• 제목/요약/키워드: Power boiler

검색결과 517건 처리시간 0.026초

발전소 보일러 급수 주제어 시스템의 개발 (The Development of Boiler Feedwater Master Control System for Power Plant)

  • 임건표;박두용;김종안;이흥호
    • 전기학회논문지
    • /
    • 제61권3호
    • /
    • pp.442-450
    • /
    • 2012
  • Almost domestic power plants are being operated by foreign distributed control system. Many korean power plants are being operated over their lifetime so they need to be retrofitted. So we are developing the distributed control system to solve this problem by our own technique. The simulator was already made to verify the reliability of the algorithms. The unit loop function tests of all algorithms were finished in the actual distributed control system for installation of power plant and their results were satisfactory. The unit loop function tests are for each unit equipment algorithm. So the total operation tests will be made with all algorithms together in the actual distributed control system to be applied to power plant. When the verification through all tests is finished, algorithms with hardware will be scheduled to be installed and operated in the actual power plant. This research result will contribute to the safe operation of the deteriorated power plant and korean electric power supply as well as domestic technical progress. This entire processes and results for the development are written for the example of boiler feedwater master algorithm out of all algorithms in this paper.

침식 해석을 이용한 월 블로워 노즐의 성능 예측 (Performance Evaluation of Wall Blower Nozzle using Erosion Analysis)

  • 백재호;장일광;장용훈
    • Tribology and Lubricants
    • /
    • 제34권5호
    • /
    • pp.175-182
    • /
    • 2018
  • Accumulation of coal ash at the boiler wall reduces combustion and fuel efficiency. The design of a wall blower is important to effectively remove coal ash. We present numerical results for the removal of coal ash from boiler walls of domestic coal-fired power plants, associated with the computational fluid dynamics for the flow from spray nozzle to boiler wall. The numerical model simulates an erosion process in which the multiphase fluid comprising saturated vapor and fluid water is sprayed from the nozzle, and the water particles impact the boiler wall. We adopt the Finnie erosion model for water particles. We obtain the erosion rate density as a function of nozzle angle and its injection angle. As excessive coal ash removal usually induces damage to the boiler wall, the removal operation typically focuses on a large area with uniform depth rather than the maximum removal of coal ash at a specific location. In order to estimate the removal performance of the wall blower nozzle considering several functionality and reliability factors, we evaluate the optimal injection and nozzle angles with respect to the biggest cumulative and highest erosion rates, as well as the widest range and lowest standard deviation of the erosion rate distribution.

전산유동해석을 이용한 100 $MW_e$급 석탄 순산소 연소 실증 보일러의 설계 및 운전조건 평가 (Numerical Simulation of a 100 $MW_e$-scale Wall-fired Boiler for Demonstration of Oxy-coal Combustion)

  • 채태영;박상현;홍재현;양원;이상훈;류창국
    • 한국연소학회지
    • /
    • 제16권2호
    • /
    • pp.1-8
    • /
    • 2011
  • As one of the main technologies for carbon capture and storage in power generation, oxy-coal combustion is being developed for field demonstration in Korea. This study presents the results of numerical simulation for combustion in a single-wall-fired 100 $MW_e$-scale boiler proposed for the initial design of the demonstration plant. Using a commercial CFD code, the detailed combustion, flow and heat transfer characteristics were assessed both for air-mode and oxy-mode combustion. The results show that stable combustion can be achieved in the dual mode operation with the current boiler configuration. However, the differences in the flow pattern and heat transfer between the two combustion modes need to be considered in the design and operation which is mainly due to the larger density and specific heat of $CO_2$ compared to $N_2$. Further development of the boiler design is required using improved numerical modeling for radiative heat transfer and combustion.

계단 응답 모델의 보간을 이용한 화력발전 보일러-터빈 시스템의 동역학 행렬제어(DMC)에 관한 연구 (A Study on Interpolated Step Response Model of Dynamic Matrix Control(DMC) for a Boiler-Turbine System of Fossil Power Plant)

  • 문운철;오석호
    • 조명전기설비학회논문지
    • /
    • 제22권6호
    • /
    • pp.109-115
    • /
    • 2008
  • 동역학 행렬제어(Dynamic Matrix Control) 기법은 각종 산업 현장에서 가장 활발하게 적용되고 있는 고급 제어기법으로, 최근에는 공정제어의 표준 기법으로 인식되고 있다. 동역학 행렬제어에서는 대상 플랜트의 거동을 묘사하기 위하여 계단 응답 모델(Step Response Model)을 이용한다. 한편 화력발전의 보일러-터빈시스템은 심한 비선 형성과 넓은 운전영역으로 인하여 기존의 선형제어기법으로 제어하기에는 그 성능의 한계가 있게 된다. 본 논문에서는 미리 선정된 동작점에서 계단 응답 모델을 개발한 후, 이를 통한 실시간 보간(Interpolation)을 통하여 계단응답 모델을 실시간으로 개선하는 동역학 행렬제어 기법을 제시한다. 제시된 제어 기법은 화력발전의 보일러-터빈 시스템에 적용하여 만족할 만한 제어 성능을 확인하였다.

고압축 폐열회수장치를 구비한 증기보일러에 관한 연구 (A study on the steam boiler with high compression waste heat recovery system)

  • 한규일;조동현
    • 수산해양기술연구
    • /
    • 제53권3호
    • /
    • pp.302-307
    • /
    • 2017
  • An electric steam boiler equipped with a condensate recovery system, which stores the condensate generated after using steam in steam washers, steam cookers, steam irons, and steam cleaners in a condensate tank and supplies compressed air to the condensate tank so that the condensate is recovered to the boiler by the pressure of the compressed air, was studied. In the results of this study, the heat energy balance between the quantity of the heat generated by the non-metallic surface heating element and the quantity of the heat absorbed by the water was good in a range of ${\pm}5%$. In addition, the heat transfer rate increased in proportion to the electric power of the surface heating element heater, the waste heat energy was normally recovered by the recovery of the condensate of the steam boiler equipped with the high compression waste heat recovery system, and the recovery rate of the waste heat exhibited 23%.

