber sensors were installed on both the high and low voltage winding; and the temperature distribution during the heat run test, three thermocouples were installed. The hot spot temperature shown in the heat run test was $92.6^{\circ}C$ on the low voltage winding. However, the hot spot temperature as measured by the optical fiber sensor appeared between turn 2 and turn 3 on the upper side of the low voltage winding, recording $105.9^{\circ}C$. The hot spot temperature of the low voltage winding as measured by the optical fiber sensor was $13.3^{\circ}C$ higher than the hot spot temperature calculated by the heat run test. Therefore, the hot spot factor (H) in IEC 60076-2 appeared to be 2.0.