A Study on transmission lines energized initially to restore wide black out Power system

대정전 계통 복구를 위한 시송전 선로에 관한 연구

  • Published : 2001.07.18

Abstract

When a wide area blackout occurres, reenergizing transmission lines should be done at first. The KEPCO(Korea Electric Power Corporation) divides whole power system grid into seven subsystem, and each subsystem has one of two blackstart power plants which are usually hydro or combined-combustion type, one priority power plant which should be first supplied with electric energy, and transmission lines between them. Voltage rising, line charging, and operation stability problem should be considered when these lines are reenergized. In this paper, building-up process for primary transmission system that should be energized at first is analyzed.