• 제목/요약/키워드: Power Transmission Lines

검색결과 666건 처리시간 0.034초

765kV 가공 송전선로용 OPGW 시설공법 (Installation methods of OPGW for 765kV overhead power transmission lines)

  • 권영길;김영;이성혁
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 1998년도 하계학술대회 논문집 E
    • /
    • pp.1641-1643
    • /
    • 1998
  • In recent the maximum voltage of overhead power transmission lines in Korea was upgraded to 765kV. In general a overhead ground wire is installed for protecting overhead power transmission lines from lightning. For the 765kV line, Composite Overhead Ground Wire with Optic Fiber (OPGW) is applied as a overhead ground wire and have a function of the communication line between substations. In this paper, the construction and properties of OPGW, and its installation methods are discribed.

  • PDF

Transmission Lines Rights-of-Way Mapping Using a Low-cost Drone Photogrammetry

  • Oh, Jae Hong;Lee, Chang No
    • 한국측량학회지
    • /
    • 제37권2호
    • /
    • pp.63-70
    • /
    • 2019
  • Electric transmission towers are facilities to transport electrical power from a plant to an electrical substation. The towers are connected using wires considering the wire tension and the clearance from the ground or nearby objects. The wires are installed on a rights-of-way that is a strip of land used by electrical utilities to maintain the transmission line facilities. Trees and plants around transmission lines must be managed to keep the operation of these lines safe and reliable. This study proposed the use of a low-cost drone photogrammetry for the transmission line rights-of-way mapping. Aerial photogrammetry is carried out to generate a dense point cloud around the transmission lines from which a DSM (Digital Surface Model) and DTM (Digital Terrain Model) are created. The lines and nearby objects are separated using nDSM (normalized Digital Surface Model) and the noises are suppressed in the multiple image space for the geospatial analysis. The experimental result with drone images over two spans of transmission lines on a mountain area showed that the proposed method successfully generate the rights-of-way map with hazard nearby objects.

가공송전선로의 비상용량 응용과 평가 (Application and Evaluation of Emergency Rates in Overhead Transmission Lines)

  • 김성덕
    • 전기전자학회논문지
    • /
    • 제18권4호
    • /
    • pp.442-446
    • /
    • 2014
  • 본 논문에서는 ACSR 가공송전선로의 전력공급 신뢰도를 증진시키기 위한 비상정격의 적용방안에 대하여 기술하였다. 전력산업의 재편으로 인하여 한국전력은 물론 세계의 대부분 전력회사들은 새로운 투자를 하지 않으면서 경제적인 전략들만 모색하여 왔다. 그러나 전력수요가 급격히 증가하였으나 발전량의 증가는 충분히 따라가지 못했다. 따라서 첨두부하 시나 송전선로의 고장의 경우에 기존 송전선로의 송전용량을 증가시키기 위하여, 단시간 또는 장시간정격과 같은 비상용량을 적용하는 방법을 제안한다. 만약 첨두부하시, 정적송전용량 대신에 장시간 비상용량을 적용하면 10 % 또는 그 이상의 전력증대가 가능하다. 또한 2회선 송전선로 중 1회선 고장이나 과부하 경우에 비상용량이 효과적으로 사용될 수 있음을 확인하였다.

154kV 송전선로 피뢰기 설치용 아킹혼 개발 (Development of Arc-horn to be mounted on 154kV Transmission Line Arrester)

  • 민병욱;김우겸;이북창;최한열;박재웅;금의연
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2008년도 제39회 하계학술대회
    • /
    • pp.335-336
    • /
    • 2008
  • Overhead transmission lines are mainly crossing mountainous area. They are easily affected in weathers like typhoon, strong wind, lightning, heavy rain, or heavy snow. Sometimes these weathers cause transmission line faults. A lightning flashover is most often fault. Nowadays lightning density in KOREA is growing high and lightning flashovers occur more often. A lightning flashover on transmission line is mostly cleared by momentary operation of a circuit breaker, so power failure happens rarely. However, when both circuits trip simultaneously due to the lightning flashovers on double circuit transmission line, short time power failure and voltage drop happen. KEPCO has used transmission line arresters to avoid double circuit simultaneous trip out since 2003. And transmission line arresters cannot be installed with KEPCO's present metal fittings, so various fittings have been used for each transmission line arrester manufacturer. This paper introduces development and standardization of arc-horn and metal fittings for transmission line arrester which can be used for both existing lines and new lines in KEPCO.

  • PDF

Modified Wilkinson Power Divider Using Transmission Lines for Various Terminated Impedances and an Arbitrary Power Ratio

  • Yoon, Young-Chul;Kim, Young
    • Journal of electromagnetic engineering and science
    • /
    • 제19권1호
    • /
    • pp.42-47
    • /
    • 2019
  • This paper introduces a modified Wilkinson power divider that uses uniform transmission lines for various terminated impedances and an arbitrary power ratio. For the designed power ratio, the proposed divider changes only the electrical lengths of the transmission lines between the input and output ports, and those between the output ports and the isolation resistor. In this case, even when various termination impedances of the ports exist, the divider characteristics are satisfied. To verify the feasibility of the proposed divider, two circuits were designed to operate at a frequency of 2 GHz with 2:1 and 4:1 power splitting ratios and various terminated impedances of 40, 70, and $60{\Omega}$ for one circuit, and 50, 70, and $60{\Omega}$ for the other. The measurement and simulation results were in good agreement.