Utility AC Frequency to High Frequency ACPower Conversion Circuit with Soft Switching PWM Strategy

  • Sugimura Hisayuki;Ahmed Nabil A.;Ahmed Tarek;Lee Hyun-Woo;Nakaoka Mutsuo
    • KIEE International Transaction on Electrical Machinery and Energy Conversion Systems
    • /
    • 제5B권2호
    • /
    • pp.181-188
    • /
    • 2005
  • In this paper, a DC smoothing filterless soft switching pulse modulated high frequency AC power conversion circuit connected to utility. frequency AC power source is proposed for consumer induction heating hot water producer, steamer and super heated steamer. The operating principle of DC link filterless utility frequency AC-high frequency AC (HF AC) power conversion circuit defined as high frequency cycloinverter is described, which can operate under a principle of ZVS/AVT and power regulation based on alternate asymmetrical PWM in synchronization with the utility frequency single phase AC positive or negative half wave voltage. The dual mode modulation control scheme based on high frequency PWM and commercial frequency AC voltage PDM for the proposed high frequency cycloinverter are discussed to enlarge its soft switching commutation operating range for wide HF AC power regulation. This high frequency cycloinverter is developed for high frequency IH Dual Packs Heater (DPH) type boiler used in consumer and industrial fluid pipeline systems. Based on the experiment and simulation results, this high frequency cycloinverter is proved to be suitable for the consumer use IH-DPH boiler and hot water producers. The cycloinverter power regulation and power conversion efficiency characteristics are evaluated and discussed.

발전설비 보일러 튜브용 X20강의 가속열처리에 의한 재질 열화 (Material Degradation of X20 Steel (12Cr-1MoVNi) for Boiler Tube of Power Plant)

  • 최병학;윤기봉;이남혁;김신;이길재;김광호;권동일
    • 대한금속재료학회지
    • /
    • 제46권5호
    • /
    • pp.276-282
    • /
    • 2008
  • Material degradation of Cr steels in boiler tubes was accompanied by the microstructural changes including carbide behavior and crack formation. The microstructural change and the mechanical behavior of hardness and creep properties in accelerated heat-treatments were studied in order to identify the material degradation of the X20 Cr steel. The degradation behavior was occurred in the hardness increasing followed by decreasing due to carbide dissolution and precipitation.

Operation optimization of auxiliary electric boiler system in HTR-PM nuclear power plant

  • Du, Xingxuan;Ma, Xiaolong;Liu, Junfeng;Wu, Shifa;Wang, Pengfei
    • Nuclear Engineering and Technology
    • /
    • 제54권8호
    • /
    • pp.2840-2851
    • /
    • 2022
  • Electric boilers (EBs) are the backup steam source for the auxiliary steam system of high-temperature gas-cooled reactor nuclear power plants. When the plant is in normal operations, the EB is always in hot standby status. However, the current hot standby operation strategy has problems of slow response, high power consumption, and long operation time. To solve these problems, this study focuses on the optimization of hot standby operations for the EB system. First, mathematical models of an electrode immersion EB and its accompanying deaerator were established. Then, a control simulation platform of the EB system was developed in MATLAB/Simulink implementing the established mathematical models and corresponding control systems. Finally, two optimization strategies for the EB hot standby operation were proposed, followed by dynamic simulations of the EB system transient from hot standby to normal operations. The results indicate that the proposed optimization strategies can significantly speed up the transient response of the EB system from hot standby to normal operations and reduce the power consumption in hot standby operations, improving the dynamic performance and economy of the system.

신호흐름도 모델을 이용한 화력 발전소 드럼형 보일러 시뮬레이터의 개발에 관한 연구 (A Study on the Development of Drum-Type Boiler Simulator for Thermal Power Plant Using the Signal Flow Diagram Model)

  • 김재선;황동환;김병국
    • 대한전기학회논문지
    • /
    • 제39권12호
    • /
    • pp.1269-1280
    • /
    • 1990
  • Owing to the need to accommodate the load variation, thermal power plants need a modern controller in order to achieve better frequency regulation, faster response and higher efficiency. For a successful development of the digital instrumentation and control system that can adopt advanced control algorithms, power plant simulator must be available for safe and convenient test. In this paper, a simple drum-type boiler model is proposed using Signal Flow Diagram that describes the system by a combination of basic time responses representing the relationships between cause and effect process variables. After verifying the model and thereafter building a simulator based on the proposed model, we tested the operation of the controller and stability or efficiency of the implemented control algorithms.

  • PDF

화력 발전용 드럼 보일러-터빈 시스템의 모델링에 관한 연구 (A Study on Thermal Power Plant Drum Boiler-Turbine System Modeling)

  • 김우헌;문운철
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2011년도 제42회 하계학술대회
    • /
    • pp.1804-1805
    • /
    • 2011
  • In recent year there has been an increasing interest in the dynamic simulation of complex systems. This study uses a large-scale forty-seventh order fossil fuel power plant. Twenty-three state variables are associated with the physical processes and twenty-four state variables associated with the control system. The plant model is expected to predict all dominant effects in a steady and transient state. In this study, the power plant model is reorganized into four subsystems, each with its controller, and the four connected to each other through a manager, which is a fifth part to the system. The four parts of the unit are the boiler system, steam turbine system, condenser system, and feedwater system.

  • PDF