대정전 계통 복구를 위한 시송전 선로에 관한 연구 (A Study on transmission lines energized initially to restore wide black out Power system)

  • 이흥재;김균도;박성민;배주천;황봉환;홍순천;김기동;이남호
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2001년도 하계학술대회 논문집 A
    • /
    • pp.377-379
    • /
    • 2001
  • When a wide area blackout occurres, reenergizing transmission lines should be done at first. The KEPCO(Korea Electric Power Corporation) divides whole power system grid into seven subsystem, and each subsystem has one of two blackstart power plants which are usually hydro or combined-combustion type, one priority power plant which should be first supplied with electric energy, and transmission lines between them. Voltage rising, line charging, and operation stability problem should be considered when these lines are reenergized. In this paper, building-up process for primary transmission system that should be energized at first is analyzed.

  • PDF

국내 가공송전선로 절연설계기술의 발전 및 적용 (Progress and application on the insulation design of overhead transmission line in Korea)

  • 유철환;김경호;박순규
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2000년도 하계학술대회 논문집 A
    • /
    • pp.416-418
    • /
    • 2000
  • Main power transmission network in Korea is consist of 154kV, 345kV transmission lines. Also 765kV transmission lines are on construction currently. There are some differences in the insulation design concept, methods and contents on 154kV, 345kV and 765kV overhead transmission lines respectively. In this paper, we described and summarized the applied insulation design concept, methods and features on each transmission lines.

  • PDF

A Study on the Fuzzy ELDC of Composite Power System Based on Probabilistic and Fuzzy Set Theories

  • Park, Jaeseok;Kim, Hongsik;Seungpil Moon;Junmin Cha;Park, Daeseok;Roy Billinton
    • KIEE International Transactions on Power Engineering
    • /
    • 제2A권3호
    • /
    • pp.95-101
    • /
    • 2002
  • This paper illustrates a new fuzzy effective load model for probabilistic and fuzzy production cost simulation of the load point of the composite power system. A model for reliability evaluation of a transmission system using the fuzzy set theory is proposed for considering the flexibility or ambiguity of capacity limitation and overload of transmission lines, which are subjective matter characteristics. A conventional probabilistic approach was also used to model the uncertainties related to the objective matters for forced outage rates of generators and transmission lines in the new model. The methodology is formulated in order to consider the flexibility or ambiguity of load forecasting as well as capacity limitation and overload of transmission lines. It is expected that the Fuzzy CMELDC (CoMposite power system Effective Load Duration Curve) proposed in this study will provide some solutions to many problems based on nodal and decentralized operation and control of an electric power systems in a competitive environment in the future. The characteristics of this new model are illustrated by some case studies of a very simple test system.

EMTP/ATPDraw를 이용한 가스절연송전선로(GIL)의 과전압 분석 (An Analysis on the Overvoltage in Gas Insulated Transmission Lines with EMTP/ATPDraw)

  • 박흥석;한상옥
    • 전기학회논문지
    • /
    • 제60권5호
    • /
    • pp.999-1004
    • /
    • 2011
  • Nowadays, it is becoming difficult to secure a transmission line route when a new transmission line is constructed due to social environment and resident complaints. As existing urban areas are expanded and new cities are constructed, the necessity of high-capacity underground power transmission has been increasing because of load concentration in downtown areas. In North America, Europe and Japan, the research has been carried out for 2nd generation gas insulated transmission lines(GIL) which is more environmentally friendly and economical compared to previous GILs. The new GILs have been applied to real power systems from early 2000s. In South Korea, GIL is being considered as a possible solution for replacing 345kV high-capacity overhead transmission lines with underground transmission ones, so KEPCO is planning to develop and apply a new 362kV rated GIL underground transmission lines instead of overhead transmission lines. In this paper, the overvoltage generated at the combined transmission line adapting GIL was reviewed using EMTP.

송전 선로의 과부하를 고려한 복합 전력계통의 공급능력평가 (Adequacy Evaluation of Composite Power System considering Overload of Transmission Lines)

  • 강성록;최재석;차준민;노대석;도대호
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2002년도 하계학술대회 논문집 A
    • /
    • pp.172-174
    • /
    • 2002
  • This paper proposes a new methodology for adequacy evaluation of composite power system considering an ambiguity of overload of transmission lines. Nodal arrival powers under considering an ambiguity of overload of transmission lines can be evaluated using the proposed method. Fuzzy set theory has been used in order to consider the permission level of overload of transmission lines. The problem of adequacy evaluation has been formulated using fuzzy linear programing. The effectiveness of the proposed method considering permissible overload of transmission lines has been demonstrated on the IEEE RTS.

  • PDF